GD incident on 2013-04-18 — CA
Operator
Pacific Gas & Electric Co
Cause
Miscellaneous Root Causes
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$47,500
Incident datetime
2013-04-18 10:00
Report number
Location
CA, SANTA CLARA
Narrative
On april 18, 2013 a pacific gas and electric (pg&e) crew was working on an aldyl a main replacement. At approximately 1000 hours, the crew was excavating under a nearby 4-inch steel main, when the soil pushed on the pipe assembly causing a transition fitting between the adjacent 2-inch steel main and a 2-inch plastic main to become un-coupled resulting in a release of gas. The USA ticket (#063983) for the area where the main was struck is valid, and the gas facilities were properly located and marked. The backhoe operator and the utility worker involved in the incident were administered post-accident tests for drugs and alcohol. The alcohol and drug tests for both employees were returned with negative results. The pg&e investigation on the cause of the incident is ongoing. There were no injuries, no fatalities, no ignition and no media on site as a result of this incident. Out of an abundance of caution, the police department rerouted traffic on mckee road, blocked off the area, and evacuated 12 residents. The volume of gas released is less than three million cubic feet, however the cost of damages due to the release of gas is estimated to be greater than $50,000. Thus, this incident was reported to the department of transportation at 1538 hours and to the cpuc at 1550 hours when the cost of damages was estimated to exceed $50,000.
Detailed record list
Occurred At
2013-04-18 10:00:00
Year
2013
Report Received Date
2013-05-22 00:00:00
Iyear
2013.0
Report Number
20130058.0
Supplemental Number
15665.0
Report Type
Original Final
Operator Id
15007
Name
Pacific Gas & Electric Co
Operator Street Address
6121 Bollinger Canyon Rd.
Operator City Name
San Ramon
Operator State Abbreviation
CA
Operator Postal Code
94583
Local Datetime
2013-04-18 10:00:00
Location Street Address
Mckee Road And N Claremont
Location City Name
San Jose
Location County Name
Santa Clara
Location State Abbreviation
CA
Location Postal Code
95127
Location Latitude
37.37821
Location Longitude
-121.83101
Nrc Rpt Datetime
2013-04-18 15:38:00
Nrc Rpt Num
1044397
Commodity Released Type
Natural Gas
Unintentional Release
820.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Incident Identified Datetime
2013-04-18 10:00:00
On Site Datetime
2013-04-18 10:00:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
75.0
Crossing
Yes
Road Crossing Ind
Yes
Road Type
Uncased
Pipe Facility Type
Privately Owned
System Part Involved
Main
Pipe Diameter
2.0
Pipe Specification
Unknown
Pipe Manufacturer
Dupont
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Plastic Sdr
11
Release Type
Leak
Leak Type
Crack
Class Location Type
Class 3 Location
Est Cost Oper Paid
5000.0
Est Cost Prop Damage
47500.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Est Cost Unintentional Release
2500.0
Prpty
55000.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
47.0
Accident Psig
57.0
Normal Psig
57.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
No scada on this part of the system
Employee Drug Test Ind
Yes
Num Employees Tested
2
Num Employees Failed
0
Contractor Drug Test Ind
Yes
Num Contractors Tested
2
Num Contractors Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Operator (First Party)
Ex Party Type
Excavation Damage By Operator (First Party)
Notify Cga Dirt
No
Public Row Ind
Yes
Public Subtype
City Street
Excavator Type
Utility
Excavator Equipment
Backhoe/trackhoe
Work Performed
Natural Gas
One Call Notified Ind
Yes
One Call Ticket Num
63983
One Call Center Name
Usa North
Locator Type
Utility Owner
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
8.0
Root Cause Category
Miscellaneous Root Causes
Root Cause Type
Root Cause Not Listed (Comment Required)
Root Cause Type Other
Data Not Collected
Preparer Name
C***** D****
Preparer Title
Gas Compliance Engineer
Preparer Email
C***@p**.com
Preparer Telephone
925-974-4378
Preparer Fax
925-974-4232
Authorizer Name
F****** Y**
Authorizer Title
Regulatory Compliance And Support Director
Authorizer Telephone
925-974-4316
Authorizer Email
F***@p**.com
Narrative
On april 18, 2013 a pacific gas and electric (pg&e) crew was working on an aldyl a main replacement. At approximately 1000 hours, the crew was excavating under a nearby 4-inch steel main, when the soil pushed on the pipe assembly causing a transition fitting between the adjacent 2-inch steel main and a 2-inch plastic main to become un-coupled resulting in a release of gas. The USA ticket (#063983) for the area where the main was struck is valid, and the gas facilities were properly located and marked. The backhoe operator and the utility worker involved in the incident were administered post-accident tests for drugs and alcohol. The alcohol and drug tests for both employees were returned with negative results. The pg&e investigation on the cause of the incident is ongoing. There were no injuries, no fatalities, no ignition and no media on site as a result of this incident. Out of an abundance of caution, the police department rerouted traffic on mckee road, blocked off the area, and evacuated 12 residents. The volume of gas released is less than three million cubic feet, however the cost of damages due to the release of gas is estimated to be greater than $50,000. Thus, this incident was reported to the department of transportation at 1538 hours and to the cpuc at 1550 hours when the cost of damages was estimated to exceed $50,000.
