HL incident on 2012-10-29 — TX

Operator
Holly Energy Partners - Operating, L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$100
Incident datetime
2012-10-29 10:44
Report number
Location
TX
Narrative
The leak took place on the beeson to lovington pipeline manifold, which is an intrastate nm transmission pipeline. The pipeline manifold is located in the confines of the hollyfrontier lea refinery. The cause of the leak was due to internal corrosion in the 3/4" bleeder valve nipple, which then leaked 45 gallons of crude oil onto soil. The flow of product was stopped and the leak was contained on-site. The contaminated soil was excavated and placed into environmental disposal bins. Please see below a summary of the response timeline. 10:44 am urbano received call from lea refinery control center. 11:15 am contractors arrive on-site. 10:55 am line isolated and leak contained. 1:45 pm repairs complete. 2:15 pm line operational. 4:55 pm nrc online report completed, rpt. # 1028672.
Detailed record list
Report Received Date
2012-11-02 00:00:00
Iyear
2012
Report Number
20120376
Supplemental Number
16996
Report Type
Supplemental Final
Operator Id
Name
Holly Energy Partners - Operating, L.p.
Operator Street Address
2323 Victory Ave. Suite 1400
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75219
Local Datetime
2012-10-29 10:44:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1.07
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2012-10-29 10:44:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-10-29 10:55:00
Restart Datetime
2012-10-29 14:15:00
On Site Datetime
2012-10-29 11:15:00
Nrc Rpt Datetime
2012-10-29 18:55:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Beeson To Lovington Pipeline Receiving Manifold
Onshore State Abbreviation
Nm
Onshore Postal Code
88260
Onshore City Name
Lovington
Onshore County Name
Lea
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Release Type
Leak
Leak Type
Pinhole
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
90
Est Cost Prop Damage
100
Est Cost Emergency
0
Est Cost Environmental
5000
Est Cost Other
0
Prpty
5190
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Preparer Name
S****** E*******
Preparer Title
Sr. Regulatory Coordinator
Preparer Email
S***************@h**********.com
Preparer Telephone
575-748-8943
Preparer Fax
214-540-1325
Prepared Date
2012-11-02 00:00:00
Authorizer Name
S****** E*******
Authorizer Telephone
575-748-8943
Authorizer Title
Sr. Regulatory Coordinator
Authorizer Email
S***************@h**********.com
Narrative
The leak took place on the beeson to lovington pipeline manifold, which is an intrastate nm transmission pipeline. The pipeline manifold is located in the confines of the hollyfrontier lea refinery. The cause of the leak was due to internal corrosion in the 3/4" bleeder valve nipple, which then leaked 45 gallons of crude oil onto soil. The flow of product was stopped and the leak was contained on-site. The contaminated soil was excavated and placed into environmental disposal bins. Please see below a summary of the response timeline. 10:44 am urbano received call from lea refinery control center. 11:15 am contractors arrive on-site. 10:55 am line isolated and leak contained. 1:45 pm repairs complete. 2:15 pm line operational. 4:55 pm nrc online report completed, rpt. # 1028672.
Report Received Date 2012-11-02 00:00:00
Iyear 2012
Report Number 20120376
Supplemental Number 16996
Report Type Supplemental Final
Operator Id 32011 PHMSA Enforcement
Name Holly Energy Partners - Operating, L.p.
Operator Street Address 2323 Victory Ave. Suite 1400
Operator City Name Dallas
Operator State Abbreviation TX
Operator Postal Code 75219
Local Datetime 2012-10-29 10:44:00
Location Latitude 32.88041 Google Maps OpenStreetMap
Location Longitude -103.30495 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 1.07
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2012-10-29 10:44:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2012-10-29 10:55:00
Restart Datetime 2012-10-29 14:15:00
On Site Datetime 2012-10-29 11:15:00
Nrc Rpt Datetime 2012-10-29 18:55:00
Nrc Rpt Num 1028672 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Beeson To Lovington Pipeline Receiving Manifold
Onshore State Abbreviation Nm
Onshore Postal Code 88260
Onshore City Name Lovington
Onshore County Name Lea
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Intrastate
Item Involved Valve
Valve Type Auxiliary Or Other Valve
Release Type Leak
Leak Type Pinhole
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 90
Est Cost Prop Damage 100
Est Cost Emergency 0
Est Cost Environmental 5000
Est Cost Other 0
Prpty 5190
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Preparer Name S****** E*******
Preparer Title Sr. Regulatory Coordinator
Preparer Email S***************@h**********.com
Preparer Telephone 575-748-8943
Preparer Fax 214-540-1325
Prepared Date 2012-11-02 00:00:00
Authorizer Name S****** E*******
Authorizer Telephone 575-748-8943
Authorizer Title Sr. Regulatory Coordinator
Authorizer Email S***************@h**********.com
Narrative The leak took place on the beeson to lovington pipeline manifold, which is an intrastate nm transmission pipeline. The pipeline manifold is located in the confines of the hollyfrontier lea refinery. The cause of the leak was due to internal corrosion in the 3/4" bleeder valve nipple, which then leaked 45 gallons of crude oil onto soil. The flow of product was stopped and the leak was contained on-site. The contaminated soil was excavated and placed into environmental disposal bins. Please see below a summary of the response timeline. 10:44 am urbano received call from lea refinery control center. 11:15 am contractors arrive on-site. 10:55 am line isolated and leak contained. 1:45 pm repairs complete. 2:15 pm line operational. 4:55 pm nrc online report completed, rpt. # 1028672.