Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2013-05-29 — NY
Operator
Consolidated Edison Co Of New York
Cause
Equipment Failure
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$600,000
Incident datetime
2013-05-29 06:02
Report number
Location
NY, BRONX
Narrative
At 06:02 on may 29, 2013 procedure mpc 13-19 was initiated due to the investigation of leak (xl13001342) in the vicinity of the transmission system at this location. In addition to the 20" transmission main (operating at less than 20% smys), located in this vicinity is the 12" transmission straddle connections supplying tp-hp-mp gr-102, (3) transmission valves and associated fittings as well as 12" low pressure polyethylene (lppe) and 12" low pressure cast iron distribution mains and services. Contingency b13-044; case 20 & 21-a was placed in effect. At 09:16 isolation of the affected segment was achieved and pressure was reduced from 200 psi to 60 psi per this procedure and excavation operations began. The (3) valves at this location (20" main line v-7583 and 12" inlets v-7584/7585) were investigated for a possible source of the suspected leak and a visible leak on the bleed connection to the valve body of 12" inlet v-7585. Additionally, a visible leak on a .5" relief valve bottom of the body of 20" v-7583 was located under the gear box. This valve's outer flanges were abated and visible leaks were located on bolts of the south flange at the 6-8 o'clock position. Attempts to repair the leaks were not successful and an operational plan was identified for the replacement of the 20" main line valve, (2) 12" inlet valves to gr-102 and associated piping. Pressure reduction in the affected segment of transmission main was achieved and the operational plan continued around-the-clock. On june 9, 2013 installation of approximately 12' of 20'' pipe and 8' of 12" pipe associated with the (3) replacement valves was completed. All welding was tested and passed successully. Leak survey monitored the isolated segment of main as pressure was restored incrementally and no leaks were detected. At 14:53 normal system conditions resumed. There was no migration beyond the open excavation; all subsurface structures remained gas free during this operation. There were no reported outages or negative system impact as a result of this procedure. There were no injuries, evacuations or media attention reported. The US DOT, psc, dep was notified and the fdny was notified under the transmission leak notification protocol. The serious level incident was terminated.
Detailed record list
Occurred At
2013-05-29 06:02:00
Year
2013
Report Received Date
2013-06-25 00:00:00
Iyear
2013.0
Report Number
20130078.0
Supplemental Number
15885.0
Report Type
Supplemental Final
Operator Id
2704
Name
Consolidated Edison Co Of New York
Operator Street Address
4 Irving Place
Operator City Name
New York
Operator State Abbreviation
NY
Operator Postal Code
10003
Local Datetime
2013-05-29 06:02:00
Location Street Address
Intersection Of Castle Hill And Westchester Avenues
Location City Name
New York
Location County Name
Bronx
Location State Abbreviation
NY
Location Postal Code
10462-4807
Location Latitude
40.8342275
Location Longitude
-73.851659
Nrc Rpt Datetime
2013-05-30 04:04:00
Nrc Rpt Num
1048708
Commodity Released Type
Natural Gas
Unintentional Release
3.5
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2013-05-29 06:02:00
On Site Datetime
2013-05-29 06:02:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
36.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Main
Installation Year
1971.0
Pipe Diameter
20.0
Pipe Specification
Unknown
Pipe Manufacturer
Unknown
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Wt Steel
0.375
Release Type
Leak
Leak Type
Seal Or Packing
Class Location Type
Class 4 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
600000.0
Est Cost Emergency
2500.0
Est Cost Other
0.0
Est Cost Unintentional Release
10.0
Prpty
602510.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
200.0
Normal Psig
200.0
Mop Psig
245.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Leak on valve connection did not result in pressure drop or increased flow.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Valve
Eq Failure Type
Valve
Valve Other Ind
Other
Valve Other Details
Leak At Bolted Connection On 20" Valve Body
Preparer Name
K**** F****
Preparer Title
Operations Manager-Gas Emergency Response Center
Preparer Email
F*****@c****.com
Preparer Telephone
718-319-2310
Preparer Fax
718-597-5463
Authorizer Name
V***** D******
Authorizer Title
Department Manager-Gas Emergency Response Center
Authorizer Telephone
718-319-2350
Authorizer Email
D*******@c****.com
Narrative
At 06:02 on may 29, 2013 procedure mpc 13-19 was initiated due to the investigation of leak (xl13001342) in the vicinity of the transmission system at this location. In addition to the 20" transmission main (operating at less than 20% smys), located in this vicinity is the 12" transmission straddle connections supplying tp-hp-mp gr-102, (3) transmission valves and associated fittings as well as 12" low pressure polyethylene (lppe) and 12" low pressure cast iron distribution mains and services. Contingency b13-044; case 20 & 21-a was placed in effect. At 09:16 isolation of the affected segment was achieved and pressure was reduced from 200 psi to 60 psi per this procedure and excavation operations began. The (3) valves at this location (20" main line v-7583 and 12" inlets v-7584/7585) were investigated for a possible source of the suspected leak and a visible leak on the bleed connection to the valve body of 12" inlet v-7585. Additionally, a visible leak on a .5" relief valve bottom of the body of 20" v-7583 was located under the gear box. This valve's outer flanges were abated and visible leaks were located on bolts of the south flange at the 6-8 o'clock position. Attempts to repair the leaks were not successful and an operational plan was identified for the replacement of the 20" main line valve, (2) 12" inlet valves to gr-102 and associated piping. Pressure reduction in the affected segment of transmission main was achieved and the operational plan continued around-the-clock. On june 9, 2013 installation of approximately 12' of 20'' pipe and 8' of 12" pipe associated with the (3) replacement valves was completed. All welding was tested and passed successully. Leak survey monitored the isolated segment of main as pressure was restored incrementally and no leaks were detected. At 14:53 normal system conditions resumed. There was no migration beyond the open excavation; all subsurface structures remained gas free during this operation. There were no reported outages or negative system impact as a result of this procedure. There were no injuries, evacuations or media attention reported. The US DOT, psc, dep was notified and the fdny was notified under the transmission leak notification protocol. The serious level incident was terminated.
