Incident details
Operator, cause, commodity and consequences with raw source fields.
GD incident on 2013-01-07 — NY
Operator
Consolidated Edison Co Of New York
Cause
Equipment Failure
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$400,000
Incident datetime
2013-01-07 14:02
Report number
Location
NY, BRONX
Narrative
On monday january 7, 2013 at 10:56, leak survey reported a type 1 gas reading of 10% in transmission main valve 43940 in front of 1119 longwood ave. Supervision and gas construction were dispatched. At 12:45 hrs gas construction reported that they performed a leak investigation and determined a probable leak was on transmission valve 43940. Gas control was notified and valve 46630 was identified to isolate the section of 36" transmission main. A code murre (multiple resource response event) was initiated and gas distribution services (gds) responded and located valve 46630 as contingency. At 14:02, gas control gave permission to gds to close valve 46630. Approximately 2,400 feet of 36", 303 psi main was affected and no reported system impact resulted from this section of main being isolated. An operational plan was developed and the segment of transmission main was reduced from 303 psi to approximately 60 psi through a pressure control temporary regulator connection to a 6" lppe distribution main at tiffany st. And oak point ave. On january 10, 2013 the valve was excavated and a visual leak was confirmed on the body bleed riser's welded connection at the bottom of the valve body. The valve manufacturer's representative was contacted and responded to the location to review repair options with engineering and gas operations' personnel. On january 14, 2013, the pressure was reduced further to low pressure and the leaking connection was cut, removed and a welded high hat installed. The high hat was tested and all tests passed. On january 16, 2013 a new riser was installed and restoration operations were initiated at 12:39. Leak survey monitored the segment as pressure was restored in 60 psi increments. At 19:56, the segment of isolated main was returned to normal operating pressure of 295 psi. The serious level ics structure was terminated at 20:18. Us DOT, nys psc, nyc dep and fdny were notified. The DOT-PHMSA office inquired about the leak. There were no reports of any injury, evacuation or media attention associated with this incident. Note--this gas distribution incident report was generated to replace gas transmission incident report 20130010-15729
Detailed record list
Occurred At
2013-01-07 14:02:00
Year
2013
Report Received Date
2013-06-03 00:00:00
Iyear
2013.0
Report Number
20130072.0
Supplemental Number
15680.0
Report Type
Original Final
Operator Id
2704
Name
Consolidated Edison Co Of New York
Operator Street Address
4 Irving Place
Operator City Name
New York
Operator State Abbreviation
NY
Operator Postal Code
10003
Local Datetime
2013-01-07 14:02:00
Location Street Address
1119 Longwood Avenue
Location City Name
Bronx
Location County Name
Bronx
Location State Abbreviation
NY
Location Postal Code
10474-5712
Location Latitude
40.814695
Location Longitude
-73.894013
Nrc Rpt Datetime
2013-01-07 14:10:00
Nrc Rpt Num
1035007
Commodity Released Type
Natural Gas
Unintentional Release
2.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2013-01-07 14:02:00
On Site Datetime
2013-01-07 14:02:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
54.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Other
System Part Details
Valve Riser Connection
Installation Year
2010.0
Material Involved
Steel
Steel Seam Type
Other
Steel Seam Type Details
Unknown
Release Type
Leak
Leak Type
Connection Failure
Class Location Type
Class 4 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
400000.0
Est Cost Emergency
1250.0
Est Cost Other
5000.0
Est Cost Other Details
Materials
Est Cost Unintentional Release
10.0
Prpty
406260.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
303.0
Normal Psig
303.0
Mop Psig
350.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Leak on 1" fitting at bottom of 36" main line valve
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Valve
Eq Failure Type
Valve
Valve Other Ind
Other
Valve Other Details
Body Bleed Riser Connection
Preparer Name
K**** F****
Preparer Title
Operations Manager-Gas Emergency Response Center
Preparer Email
F*****@c****.com
Preparer Telephone
718-319-2310
Preparer Fax
718-904-4607
Authorizer Name
V***** D******
Authorizer Title
Department Manager-Gas Emergency Response Center
Authorizer Telephone
718-319-2350
Authorizer Email
D*******@c****.com
Narrative
On monday january 7, 2013 at 10:56, leak survey reported a type 1 gas reading of 10% in transmission main valve 43940 in front of 1119 longwood ave. Supervision and gas construction were dispatched. At 12:45 hrs gas construction reported that they performed a leak investigation and determined a probable leak was on transmission valve 43940. Gas control was notified and valve 46630 was identified to isolate the section of 36" transmission main. A code murre (multiple resource response event) was initiated and gas distribution services (gds) responded and located valve 46630 as contingency. At 14:02, gas control gave permission to gds to close valve 46630. Approximately 2,400 feet of 36", 303 psi main was affected and no reported system impact resulted from this section of main being isolated. An operational plan was developed and the segment of transmission main was reduced from 303 psi to approximately 60 psi through a pressure control temporary regulator connection to a 6" lppe distribution main at tiffany st. And oak point ave. On january 10, 2013 the valve was excavated and a visual leak was confirmed on the body bleed riser's