HL incident on 2012-09-11 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$20,000
Incident datetime
2012-09-11 15:30
Report number
Location
TX
Narrative
Pipeline control received a call from operations at jones creek saying a ditch is full of oil near tank 4009. The controller stopped all pumps and shut down the delivery to bp (approximately 12,500 bph). The field is checking the area around the tank to see if it is coming from enterprise. Conoco has a line right in this area as well. All tank valves have been closed, and we are waiting on more information from jones creek personnel. It has been confirmed at 21:55 hrs that enterprise is the responsible party for the crude oil release. Field operations said the source is a 12-inch surge pressure relief system. Seaway 30-inch line into jones creek was shut down at 2057 hrs. The jones creek to texas city movement was down at 2051 hrs. Osro on site cleaning leak area. Earth dike built around the spill area. Hydro excavator is excavating the site to excavate and make repairs. 12/19/2013 the leak occurred on the 12" relief line at jones creek. The line is normally static (no flow) but does have tank head pressure on it. The line was hydro excavated and a pen hole was found at the 6 o'clock position. The hole was plugged, a plidco sleeve installed, and a pumpkin enclosure was welded onto the pipe enclosing the sleeve. 06/4/2013 operations is working with it's corrosion inhibitor company to evaluate the injection of an inhibitor into the pipeline to stop any corrosion while there is no flow in the pipe. Previously, there was no inhibitor in this line.
Detailed record list
Report Received Date
2012-10-10 00:00:00
Iyear
2012
Report Number
20120290
Supplemental Number
19454
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2012-09-11 15:30:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
100
Recovered Bbls
100
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2012-09-11 15:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-09-11 15:35:00
Restart Datetime
2012-09-14 08:00:00
On Site Datetime
2012-09-11 17:30:00
Nrc Rpt Datetime
2012-09-11 23:03:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Automatic
Downstream Valve Type Ind
Automatic
Pipe Fac Name
Jones Creek Tank Farm
Segment Name
S1
Onshore State Abbreviation
Tx
Onshore Postal Code
77541
Onshore City Name
Jones Creek
Onshore County Name
Brazoria
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Relief Line And Relief Equipment
Installation Year
1976
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Other
Leak Type Other
Larger Than A Pinhole.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
12000
Est Cost Prop Damage
20000
Est Cost Emergency
20000
Est Cost Environmental
60000
Est Cost Other
0
Prpty
112000
Accident Psig
25
Mop Psig
300
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
1000
Internal Inspection Ind
No
Tight Mitered Ind
Yes
Operation Complications Ind
Yes
Low Flow Ind
Yes
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Preparer Name
N*** B******
Preparer Title
Pipeline Compliance Specialist
Preparer Email
W********@e****.com
Preparer Telephone
713-381-3536
Prepared Date
2014-06-06 00:00:00
Authorizer Name
N*** B******
Authorizer Telephone
713-381-3536
Authorizer Title
Pipeline Compliance Specialist
Authorizer Email
W********@e****.com
Narrative
Pipeline control received a call from operations at jones creek saying a ditch is full of oil near tank 4009. The controller stopped all pumps and shut down the delivery to bp (approximately 12,500 bph). The field is checking the area around the tank to see if it is coming from enterprise. Conoco has a line right in this area as well. All tank valves have been closed, and we are waiting on more information from jones creek personnel. It has been confirmed at 21:55 hrs that enterprise is the responsible party for the crude oil release. Field operations said the source is a 12-inch surge pressure relief system. Seaway 30-inch line into jones creek was shut down at 2057 hrs. The jones creek to texas city movement was down at 2051 hrs. Osro on site cleaning leak area. Earth dike built around the spill area. Hydro excavator is excavating the site to excavate and make repairs. 12/19/2013 the leak occurred on the 12" relief line at jones creek. The line is normally static (no flow) but does have tank head pressure on it. The line was hydro excavated and a pen hole was found at the 6 o'clock position. The hole was plugged, a plidco sleeve installed, and a pumpkin enclosure was welded onto the pipe enclosing the sleeve. 06/4/2013 operations is working with it's corrosion inhibitor company to evaluate the injection of an inhibitor into the pipeline to stop any corrosion while there is no flow in the pipe. Previously, there was no inhibitor in this line.
Report Received Date 2012-10-10 00:00:00
Iyear 2012
Report Number 20120290
Supplemental Number 19454
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2012-09-11 15:30:00
Location Latitude 28.949889 Google Maps OpenStreetMap
Location Longitude -95.432381 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 100
Recovered Bbls 100
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2012-09-11 15:30:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2012-09-11 15:35:00
Restart Datetime 2012-09-14 08:00:00
On Site Datetime 2012-09-11 17:30:00
Nrc Rpt Datetime 2012-09-11 23:03:00
Nrc Rpt Num 1024149 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Automatic
Downstream Valve Type Ind Automatic
Pipe Fac Name Jones Creek Tank Farm
Segment Name S1
Onshore State Abbreviation Tx
Onshore Postal Code 77541
Onshore City Name Jones Creek
Onshore County Name Brazoria
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 48
Crossing No
Pipe Facility Type Interstate
Item Involved Relief Line And Relief Equipment
Installation Year 1976
Material Involved Carbon Steel
Release Type Leak
Leak Type Other
Leak Type Other Larger Than A Pinhole.
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 12000
Est Cost Prop Damage 20000
Est Cost Emergency 20000
Est Cost Environmental 60000
Est Cost Other 0
Prpty 112000
Accident Psig 25
Mop Psig 300
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 1000
Internal Inspection Ind No
Tight Mitered Ind Yes
Operation Complications Ind Yes
Low Flow Ind Yes
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Localized Pitting
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Preparer Name N*** B******
Preparer Title Pipeline Compliance Specialist
Preparer Email W********@e****.com
Preparer Telephone 713-381-3536
Prepared Date 2014-06-06 00:00:00
Authorizer Name N*** B******
Authorizer Telephone 713-381-3536
Authorizer Title Pipeline Compliance Specialist
Authorizer Email W********@e****.com
Narrative Pipeline control received a call from operations at jones creek saying a ditch is full of oil near tank 4009. The controller stopped all pumps and shut down the delivery to bp (approximately 12,500 bph). The field is checking the area around the tank to see if it is coming from enterprise. Conoco has a line right in this area as well. All tank valves have been closed, and we are waiting on more information from jones creek personnel. It has been confirmed at 21:55 hrs that enterprise is the responsible party for the crude oil release. Field operations said the source is a 12-inch surge pressure relief system. Seaway 30-inch line into jones creek was shut down at 2057 hrs. The jones creek to texas city movement was down at 2051 hrs. Osro on site cleaning leak area. Earth dike built around the spill area. Hydro excavator is excavating the site to excavate and make repairs. 12/19/2013 the leak occurred on the 12" relief line at jones creek. The line is normally static (no flow) but does have tank head pressure on it. The line was hydro excavated and a pen hole was found at the 6 o'clock position. The hole was plugged, a plidco sleeve installed, and a pumpkin enclosure was welded onto the pipe enclosing the sleeve. 06/4/2013 operations is working with it's corrosion inhibitor company to evaluate the injection of an inhibitor into the pipeline to stop any corrosion while there is no flow in the pipe. Previously, there was no inhibitor in this line.

All rights reserved. Copyright © by ClearPHMSA