GD incident on 2013-01-15 — IL
Operator
Liberty Energy (Mid-States) Corp D/b/a Liberty Utilities - Central
Cause
Equipment Failure
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$85,000
Incident datetime
2013-01-15 06:45
Report number
Location
IL, MASSAC
Narrative
A fisher 630 regulator failed and the fisher 1805p-167ar relief valve failed to relieve. This resulted in 270 psig being placed on the existing plastic pe distribution system (system). The system was shut down. A 15psi air test was placed on the system then the system was re-pressurized with natural gas to 15 psig, leak surveyed and then temporarily placed back into service until the entire system was replaced. During the replacement the existing system was leak surveyed each day until all customers were back in service. The house piping was air tested to ensure all their piping was safe along with visual inspecting all accessible piping. Total pipe replacement - 8,102 ft of 2" poly and 28 poly services (5,193').
Detailed record list
Occurred At
2013-01-15 06:45:00
Year
2013
Report Received Date
2013-02-11 00:00:00
Iyear
2013.0
Report Number
20130014.0
Supplemental Number
15602.0
Report Type
Original Final
Operator Id
38906
Name
Liberty Energy (Mid-States) Corp D/b/a Liberty Utilities - Central
Operator Street Address
2751 North High Street
Operator City Name
Jackson
Operator State Abbreviation
MO
Operator Postal Code
63755
Local Datetime
2013-01-15 06:20:00
Location Street Address
Mt. Mission Rd.
Location City Name
Metropolis
Location County Name
Massac
Location State Abbreviation
IL
Location Postal Code
62960
Location Latitude
37.191143
Location Longitude
-88.759725
Nrc Rpt Datetime
2013-01-15 10:30:00
Nrc Rpt Num
1035738
Commodity Released Type
Natural Gas
Unintentional Release
1.3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2013-01-15 06:45:00
On Site Datetime
2013-01-15 07:10:00
Federal
No
Location Type
Utility Right-Of-Way / Easement
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance (E.g. Value Or Regulator Station, Outdoor Meter Set)
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
District Regulator/metering Station
Installation Year
1980.0
Material Involved
Cast/wrought Iron
Release Type
Other
Release Type Details
Fisher 630 Regulator Failed At The Same Time 1805p-167ar Pilot Failed To Relieve.
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
85000.0
Est Cost Emergency
1000.0
Est Cost Other
0.0
Est Cost Unintentional Release
3.0
Prpty
86003.0
Commercial Affected
0.0
Industrial Affected
1.0
Residences Affected
27.0
Accident Psig
270.0
Normal Psig
70.0
Mop Psig
80.0
Accident Pressure
Pressure Exceeded The Applicable Allowance In 192.201
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Pressure Regulator Ind
Yes
Preparer Name
R***** S*****
Preparer Title
Compliance Manager
Preparer Email
R************@l***************.com
Preparer Telephone
573-225-7834
Preparer Fax
573-471-1363
Authorizer Name
M****** D* B*****
Authorizer Title
Sr. Manager - Engineering And Compliance
Authorizer Telephone
573-979-0220
Authorizer Email
M**********@l***************.com
Narrative
A fisher 630 regulator failed and the fisher 1805p-167ar relief valve failed to relieve. This resulted in 270 psig being placed on the existing plastic pe distribution system (system). The system was shut down. A 15psi air test was placed on the system then the system was re-pressurized with natural gas to 15 psig, leak surveyed and then temporarily placed back into service until the entire system was replaced. During the replacement the existing system was leak surveyed each day until all customers were back in service. The house piping was air tested to ensure all their piping was safe along with visual inspecting all accessible piping. Total pipe replacement - 8,102 ft of 2" poly and 28 poly services (5,193').
| Occurred At | 2013-01-15 06:45:00 |
|---|---|
| Year | 2013 |
| Report Received Date | 2013-02-11 00:00:00 |
| Iyear | 2013.0 |
| Report Number | 20130014.0 |
| Supplemental Number | 15602.0 |
| Report Type | Original Final |
| Operator Id | 38906 PHMSA Enforcement |
| Name | Liberty Energy (Mid-States) Corp D/b/a Liberty Utilities - Central |
| Operator Street Address | 2751 North High Street |
| Operator City Name | Jackson |
| Operator State Abbreviation | MO |
| Operator Postal Code | 63755 |
| Local Datetime | 2013-01-15 06:20:00 |
| Location Street Address | Mt. Mission Rd. |
| Location City Name | Metropolis |
| Location County Name | Massac |
| Location State Abbreviation | IL |
| Location Postal Code | 62960 |
| Location Latitude | 37.191143 Google Maps OpenStreetMap |
| Location Longitude | -88.759725 Google Maps OpenStreetMap |
| Nrc Rpt Datetime | 2013-01-15 10:30:00 |
| Nrc Rpt Num | 1035738 NRC Report How to search |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 1.3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0.0 |
| Incident Identified Datetime | 2013-01-15 06:45:00 |
| On Site Datetime | 2013-01-15 07:10:00 |
| Federal | No |
| Location Type | Utility Right-Of-Way / Easement |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance (E.g. Value Or Regulator Station, Outdoor Meter Set) |
| Crossing | No |
| Pipe Facility Type | Privately Owned |
| System Part Involved | District Regulator/metering Station |
| Installation Year | 1980.0 |
| Material Involved | Cast/wrought Iron |
| Release Type | Other |
| Release Type Details | Fisher 630 Regulator Failed At The Same Time 1805p-167ar Pilot Failed To Relieve. |
| Class Location Type | Class 3 Location |
| Est Cost Oper Paid | 0.0 |
| Est Cost Prop Damage | 85000.0 |
| Est Cost Emergency | 1000.0 |
| Est Cost Other | 0.0 |
| Est Cost Unintentional Release | 3.0 |
| Prpty | 86003.0 |
| Commercial Affected | 0.0 |
| Industrial Affected | 1.0 |
| Residences Affected | 27.0 |
| Accident Psig | 270.0 |
| Normal Psig | 70.0 |
| Mop Psig | 80.0 |
| Accident Pressure | Pressure Exceeded The Applicable Allowance In 192.201 |
| Scada In Place Ind | No |
| Accident Identifier | Notification From Public |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the incident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Relief Valve Ind | Yes |
| Pressure Regulator Ind | Yes |
| Preparer Name | R***** S***** |
| Preparer Title | Compliance Manager |
| Preparer Email | R************@l***************.com |
| Preparer Telephone | 573-225-7834 |
| Preparer Fax | 573-471-1363 |
| Authorizer Name | M****** D* B***** |
| Authorizer Title | Sr. Manager - Engineering And Compliance |
| Authorizer Telephone | 573-979-0220 |
| Authorizer Email | M**********@l***************.com |
| Narrative | A fisher 630 regulator failed and the fisher 1805p-167ar relief valve failed to relieve. This resulted in 270 psig being placed on the existing plastic pe distribution system (system). The system was shut down. A 15psi air test was placed on the system then the system was re-pressurized with natural gas to 15 psig, leak surveyed and then temporarily placed back into service until the entire system was replaced. During the replacement the existing system was leak surveyed each day until all customers were back in service. The house piping was air tested to ensure all their piping was safe along with visual inspecting all accessible piping. Total pipe replacement - 8,102 ft of 2" poly and 28 poly services (5,193'). |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA