Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2013-08-13 — RI
Operator
Niagara Mohawk Power Corp
Cause
Notification Issue
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2013-08-13 11:19
Report number
Location
RI, PROVIDENCE
Narrative
Damage was caused by third partry contractor installing signal lines for the town of smithfield, ri. Site tech, the third party contractor, was using a vermeer to excavate and punctured our 6" main. The root casue of this damage was due to the contractor's negligence, in not complying with proper dig safe procedures.
Detailed record list
Occurred At
2013-08-13 11:19:00
Year
2013
Report Received Date
2013-09-08 00:00:00
Iyear
2013.0
Report Number
20130100.0
Supplemental Number
15723.0
Report Type
Original Final
Operator Id
13480
Name
Niagara Mohawk Power Corp
Operator Street Address
300 Erie Boulevard West
Operator City Name
Syracuse
Operator State Abbreviation
NY
Operator Postal Code
13202
Local Datetime
2013-08-13 11:09:00
Location Street Address
Rocky Hill Road & Rte 116
Location City Name
Smithfield
Location County Name
Providence
Location State Abbreviation
RI
Location Postal Code
02917
Location Latitude
41.896209
Location Longitude
-71.520863
Nrc Rpt Datetime
2013-08-15 12:55:00
Nrc Rpt Num
1057207
Commodity Released Type
Natural Gas
Unintentional Release
945.8
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2013-08-13 11:19:00
On Site Datetime
2013-08-13 11:35:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Exposed Due To Excavation
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1969.0
Pipe Diameter
6.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Mechanical Puncture
Puncture Axial
3.0
Puncture Circum
3.0
Class Location Type
Class 4 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
0.0
Est Cost Emergency
25000.0
Est Cost Other
800.0
Est Cost Other Details
Restoration & Paving Costs.
Est Cost Unintentional Release
3384.0
Prpty
29184.0
Commercial Affected
0.0
Industrial Affected
1.0
Residences Affected
0.0
Accident Psig
30.9
Normal Psig
32.0
Mop Psig
35.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Notification From Third Party That Caused The Incident
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The incident was caused by a third party damaging the company's gas main and the controllers were communicating with the company's gas dispatch group about what information the scada system was providing to them about the incident as the incident was unfolding. The communications between the two groups, each of which had individual pieces of information presented to them by two different sources, provided the complete picture of the incident and it's affect on the gas system in that area. Ther
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
State Highway
Excavator Type
Contractor
Excavator Equipment
Trencher
Work Performed
Traffic Signal
One Call Notified Ind
No
Locator Type
Unknown/other
Visible Marks
Yes
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
K******* M*******
Preparer Title
Manager
Preparer Email
K****************@n***********.com
Preparer Telephone
508-421-7450
Preparer Fax
508-357-4735
Authorizer Name
G*** B******
Authorizer Title
Director
Authorizer Telephone
617-839-7208
Authorizer Email
G***********@n***********.com
Narrative
Damage was caused by third partry contractor installing signal lines for the town of smithfield, ri. Site tech, the third party contractor, was using a vermeer to excavate and punctured our 6" main. The root casue of this damage was due to the contractor's negligence, in not complying with proper dig safe procedures.
| Occurred At | 2013-08-13 11:19:00 |
|---|---|
| Year | 2013 |
| Report Received Date | 2013-09-08 00:00:00 |
| Iyear | 2013.0 |
| Report Number | 20130100.0 |
| Supplemental Number | 15723.0 |
| Report Type | Original Final |
| Operator Id | 13480 PHMSA Enforcement |
| Name | Niagara Mohawk Power Corp |
| Operator Street Address | 300 Erie Boulevard West |
| Operator City Name | Syracuse |
| Operator State Abbreviation | NY |
| Operator Postal Code | 13202 |
| Local Datetime | 2013-08-13 11:09:00 |
| Location Street Address | Rocky Hill Road & Rte 116 |
| Location City Name | Smithfield |
| Location County Name | Providence |
| Location State Abbreviation | RI |
| Location Postal Code | 02917 |
| Location Latitude | 41.896209 Google Maps OpenStreetMap |
| Location Longitude | -71.520863 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2013-08-15 12:55:00 |
| Nrc Rpt Num | 1057207 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 945.8 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2013-08-13 11:19:00 |
| On Site Datetime | 2013-08-13 11:35:00 |
| Federal | No |
| Location Type | Public Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Exposed Due To Excavation |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 1969.0 |
| Pipe Diameter | 6.0 |
| Pipe Specification | Unknown |
| Pipe Manufacturer | Unknown |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Release Type | Mechanical Puncture |
| Puncture Axial | 3.0 |
| Puncture Circum | 3.0 |
| Class Location Type | Class 4 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 0.0 |
| Est Cost Emergency | 25000.0 |
| Est Cost Other | 800.0 |
| Est Cost Other Details | Restoration & Paving Costs. |
| Est Cost Unintentional Release | 3384.0 |
| Prpty | 29184.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 1.0 |
| Residences Affected | 0.0 |
| Accident Psig | 30.9 |
| Normal Psig | 32.0 |
| Mop Psig | 35.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Accident Identifier | Notification From Third Party That Caused The Incident |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The incident was caused by a third party damaging the company's gas main and the controllers were communicating with the company's gas dispatch group about what information the scada system was providing to them about the incident as the incident was unfolding. The communications between the two groups, each of which had individual pieces of information presented to them by two different sources, provided the complete picture of the incident and it's affect on the gas system in that area. Ther |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | No |
| Notify Cga Dirt | No |
| Public Row Ind | Yes |
| Public Subtype | State Highway |
| Excavator Type | Contractor |
| Excavator Equipment | Trencher |
| Work Performed | Traffic Signal |
| One Call Notified Ind | No |
| Locator Type | Unknown/other |
| Visible Marks | Yes |
| Root Cause Category | Notification Issue |
| Root Cause Type | No Notification Made To The One-Call Center/811 |
| Preparer Name | K******* M******* |
| Preparer Title | Manager |
| Preparer Email | K****************@n***********.com |
| Preparer Telephone | 508-421-7450 |
| Preparer Fax | 508-357-4735 |
| Authorizer Name | G*** B****** |
| Authorizer Title | Director |
| Authorizer Telephone | 617-839-7208 |
| Authorizer Email | G***********@n***********.com |
| Narrative | Damage was caused by third partry contractor installing signal lines for the town of smithfield, ri. Site tech, the third party contractor, was using a vermeer to excavate and punctured our 6" main. The root casue of this damage was due to the contractor's negligence, in not complying with proper dig safe procedures. |