Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2012-08-23 — OH
Operator
Marathon Pipe Line Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$89,878
Incident datetime
2012-08-23 15:20
Report number
Location
OH
Narrative
During routine maintenance at effingham, area personnel were not able to obtain the proper isolation by just closing the station valves. As a result, they had the mainline shut down and closed the upstream and downstream block valves. With the change in energy isolation plans, the area personnel failed to recognize and lock out the sump. Shortly after the upstream and downstream block valves were closed, the effingham sump kicked on (14:47) causing the pressure on the mainline between the two block valves to increase to 1500+ psig, exceeding 110% of mop. At 15:20, field personnel discovered that the resulting pressure increase caused the insulating gasket on the downstream side of valve bv1 to rupture, releasing approximately 7 gallons of crude oil to the environment. The line was excavated, all contaminated soil was removed, and the insulating gasket was replaced with a flexitallic gasket and new studs.
Detailed record list
Report Received Date
2012-09-12 00:00:00
Iyear
2012
Report Number
20120260
Supplemental Number
17973
Report Type
Supplemental Final
Operator Id
32147
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2012-08-23 14:47:00
Location Latitude
39.060075
Location Longitude
-88.495556
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.2
Intentional Release Bbls
0
Recovered Bbls
0.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2012-08-23 15:20:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Already Down For Work.
On Site Datetime
2012-08-23 15:20:00
Nrc Rpt Datetime
2012-08-24 00:25:00
Nrc Rpt Num
1022043
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Patoka - Martinsville System
Segment Name
Effingham Station
Onshore State Abbreviation
Il
Onshore Postal Code
62401
Onshore City Name
Effingham
Onshore County Name
Effingham
Designated Location
Survey Station No.
Designated Name
1950+00
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
30
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Insulating Gasket On Flange
Material Involved
Material Other Than Carbon Steel
Material Details
Resin
Release Type
Leak
Leak Type
Other
Leak Type Other
Gasket Rupture
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
20
Est Cost Prop Damage
89878
Est Cost Emergency
15504
Est Cost Environmental
0
Est Cost Other
0
Prpty
105402
Accident Psig
1500
Mop Psig
1044
Accident Pressure
Pressure Exceeded 110% Of Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Invest Maint Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Incorrect Operation
Cause Details
Pipeline Or Equipment Overpressured
Operation Type
Pipeline Or Equipment Overpressured
Related Failure Follow Ind
Yes
Category Type
Routine Maintenance
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
R**** S********
Preparer Title
Hes Professional
Preparer Email
R**********@m****************.com
Preparer Telephone
4194212121
Prepared Date
2013-04-29 00:00:00
Authorizer Name
R****** B*****
Authorizer Telephone
4194212121
Authorizer Title
Regulatory Compliance Supervisor
Authorizer Email
R*******@m****************.com
Narrative
During routine maintenance at effingham, area personnel were not able to obtain the proper isolation by just closing the station valves. As a result, they had the mainline shut down and closed the upstream and downstream block valves. With the change in energy isolation plans, the area personnel failed to recognize and lock out the sump. Shortly after the upstream and downstream block valves were closed, the effingham sump kicked on (14:47) causing the pressure on the mainline between the two block valves to increase to 1500+ psig, exceeding 110% of mop. At 15:20, field personnel discovered that the resulting pressure increase caused the insulating gasket on the downstream side of valve bv1 to rupture, releasing approximately 7 gallons of crude oil to the environment. The line was excavated, all contaminated soil was removed, and the insulating gasket was replaced with a flexitallic gasket and new studs.
| Report Received Date | 2012-09-12 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120260 |
| Supplemental Number | 17973 |
| Report Type | Supplemental Final |
| Operator Id | 32147 PHMSA Enforcement |
| Name | Marathon Pipe Line Llc |
| Operator Street Address | 539 South Main Street |
| Operator City Name | Findlay |
| Operator State Abbreviation | OH |
| Operator Postal Code | 45840 |
| Local Datetime | 2012-08-23 14:47:00 |
| Location Latitude | 39.060075 Google Maps OpenStreetMap |
| Location Longitude | -88.495556 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0.2 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0.2 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2012-08-23 15:20:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Line Was Already Down For Work. |
| On Site Datetime | 2012-08-23 15:20:00 |
| Nrc Rpt Datetime | 2012-08-24 00:25:00 |
| Nrc Rpt Num | 1022043 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Patoka - Martinsville System |
| Segment Name | Effingham Station |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62401 |
| Onshore City Name | Effingham |
| Onshore County Name | Effingham |
| Designated Location | Survey Station No. |
| Designated Name | 1950+00 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 30 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Other |
| Item Involved Details | Insulating Gasket On Flange |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Resin |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Gasket Rupture |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 20 |
| Est Cost Prop Damage | 89878 |
| Est Cost Emergency | 15504 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 105402 |
| Accident Psig | 1500 |
| Mop Psig | 1044 |
| Accident Pressure | Pressure Exceeded 110% Of Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Invest Maint Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Incorrect Operation |
| Cause Details | Pipeline Or Equipment Overpressured |
| Operation Type | Pipeline Or Equipment Overpressured |
| Related Failure Follow Ind | Yes |
| Category Type | Routine Maintenance |
| Operator Qualification Ind | Yes |
| Qualified Individuals | Yes, They Were Qualified For The Task(S) |
| Preparer Name | R**** S******** |
| Preparer Title | Hes Professional |
| Preparer Email | R**********@m****************.com |
| Preparer Telephone | 4194212121 |
| Prepared Date | 2013-04-29 00:00:00 |
| Authorizer Name | R****** B***** |
| Authorizer Telephone | 4194212121 |
| Authorizer Title | Regulatory Compliance Supervisor |
| Authorizer Email | R*******@m****************.com |
| Narrative | During routine maintenance at effingham, area personnel were not able to obtain the proper isolation by just closing the station valves. As a result, they had the mainline shut down and closed the upstream and downstream block valves. With the change in energy isolation plans, the area personnel failed to recognize and lock out the sump. Shortly after the upstream and downstream block valves were closed, the effingham sump kicked on (14:47) causing the pressure on the mainline between the two block valves to increase to 1500+ psig, exceeding 110% of mop. At 15:20, field personnel discovered that the resulting pressure increase caused the insulating gasket on the downstream side of valve bv1 to rupture, releasing approximately 7 gallons of crude oil to the environment. The line was excavated, all contaminated soil was removed, and the insulating gasket was replaced with a flexitallic gasket and new studs. |