Narrative
On july 27, 2012 at approximately 14:41 local time, adams station line 14 pumps #2 and #3 were shut down due to vibration, with a corresponding decrease in pressure downstream of rio station. Line 14 was shut down and sectionalizing valves were closed. Enbridge co located pipelines lines 6a, 61 and 13 were also shut down as a safety precaution. A release was visually confirmed by enbridge personnel who arrived on site at 15:27 local time. Enbridge has obtained the services of dnv to conduct the metallurgical analysis of the failed pipe section. Once this analysis is complete and supplemented by a root cause failure analysis, a supplemental report will be filed. Although oil did not reach ground or surface water, drinking water is being monitored as a precaution. Contaminated soil will be disposed of at an approved site. Cleanup of the site is close to completion. Approximately 36,120 tons of contaminated soil was removed from the site and disposed of at an approved location.
Detailed record list
Report Received Date
2012-08-27 00:00:00
Iyear
2012
Report Number
20120248
Supplemental Number
19113
Report Type
Supplemental Final
Operator Id
11169
Name
Enbridge Energy, Limited Partnership
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2012-07-27 14:41:00
Location Latitude
43.895611
Location Longitude
-89.638236
Commodity Released Type
Crude Oil
Unintentional Release Bbls
1729
Intentional Release Bbls
0
Recovered Bbls
1100
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2012-07-27 14:45:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-07-27 14:45:00
Restart Datetime
2012-08-07 12:20:00
On Site Datetime
2012-07-27 15:27:00
Nrc Rpt Datetime
2012-07-27 17:16:00
Nrc Rpt Num
1019189
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
5
Pipe Fac Name
Line 14 Mp 232
Segment Name
Enbridge Line 14 Adams To Mokena
Onshore State Abbreviation
Wi
Onshore Postal Code
53936
Onshore City Name
Grand Marsh
Onshore County Name
Adams
Designated Location
Milepost/valve Station
Designated Name
232
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
55
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Seam
Pipe Diameter
24
Pipe Wall Thickness
0.328
Pipe Smys
70000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - High Frequency
Pipe Manufacturer
Stupp Pipe Corporation
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
1998
Manufactured Year
1998
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
6.2
Rupture Length
50.1
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
1027158
Est Cost Gas Released
133133
Est Cost Prop Damage
1510369
Est Cost Emergency
623877
Est Cost Environmental
1680707
Est Cost Other
39164
Est Cost Other Details
Legal Fees
Prpty
5014408
Accident Psig
1220
Mop Psig
1378
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
77880
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Invest Other Ind
Yes
Invest Other Ind Details
Preliminary Investigation Conducted By Control Center
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Metallurgical Ind
Yes
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Fatigue Vibr Related
Yes
Failure Subtype
Pressure-Related
Additional Crack Ind
Yes
Additional Lack Fusion Ind
Yes
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Geometry Deformation Ind
Yes
Emat Ind
Yes
Axial Recent Year
2011
Geometry Recent Year
2011
Emat Recent Year
2007
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
S**** S****
Preparer Title
Compliance Analyst
Preparer Email
S**********@e*******.com
Preparer Telephone
218-464-5754
Preparer Fax
218-464-5992
Prepared Date
2014-03-11 00:00:00
Authorizer Name
D**** S*******
Authorizer Telephone
218-464-5751
Authorizer Title
Manager Us Pipeline Compliance
Authorizer Email
D*************@e*******.com
Narrative
On july 27, 2012 at approximately 14:41 local time, adams station line 14 pumps #2 and #3 were shut down due to vibration, with a corresponding decrease in pressure downstream of rio station. Line 14 was shut down and sectionalizing valves were closed. Enbridge co located pipelines lines 6a, 61 and 13 were also shut down as a safety precaution. A release was visually confirmed by enbridge personnel who arrived on site at 15:27 local time. Enbridge has obtained the services of dnv to conduct the metallurgical analysis of the failed pipe section. Once this analysis is complete and supplemented by a root cause failure analysis, a supplemental report will be filed. Although oil did not reach ground or surface water, drinking water is being monitored as a precaution. Contaminated soil will be disposed of at an approved site. Cleanup of the site is close to completion. Approximately 36,120 tons of contaminated soil was removed from the site and disposed of at an approved location.