| Occurred At | 2013-05-29 06:02:00 |
|---|---|
| Year | 2013 |
| Report Received Date | 2013-06-25 00:00:00 |
| Iyear | 2013.0 |
| Report Number | 20130078.0 |
| Supplemental Number | 15885.0 |
| Report Type | Supplemental Final |
| Operator Id | 2704 PHMSA Enforcement |
| Name | Consolidated Edison Co Of New York |
| Operator Street Address | 4 Irving Place |
| Operator City Name | New York |
| Operator State Abbreviation | NY |
| Operator Postal Code | 10003 |
| Local Datetime | 2013-05-29 06:02:00 |
| Location Street Address | Intersection Of Castle Hill And Westchester Avenues |
| Location City Name | New York |
| Location County Name | Bronx |
| Location State Abbreviation | NY |
| Location Postal Code | 10462-4807 |
| Location Latitude | 40.8342275 Google Maps OpenStreetMap |
| Location Longitude | -73.851659 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2013-05-30 04:04:00 |
| Nrc Rpt Num | 1048708 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 3.5 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2013-05-29 06:02:00 |
| On Site Datetime | 2013-05-29 06:02:00 |
| Federal | No |
| Location Type | Public Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Pavement |
| Depth Of Cover | 36.0 |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Installation Year | 1971.0 |
| Pipe Diameter | 20.0 |
| Pipe Specification | Unknown |
| Pipe Manufacturer | Unknown |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Wt Steel | 0.375 |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Class Location Type | Class 4 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 600000.0 |
| Est Cost Emergency | 2500.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 10.0 |
| Prpty | 602510.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 200.0 |
| Normal Psig | 200.0 |
| Mop Psig | 245.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Ground Patrol By Operator Or Its Contractor |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Leak on valve connection did not result in pressure drop or increased flow. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Valve |
| Eq Failure Type | Valve |
| Valve Other Ind | Other |
| Valve Other Details | Leak At Bolted Connection On 20" Valve Body |
| Preparer Name | K**** F**** |
| Preparer Title | Operations Manager-Gas Emergency Response Center |
| Preparer Email | F*****@c****.com |
| Preparer Telephone | 718-319-2310 |
| Preparer Fax | 718-597-5463 |
| Authorizer Name | V***** D****** |
| Authorizer Title | Department Manager-Gas Emergency Response Center |
| Authorizer Telephone | 718-319-2350 |
| Authorizer Email | D*******@c****.com |
| Narrative | At 06:02 on may 29, 2013 procedure mpc 13-19 was initiated due to the investigation of leak (xl13001342) in the vicinity of the transmission system at this location. In addition to the 20" transmission main (operating at less than 20% smys), located in this vicinity is the 12" transmission straddle connections supplying tp-hp-mp gr-102, (3) transmission valves and associated fittings as well as 12" low pressure polyethylene (lppe) and 12" low pressure cast iron distribution mains and services. Contingency b13-044; case 20 & 21-a was placed in effect. At 09:16 isolation of the affected segment was achieved and pressure was reduced from 200 psi to 60 psi per this procedure and excavation operations began. The (3) valves at this location (20" main line v-7583 and 12" inlets v-7584/7585) were investigated for a possible source of the suspected leak and a visible leak on the bleed connection to the valve body of 12" inlet v-7585. Additionally, a visible leak on a .5" relief valve bottom of the body of 20" v-7583 was located under the gear box. This valve's outer flanges were abated and visible leaks were located on bolts of the south flange at the 6-8 o'clock position. Attempts to repair the leaks were not successful and an operational plan was identified for the replacement of the 20" main line valve, (2) 12" inlet valves to gr-102 and associated piping. Pressure reduction in the affected segment of transmission main was achieved and the operational plan continued around-the-clock. On june 9, 2013 installation of approximately 12' of 20'' pipe and 8' of 12" pipe associated with the (3) replacement valves was completed. All welding was tested and passed successully. Leak survey monitored the isolated segment of main as pressure was restored incrementally and no leaks were detected. At 14:53 normal system conditions resumed. There was no migration beyond the open excavation; all subsurface structures remained gas free during this operation. There were no reported outages or negative system impact as a result of this procedure. There were no injuries, evacuations or media attention reported. The US DOT, psc, dep was notified and the fdny was notified under the transmission leak notification protocol. The serious level incident was terminated. |