GD incident on 2013-01-28 — OH
Operator
Columbia Gas Of Ohio Inc
Cause
Other Incident Cause
Commodity
—
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,000
Incident datetime
2013-01-28 10:23
Report number
Location
OH, SENECA
Narrative
Columbia gas of ohio investigators and other interested parties met on january 28, 2013 to perform an investigation regarding the incident. As a result of this investigation, the parties concluded that the cause of this explosion cannot be ascertained. The building's compromised structural condition limited any internal building investigation. The building was demolished the same day as a result of its unsafe condition. During the columbia gas of ohio service line test for 21 harrison st., a minute, non-causal leak was discovered 34 feet from the building foundation that could not have been the source of the explosion. A section of service pipe, including a coupling and curb valve, was removed, in the area of this leak, and a subsequent lab test was performed on february 6, 2012. The results of the test confirmed a minute, non-causal leak. Our post-incident leakage investigation did not reveal any migration of natural gas towards the vicinity of the building's foundation. Columbia considers this to be the final determination and this report should be considered final.
Detailed record list
Occurred At
2013-01-28 10:23:00
Year
2013
Report Received Date
2013-02-26 00:00:00
Iyear
2013.0
Report Number
20130023.0
Supplemental Number
15614.0
Report Type
Original Final
Operator Id
2596
Name
Columbia Gas Of Ohio Inc
Operator Street Address
200 Civic Center Dr
Operator City Name
Columbus
Operator State Abbreviation
OH
Operator Postal Code
43215
Local Datetime
2013-01-28 10:23:00
Location Street Address
21 Harrison St.
Location City Name
Tiffin
Location County Name
Seneca
Location State Abbreviation
OH
Location Postal Code
44831-1552
Location Latitude
41.12043
Location Longitude
-83.17673
Nrc Rpt Datetime
2013-01-28 12:15:00
Nrc Rpt Num
1036809
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
Yes
Explode Ind
Yes
Num Pub Evacuated
0.0
Incident Identified Datetime
2013-01-28 10:23:00
On Site Datetime
2013-01-28 10:32:00
Federal
No
Location Type
Private Property
Incident Area Type
Aboveground
Incident Area Subtype
Inside A Building
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Other
System Part Details
Unknown
Material Involved
Unknown
Release Type
Other
Release Type Details
Unknown
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
1000.0
Est Cost Emergency
1500.0
Est Cost Other
1000.0
Est Cost Other Details
Paving Restoration
Est Cost Unintentional Release
0.0
Prpty
3500.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
1.0
Accident Psig
0.44
Normal Psig
0.44
Mop Psig
0.54
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Emergency Responder
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Other Incident Cause
Cause Details
Unknown
Other Type
Unknown
Unknown Subtype
Investigation Complete, Cause Of Incident Unknown
Preparer Name
R** R******
Preparer Title
Operations Compliance Manager
Preparer Email
R******@n*******.com
Preparer Telephone
614-818-2110
Preparer Fax
614-818-2151
Authorizer Name
R** R******
Authorizer Title
Operations Compliance Manager
Authorizer Telephone
614-818-2110
Authorizer Email
R******@n*******.com
Narrative
Columbia gas of ohio investigators and other interested parties met on january 28, 2013 to perform an investigation regarding the incident. As a result of this investigation, the parties concluded that the cause of this explosion cannot be ascertained. The building's compromised structural condition limited any internal building investigation. The building was demolished the same day as a result of its unsafe condition. During the columbia gas of ohio service line test for 21 harrison st., a minute, non-causal leak was discovered 34 feet from the building foundation that could not have been the source of the explosion. A section of service pipe, including a coupling and curb valve, was removed, in the area of this leak, and a subsequent lab test was performed on february 6, 2012. The results of the test confirmed a minute, non-causal leak. Our post-incident leakage investigation did not reveal any migration of natural gas towards the vicinity of the building's foundation. Columbia considers this to be the final determination and this report should be considered final.
| Occurred At | 2013-01-28 10:23:00 |
|---|---|
| Year | 2013 |
| Report Received Date | 2013-02-26 00:00:00 |
| Iyear | 2013.0 |
| Report Number | 20130023.0 |
| Supplemental Number | 15614.0 |
| Report Type | Original Final |
| Operator Id | 2596 PHMSA Enforcement |
| Name | Columbia Gas Of Ohio Inc |
| Operator Street Address | 200 Civic Center Dr |
| Operator City Name | Columbus |
| Operator State Abbreviation | OH |
| Operator Postal Code | 43215 |
| Local Datetime | 2013-01-28 10:23:00 |
| Location Street Address | 21 Harrison St. |
| Location City Name | Tiffin |
| Location County Name | Seneca |
| Location State Abbreviation | OH |
| Location Postal Code | 44831-1552 |
| Location Latitude | 41.12043 Google Maps OpenStreetMap |
| Location Longitude | -83.17673 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2013-01-28 12:15:00 |
| Nrc Rpt Num | 1036809 NRC Report How to search |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | Yes |
| Explode Ind | Yes |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2013-01-28 10:23:00 |
| On Site Datetime | 2013-01-28 10:32:00 |
| Federal | No |
| Location Type | Private Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Inside A Building |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | Other |
| System Part Details | Unknown |
| Material Involved | Unknown |
| Release Type | Other |
| Release Type Details | Unknown |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 1000.0 |
| Est Cost Emergency | 1500.0 |
| Est Cost Other | 1000.0 |
| Est Cost Other Details | Paving Restoration |
| Est Cost Unintentional Release | 0.0 |
| Prpty | 3500.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 0.0 |
| Residences Affected | 1.0 |
| Accident Psig | 0.44 |
| Normal Psig | 0.44 |
| Mop Psig | 0.54 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Emergency Responder |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Other Incident Cause |
| Cause Details | Unknown |
| Other Type | Unknown |
| Unknown Subtype | Investigation Complete, Cause Of Incident Unknown |
| Preparer Name | R** R****** |
| Preparer Title | Operations Compliance Manager |
| Preparer Email | R******@n*******.com |
| Preparer Telephone | 614-818-2110 |
| Preparer Fax | 614-818-2151 |
| Authorizer Name | R** R****** |
| Authorizer Title | Operations Compliance Manager |
| Authorizer Telephone | 614-818-2110 |
| Authorizer Email | R******@n*******.com |
| Narrative | Columbia gas of ohio investigators and other interested parties met on january 28, 2013 to perform an investigation regarding the incident. As a result of this investigation, the parties concluded that the cause of this explosion cannot be ascertained. The building's compromised structural condition limited any internal building investigation. The building was demolished the same day as a result of its unsafe condition. During the columbia gas of ohio service line test for 21 harrison st., a minute, non-causal leak was discovered 34 feet from the building foundation that could not have been the source of the explosion. A section of service pipe, including a coupling and curb valve, was removed, in the area of this leak, and a subsequent lab test was performed on february 6, 2012. The results of the test confirmed a minute, non-causal leak. Our post-incident leakage investigation did not reveal any migration of natural gas towards the vicinity of the building's foundation. Columbia considers this to be the final determination and this report should be considered final. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA