HL incident on 2012-06-11 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Material Failure Of Pipe Or Weld
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,000
Incident datetime
2012-06-11 08:05
Report number
Location
TX
Narrative
During morning station checks, the station operator discovered a 2" fitting on the new station piping leaking at the weld. Section of pipe was isolated and the 2" fitting was cut out and two flanges welded on. The cut-out section was sent to houston metallurgical for failure analysis. Find attached the metallurgical report as requested.
Detailed record list
Report Received Date
2012-07-05 00:00:00
Iyear
2012
Report Number
20120205
Supplemental Number
19060
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2012-06-11 08:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0.25
Intentional Release Bbls
0
Recovered Bbls
0.25
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2012-06-11 08:05:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
On Site Datetime
2012-06-11 08:10:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Jones Creek Terminal
Segment Name
S1
Onshore State Abbreviation
Tx
Onshore Postal Code
77541
Onshore City Name
Jones Creek, Tx
Onshore County Name
Brazoria
Designated Location
Milepost/valve Station
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Release Type
Leak
Leak Type
Crack
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
25
Est Cost Prop Damage
1000
Est Cost Emergency
500
Est Cost Environmental
2000
Est Cost Other
0
Prpty
3525
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Preparer Name
N*** B******
Preparer Telephone
713-381-3536
Prepared Date
2014-02-27 00:00:00
Authorizer Name
N*** B******
Authorizer Telephone
713-381-3536
Authorizer Email
W********@e****.com
Narrative
During morning station checks, the station operator discovered a 2" fitting on the new station piping leaking at the weld. Section of pipe was isolated and the 2" fitting was cut out and two flanges welded on. The cut-out section was sent to houston metallurgical for failure analysis. Find attached the metallurgical report as requested.
Report Received Date 2012-07-05 00:00:00
Iyear 2012
Report Number 20120205
Supplemental Number 19060
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2012-06-11 08:00:00
Location Latitude 28.949672 Google Maps OpenStreetMap
Location Longitude -95.431631 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0.25
Intentional Release Bbls 0
Recovered Bbls 0.25
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2012-06-11 08:05:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind No
On Site Datetime 2012-06-11 08:10:00
Ignite Ind No
Explode Ind No
Pipe Fac Name Jones Creek Terminal
Segment Name S1
Onshore State Abbreviation Tx
Onshore Postal Code 77541
Onshore City Name Jones Creek, Tx
Onshore County Name Brazoria
Designated Location Milepost/valve Station
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Interstate
Item Involved Weld, Including Heat-Affected Zone
Release Type Leak
Leak Type Crack
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 25
Est Cost Prop Damage 1000
Est Cost Emergency 500
Est Cost Environmental 2000
Est Cost Other 0
Prpty 3525
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Preparer Name N*** B******
Preparer Telephone 713-381-3536
Prepared Date 2014-02-27 00:00:00
Authorizer Name N*** B******
Authorizer Telephone 713-381-3536
Authorizer Email W********@e****.com
Narrative During morning station checks, the station operator discovered a 2" fitting on the new station piping leaking at the weld. Section of pipe was isolated and the 2" fitting was cut out and two flanges welded on. The cut-out section was sent to houston metallurgical for failure analysis. Find attached the metallurgical report as requested.