welded connection at the bottom of the valve body. The valve manufacturer's representative was contacted and responded to the location to review repair options with engineering and gas operations' personnel. On january 14, 2013, the pressure was reduced further to low pressure and the leaking connection was cut, removed and a welded high hat installed. The high hat was tested and all tests passed. On january 16, 2013 a new riser was installed and restoration operations were initiated at 12:39. Leak survey monitored the segment as pressure was restored in 60 psi increments. At 19:56, the segment of isolated main was returned to normal operating pressure of 295 psi. The serious level ics structure was terminated at 20:18. Us DOT, nys psc, nyc dep and fdny were notified. The DOT-PHMSA office inquired about the leak. There were no reports of any injury, evacuation or media attention associated with this incident. Note--this gas distribution incident report was generated to replace gas transmission incident report 20130010-15729
| Occurred At | 2013-01-07 14:02:00 |
|---|---|
| Year | 2013 |
| Report Received Date | 2013-06-03 00:00:00 |
| Iyear | 2013.0 |
| Report Number | 20130072.0 |
| Supplemental Number | 15680.0 |
| Report Type | Original Final |
| Operator Id | 2704 PHMSA Enforcement |
| Name | Consolidated Edison Co Of New York |
| Operator Street Address | 4 Irving Place |
| Operator City Name | New York |
| Operator State Abbreviation | NY |
| Operator Postal Code | 10003 |
| Local Datetime | 2013-01-07 14:02:00 |
| Location Street Address | 1119 Longwood Avenue |
| Location City Name | Bronx |
| Location County Name | Bronx |
| Location State Abbreviation | NY |
| Location Postal Code | 10474-5712 |
| Location Latitude | 40.814695 Google Maps OpenStreetMap |
| Location Longitude | -73.894013 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2013-01-07 14:10:00 |
| Nrc Rpt Num | 1035007 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 2.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2013-01-07 14:02:00 |
| On Site Datetime | 2013-01-07 14:02:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Pavement |
| Depth Of Cover | 54.0 |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Other |
| System Part Details | Valve Riser Connection |
| Installation Year | 2010.0 |
| Material Involved | Steel |
| Steel Seam Type | Other |
| Steel Seam Type Details | Unknown |
| Release Type | Leak |
| Leak Type | Connection Failure |
| Class Location Type | Class 4 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 400000.0 |
| Est Cost Emergency | 1250.0 |
| Est Cost Other | 5000.0 |
| Est Cost Other Details | Materials |
| Est Cost Unintentional Release | 10.0 |
| Prpty | 406260.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 0.0 |
| Accident Psig | 303.0 |
| Normal Psig | 303.0 |
| Mop Psig | 350.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Leak on 1" fitting at bottom of 36" main line valve |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Valve |
| Eq Failure Type | Valve |
| Valve Other Ind | Other |
| Valve Other Details | Body Bleed Riser Connection |
| Preparer Name | K**** F**** |
| Preparer Title | Operations Manager-Gas Emergency Response Center |
| Preparer Email | F*****@c****.com |
| Preparer Telephone | 718-319-2310 |
| Preparer Fax | 718-904-4607 |
| Authorizer Name | V***** D****** |
| Authorizer Title | Department Manager-Gas Emergency Response Center |
| Authorizer Telephone | 718-319-2350 |
| Authorizer Email | D*******@c****.com |
| Narrative | On monday january 7, 2013 at 10:56, leak survey reported a type 1 gas reading of 10% in transmission main valve 43940 in front of 1119 longwood ave. Supervision and gas construction were dispatched. At 12:45 hrs gas construction reported that they performed a leak investigation and determined a probable leak was on transmission valve 43940. Gas control was notified and valve 46630 was identified to isolate the section of 36" transmission main. A code murre (multiple resource response event) was initiated and gas distribution services (gds) responded and located valve 46630 as contingency. At 14:02, gas control gave permission to gds to close valve 46630. Approximately 2,400 feet of 36", 303 psi main was affected and no reported system impact resulted from this section of main being isolated. An operational plan was developed and the segment of transmission main was reduced from 303 psi to approximately 60 psi through a pressure control temporary regulator connection to a 6" lppe distribution main at tiffany st. And oak point ave. On january 10, 2013 the valve was excavated and a visual leak was confirmed on the body bleed riser's welded connection at the bottom of the valve body. The valve manufacturer's representative was contacted and responded to the location to review repair options with engineering and gas operations' personnel. On january 14, 2013, the pressure was reduced further to low pressure and the leaking connection was cut, removed and a welded high hat installed. The high hat was tested and all tests passed. On january 16, 2013 a new riser was installed and restoration operations were initiated at 12:39. Leak survey monitored the segment as pressure was restored in 60 psi increments. At 19:56, the segment of isolated main was returned to normal operating pressure of 295 psi. The serious level ics structure was terminated at 20:18. Us DOT, nys psc, nyc dep and fdny were notified. The DOT-PHMSA office inquired about the leak. There were no reports of any injury, evacuation or media attention associated with this incident. Note--this gas distribution incident report was generated to replace gas transmission incident report 20130010-15729 |