| Report Received Date | 2012-08-27 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120248 |
| Supplemental Number | 19113 |
| Report Type | Supplemental Final |
| Operator Id | 11169 PHMSA Enforcement |
| Name | Enbridge Energy, Limited Partnership |
| Operator Street Address | 915 N Eldridge Parkway, Suite 1100 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2012-07-27 14:41:00 |
| Location Latitude | 43.895611 Google Maps OpenStreetMap |
| Location Longitude | -89.638236 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 1729 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 1100 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2012-07-27 14:45:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2012-07-27 14:45:00 |
| Restart Datetime | 2012-08-07 12:20:00 |
| On Site Datetime | 2012-07-27 15:27:00 |
| Nrc Rpt Datetime | 2012-07-27 17:16:00 |
| Nrc Rpt Num | 1019189 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Num Pub Evacuated | 5 |
| Pipe Fac Name | Line 14 Mp 232 |
| Segment Name | Enbridge Line 14 Adams To Mokena |
| Onshore State Abbreviation | Wi |
| Onshore Postal Code | 53936 |
| Onshore City Name | Grand Marsh |
| Onshore County Name | Adams |
| Designated Location | Milepost/valve Station |
| Designated Name | 232 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 55 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Seam |
| Pipe Diameter | 24 |
| Pipe Wall Thickness | 0.328 |
| Pipe Smys | 70000 |
| Pipe Specification | Api 5l |
| Pipe Seam Type | Erw - High Frequency |
| Pipe Manufacturer | Stupp Pipe Corporation |
| Pipe Coating Type | Fusion Bonded Epoxy(Fbe) |
| Installation Year | 1998 |
| Manufactured Year | 1998 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 6.2 |
| Rupture Length | 50.1 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 1027158 |
| Est Cost Gas Released | 133133 |
| Est Cost Prop Damage | 1510369 |
| Est Cost Emergency | 623877 |
| Est Cost Environmental | 1680707 |
| Est Cost Other | 39164 |
| Est Cost Other Details | Legal Fees |
| Prpty | 5014408 |
| Accident Psig | 1220 |
| Mop Psig | 1378 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 77880 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Invest Other Ind | Yes |
| Invest Other Ind Details | Preliminary Investigation Conducted By Control Center |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Metallurgical Ind | Yes |
| Failure Type | Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field) |
| Fatigue Vibr Related | Yes |
| Failure Subtype | Pressure-Related |
| Additional Crack Ind | Yes |
| Additional Lack Fusion Ind | Yes |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Geometry Deformation Ind | Yes |
| Emat Ind | Yes |
| Axial Recent Year | 2011 |
| Geometry Recent Year | 2011 |
| Emat Recent Year | 2007 |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | S**** S**** |
| Preparer Title | Compliance Analyst |
| Preparer Email | S**********@e*******.com |
| Preparer Telephone | 218-464-5754 |
| Preparer Fax | 218-464-5992 |
| Prepared Date | 2014-03-11 00:00:00 |
| Authorizer Name | D**** S******* |
| Authorizer Telephone | 218-464-5751 |
| Authorizer Title | Manager Us Pipeline Compliance |
| Authorizer Email | D*************@e*******.com |
| Narrative | On july 27, 2012 at approximately 14:41 local time, adams station line 14 pumps #2 and #3 were shut down due to vibration, with a corresponding decrease in pressure downstream of rio station. Line 14 was shut down and sectionalizing valves were closed. Enbridge co located pipelines lines 6a, 61 and 13 were also shut down as a safety precaution. A release was visually confirmed by enbridge personnel who arrived on site at 15:27 local time. Enbridge has obtained the services of dnv to conduct the metallurgical analysis of the failed pipe section. Once this analysis is complete and supplemented by a root cause failure analysis, a supplemental report will be filed. Although oil did not reach ground or surface water, drinking water is being monitored as a precaution. Contaminated soil will be disposed of at an approved site. Cleanup of the site is close to completion. Approximately 36,120 tons of contaminated soil was removed from the site and disposed of at an approved location. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA