HL incident on 2013-04-06 — TX

Operator
Ccps Transportation, Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,000
Incident datetime
2013-04-06 14:20
Report number
Location
TX
Narrative
On april 6 at approximately 14:20, contractors were hydro excavating at gunn station on line 55 in preparation of upcoming flow meter installation. While hydro excavating, oil starting seeping from the ground and entering excavation. A number of small diameter pipes were in the area and it was anticipated that an old abandoned 2" line from a sample building was the source of the leak. Initially, 3 gallons of oil was estimated to have leaked. After further excavation and exposing of the old 2" line, it was determined that the threaded connection was the source of the leak. Enbridge reported the release to the nrc upon determination that the leak met the reporting criteria and would exceed the $50,000 and 5 gallon threshold. It's estimated that approximately 10 gallons of oil had leaked out from the piping and 178 cubic yards of contaminated soil has been removed from the release site. The piping was cut out and removed.
Detailed record list
Report Received Date
2013-05-06 00:00:00
Iyear
2013
Report Number
20130162
Supplemental Number
18282
Report Type
Supplemental Final
Operator Id
Name
Ccps Transportation, Llc
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2013-04-06 14:20:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.24
Recovered Bbls
0.17
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2013-04-06 14:20:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Leak Was From An Abandoned 2" Line
On Site Datetime
2013-04-06 14:20:00
Nrc Rpt Datetime
2013-04-08 10:03:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Gunn Station Drain Piping
Onshore State Abbreviation
Mo
Onshore Postal Code
64701
Onshore City Name
Harrisonville
Onshore County Name
Cass
Designated Location
Milepost/valve Station
Designated Name
L55
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
20
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
1955
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
100
Est Cost Prop Damage
1000
Est Cost Emergency
124000
Est Cost Environmental
75000
Est Cost Other
0
Prpty
200100
Accident Psig
0
Mop Psig
0
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Threaded Fitting
Additional Thermal Ind
Yes
Preparer Name
S**** S****
Preparer Title
Compliance Assistant
Preparer Email
S**********@e*******.com
Preparer Telephone
218-464-5754
Preparer Fax
218-464-5991
Prepared Date
2013-07-12 00:00:00
Authorizer Name
D**** S*******
Authorizer Telephone
218-464-5751
Authorizer Title
Manager Us Pipeline Compliance
Authorizer Email
D*************@e*******.com
Narrative
On april 6 at approximately 14:20, contractors were hydro excavating at gunn station on line 55 in preparation of upcoming flow meter installation. While hydro excavating, oil starting seeping from the ground and entering excavation. A number of small diameter pipes were in the area and it was anticipated that an old abandoned 2" line from a sample building was the source of the leak. Initially, 3 gallons of oil was estimated to have leaked. After further excavation and exposing of the old 2" line, it was determined that the threaded connection was the source of the leak. Enbridge reported the release to the nrc upon determination that the leak met the reporting criteria and would exceed the $50,000 and 5 gallon threshold. It's estimated that approximately 10 gallons of oil had leaked out from the piping and 178 cubic yards of contaminated soil has been removed from the release site. The piping was cut out and removed.
Report Received Date 2013-05-06 00:00:00
Iyear 2013
Report Number 20130162
Supplemental Number 18282
Report Type Supplemental Final
Operator Id 32080 PHMSA Enforcement
Name Ccps Transportation, Llc
Operator Street Address 915 N Eldridge Parkway, Suite 1100
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77079
Local Datetime 2013-04-06 14:20:00
Location Latitude 38.58556 Google Maps OpenStreetMap
Location Longitude -94.22335 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.24
Recovered Bbls 0.17
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2013-04-06 14:20:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Leak Was From An Abandoned 2" Line
On Site Datetime 2013-04-06 14:20:00
Nrc Rpt Datetime 2013-04-08 10:03:00
Nrc Rpt Num 1043260 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Gunn Station Drain Piping
Onshore State Abbreviation Mo
Onshore Postal Code 64701
Onshore City Name Harrisonville
Onshore County Name Cass
Designated Location Milepost/valve Station
Designated Name L55
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 20
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year 1955
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 100
Est Cost Prop Damage 1000
Est Cost Emergency 124000
Est Cost Environmental 75000
Est Cost Other 0
Prpty 200100
Accident Psig 0
Mop Psig 0
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Threaded Fitting
Additional Thermal Ind Yes
Preparer Name S**** S****
Preparer Title Compliance Assistant
Preparer Email S**********@e*******.com
Preparer Telephone 218-464-5754
Preparer Fax 218-464-5991
Prepared Date 2013-07-12 00:00:00
Authorizer Name D**** S*******
Authorizer Telephone 218-464-5751
Authorizer Title Manager Us Pipeline Compliance
Authorizer Email D*************@e*******.com
Narrative On april 6 at approximately 14:20, contractors were hydro excavating at gunn station on line 55 in preparation of upcoming flow meter installation. While hydro excavating, oil starting seeping from the ground and entering excavation. A number of small diameter pipes were in the area and it was anticipated that an old abandoned 2" line from a sample building was the source of the leak. Initially, 3 gallons of oil was estimated to have leaked. After further excavation and exposing of the old 2" line, it was determined that the threaded connection was the source of the leak. Enbridge reported the release to the nrc upon determination that the leak met the reporting criteria and would exceed the $50,000 and 5 gallon threshold. It's estimated that approximately 10 gallons of oil had leaked out from the piping and 178 cubic yards of contaminated soil has been removed from the release site. The piping was cut out and removed.

All rights reserved. Copyright © by ClearPHMSA