HL incident on 2012-09-03 — PA

Operator
Buckeye Partners, Lp
Cause
Corrosion Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$10,000
Incident datetime
2012-09-03 18:52
Report number
Location
PA
Narrative
At 6:52 pm on september 3, 2012 a release was identified by buckeye personnel at the detroit terminal in detroit, mi, during a delivery from bp to the detroit terminal. Gasoline was released through a threaded plug on a dead leg of the pipeline manifold. Buckeye immediately notified bp. The line was isolated and emergency response procedures were initiated. All appropriate notifications were made. Approximately 100 gallons of gasoline were released, and 86 gallons were recovered. Impacted soil was removed and no further remediation is needed. The line has been repaired and is back in service. ***cost of remediation and repairs less than originally estimated *supplemental answered part e 5f
Detailed record list
Report Received Date
2012-10-02 00:00:00
Iyear
2012
Report Number
20120282
Supplemental Number
18862
Report Type
Supplemental Final
Operator Id
Name
Buckeye Partners, Lp
Operator Street Address
Five Tek Park
Operator City Name
Breinigsville
Operator State Abbreviation
PA
Operator Postal Code
18031
Local Datetime
2012-09-03 18:52:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
2.38
Intentional Release Bbls
0
Recovered Bbls
2.05
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2012-09-03 18:52:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-09-03 18:52:00
Restart Datetime
2012-09-04 22:00:00
On Site Datetime
2012-09-03 18:52:00
Nrc Rpt Datetime
2012-09-03 20:05:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Detroit Terminal
Segment Name
Betwd
Onshore State Abbreviation
Mi
Onshore Postal Code
48217
Onshore City Name
Detroit
Onshore County Name
Wayne
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Plug On Manifold Piping
Release Type
Leak
Leak Type
Connection Failure
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
10000
Est Cost Emergency
10000
Est Cost Environmental
0
Est Cost Other
0
Prpty
20000
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Preparer Name
H*** S******
Preparer Title
Compliance Specialist
Preparer Email
H*******@b******.com
Preparer Telephone
610-904-4916
Preparer Fax
610-904-4545
Prepared Date
2013-12-19 00:00:00
Authorizer Name
J*** R*******
Authorizer Telephone
610-904-4185
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
J********@b******.com
Narrative
At 6:52 pm on september 3, 2012 a release was identified by buckeye personnel at the detroit terminal in detroit, mi, during a delivery from bp to the detroit terminal. Gasoline was released through a threaded plug on a dead leg of the pipeline manifold. Buckeye immediately notified bp. The line was isolated and emergency response procedures were initiated. All appropriate notifications were made. Approximately 100 gallons of gasoline were released, and 86 gallons were recovered. Impacted soil was removed and no further remediation is needed. The line has been repaired and is back in service. ***cost of remediation and repairs less than originally estimated *supplemental answered part e 5f
Report Received Date 2012-10-02 00:00:00
Iyear 2012
Report Number 20120282
Supplemental Number 18862
Report Type Supplemental Final
Operator Id 1845 PHMSA Enforcement
Name Buckeye Partners, Lp
Operator Street Address Five Tek Park
Operator City Name Breinigsville
Operator State Abbreviation PA
Operator Postal Code 18031
Local Datetime 2012-09-03 18:52:00
Location Latitude 42.282925 Google Maps OpenStreetMap
Location Longitude -83.141045 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 2.38
Intentional Release Bbls 0
Recovered Bbls 2.05
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2012-09-03 18:52:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2012-09-03 18:52:00
Restart Datetime 2012-09-04 22:00:00
On Site Datetime 2012-09-03 18:52:00
Nrc Rpt Datetime 2012-09-03 20:05:00
Nrc Rpt Num 1023180 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Detroit Terminal
Segment Name Betwd
Onshore State Abbreviation Mi
Onshore Postal Code 48217
Onshore City Name Detroit
Onshore County Name Wayne
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details Plug On Manifold Piping
Release Type Leak
Leak Type Connection Failure
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Usa Ecological Ind Yes
Usa Ecological Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 10000
Est Cost Emergency 10000
Est Cost Environmental 0
Est Cost Other 0
Prpty 20000
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Preparer Name H*** S******
Preparer Title Compliance Specialist
Preparer Email H*******@b******.com
Preparer Telephone 610-904-4916
Preparer Fax 610-904-4545
Prepared Date 2013-12-19 00:00:00
Authorizer Name J*** R*******
Authorizer Telephone 610-904-4185
Authorizer Title Regulatory Compliance Manager
Authorizer Email J********@b******.com
Narrative At 6:52 pm on september 3, 2012 a release was identified by buckeye personnel at the detroit terminal in detroit, mi, during a delivery from bp to the detroit terminal. Gasoline was released through a threaded plug on a dead leg of the pipeline manifold. Buckeye immediately notified bp. The line was isolated and emergency response procedures were initiated. All appropriate notifications were made. Approximately 100 gallons of gasoline were released, and 86 gallons were recovered. Impacted soil was removed and no further remediation is needed. The line has been repaired and is back in service. ***cost of remediation and repairs less than originally estimated *supplemental answered part e 5f

All rights reserved. Copyright © by ClearPHMSA