| Occurred At | 2013-04-18 10:00:00 |
|---|---|
| Year | 2013 |
| Report Received Date | 2013-05-22 00:00:00 |
| Iyear | 2013.0 |
| Report Number | 20130058.0 |
| Supplemental Number | 15665.0 |
| Report Type | Original Final |
| Operator Id | 15007 PHMSA Enforcement |
| Name | Pacific Gas & Electric Co |
| Operator Street Address | 6121 Bollinger Canyon Rd. |
| Operator City Name | San Ramon |
| Operator State Abbreviation | CA |
| Operator Postal Code | 94583 |
| Local Datetime | 2013-04-18 10:00:00 |
| Location Street Address | Mckee Road And N Claremont |
| Location City Name | San Jose |
| Location County Name | Santa Clara |
| Location State Abbreviation | CA |
| Location Postal Code | 95127 |
| Location Latitude | 37.37821 Google Maps OpenStreetMap |
| Location Longitude | -121.83101 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2013-04-18 15:38:00 |
| Nrc Rpt Num | 1044397 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 820.0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Incident Identified Datetime | 2013-04-18 10:00:00 |
| On Site Datetime | 2013-04-18 10:00:00 |
| Federal | No |
| Location Type | Public Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Pavement |
| Depth Of Cover | 75.0 |
| Crossing | Yes |
| Road Crossing Ind | Yes |
| Road Type | Uncased |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Main |
| Pipe Diameter | 2.0 |
| Pipe Specification | Unknown |
| Pipe Manufacturer | Dupont |
| Material Involved | Plastic |
| Plastic Type | Polyethylene (Pe) |
| Plastic Sdr | 11 |
| Release Type | Leak |
| Leak Type | Crack |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 5000.0 |
| Est Cost Prop Damage | 47500.0 |
| Est Cost Emergency | 0.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 2500.0 |
| Prpty | 55000.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 47.0 |
| Accident Psig | 57.0 |
| Normal Psig | 57.0 |
| Mop Psig | 60.0 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | No scada on this part of the system |
| Employee Drug Test Ind | Yes |
| Num Employees Tested | 2 |
| Num Employees Failed | 0 |
| Contractor Drug Test Ind | Yes |
| Num Contractors Tested | 2 |
| Num Contractors Failed | 0 |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Operator (First Party) |
| Ex Party Type | Excavation Damage By Operator (First Party) |
| Notify Cga Dirt | No |
| Public Row Ind | Yes |
| Public Subtype | City Street |
| Excavator Type | Utility |
| Excavator Equipment | Backhoe/trackhoe |
| Work Performed | Natural Gas |
| One Call Notified Ind | Yes |
| One Call Ticket Num | 63983 |
| One Call Center Name | Usa North |
| Locator Type | Utility Owner |
| Visible Marks | Yes |
| Service Interruption | Yes |
| Service Interruption Hours | 8.0 |
| Root Cause Category | Miscellaneous Root Causes |
| Root Cause Type | Root Cause Not Listed (Comment Required) |
| Root Cause Type Other | Data Not Collected |
| Preparer Name | C***** D**** |
| Preparer Title | Gas Compliance Engineer |
| Preparer Email | C***@p**.com |
| Preparer Telephone | 925-974-4378 |
| Preparer Fax | 925-974-4232 |
| Authorizer Name | F****** Y** |
| Authorizer Title | Regulatory Compliance And Support Director |
| Authorizer Telephone | 925-974-4316 |
| Authorizer Email | F***@p**.com |
| Narrative | On april 18, 2013 a pacific gas and electric (pg&e) crew was working on an aldyl a main replacement. At approximately 1000 hours, the crew was excavating under a nearby 4-inch steel main, when the soil pushed on the pipe assembly causing a transition fitting between the adjacent 2-inch steel main and a 2-inch plastic main to become un-coupled resulting in a release of gas. The USA ticket (#063983) for the area where the main was struck is valid, and the gas facilities were properly located and marked. The backhoe operator and the utility worker involved in the incident were administered post-accident tests for drugs and alcohol. The alcohol and drug tests for both employees were returned with negative results. The pg&e investigation on the cause of the incident is ongoing. There were no injuries, no fatalities, no ignition and no media on site as a result of this incident. Out of an abundance of caution, the police department rerouted traffic on mckee road, blocked off the area, and evacuated 12 residents. The volume of gas released is less than three million cubic feet, however the cost of damages due to the release of gas is estimated to be greater than $50,000. Thus, this incident was reported to the department of transportation at 1538 hours and to the cpuc at 1550 hours when the cost of damages was estimated to exceed $50,000. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA