Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2012-06-08 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Material Failure Of Pipe Or Weld
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$100,000
Incident datetime
2012-06-08 09:27
Report number
Location
OK
Narrative
A member of the public notified magellan personnel of what appeared to be dead spots of vegetation in a farm field. The line was shut down and magellan personnel investigated and found what appeared to be product. Excavation confirmed a pinhole size anomaly in the pipe. The defective pipe was replaced with a segment of new, pre-tested pipe. Metallurgical laboratory analysis determined the leak resulted from an area of latent mechanical damage containing a dent or a gouge that degraded due to environmentally assisted cracking and corrosion. Approximately 7,200 cubic yards of impacted soil was remediated in accordance with state and company standards. In nrc report 1013958, the national response center mistakenly classified the released product as crude oil instead of diesel fuel so the nrc issued correction report #1014483 listing diesel fuel. Phmsa's file on this release should be amended to reflect the correction report and magellan should be credited for calling the national response center at 12:54 central time. Phmsa's hazardous liquid accident reporting filing instructions revised in december, 2012 permit filing a final report containing the estimated total volume of product expected to be recovered along with the projected cost of the total environmental remediation "...When the estimated final costs and volume of commodity recovered can be predicted with a reasonable degree of accuracy" (page 5 of 30 of the instructions). As listed elsewhere in this report the projected total product recovery is estimated to be 213 bbls, and the environmental remediation cost is estimated to be $700,000.
Detailed record list
Report Received Date
2012-06-29 00:00:00
Iyear
2012
Report Number
20120200
Supplemental Number
17619
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2012-06-08 09:05:00
Location Latitude
37.93455
Location Longitude
-95.243912
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
304
Intentional Release Bbls
0
Recovered Bbls
213
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2012-06-08 09:27:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-06-08 09:27:00
Restart Datetime
2012-06-09 10:26:00
On Site Datetime
2012-06-08 14:30:00
Nrc Rpt Datetime
2012-06-08 12:54:00
Nrc Rpt Num
1013958
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Pipe Fac Name
#3-8" Barnsdall To Kansas City Line
Segment Name
Line Id #6020
Onshore State Abbreviation
Ks
Onshore Postal Code
66755
Onshore City Name
Moran
Onshore County Name
Allen
Designated Location
Milepost/valve Station
Designated Name
106.45
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.203
Pipe Smys
35000
Pipe Specification
Api 5l Grade B
Pipe Seam Type
Seamless
Pipe Manufacturer
National Tube
Pipe Coating Type
Coal Tar
Installation Year
1946
Manufactured Year
1946
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
External Corrosion And Environmental Assisted Cracking Occurred Within An Area Of Latent Mechanical Damage To Produce Through The Wall Cracking Resulting In A Leak.
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
4.8
Rel Water Name
Farm Pond
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
20000
Est Cost Gas Released
34984
Est Cost Prop Damage
100000
Est Cost Emergency
97534
Est Cost Environmental
700000
Est Cost Other
0
Prpty
952518
Accident Psig
1050
Mop Psig
1146
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
285120
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release was not detectable via scada or detectable on the cpm system the controller operating the line followed magellan proecedures and did not cause or contribute to the incident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Environmental Cracking-Related
Metallurgical Ind
Yes
Failure Type
Environmental Cracking-Related
Stress Subtype
Other
Stress Details
External Corrosion And Environmentally Assisted Cracking Occurred In Area Of Latent Mechanical Damage Containing A Dent Or Gouge
Additional Dent Ind
Yes
Additional Gouge Ind
Yes
Collected Data Ind
Yes
Ultrasonic Ind
Yes
Geometry Deformation Ind
Yes
Ultrasonic Recent Year
2002
Geometry Recent Year
2002
Other Recent Year
2012
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1987
Hydrtst Most Rcnt Pressure
1463
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K****** L* L*******
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7246
Prepared Date
2013-03-20 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
K***********@m*********.com
Narrative
A member of the public notified magellan personnel of what appeared to be dead spots of vegetation in a farm field. The line was shut down and magellan personnel investigated and found what appeared to be product. Excavation confirmed a pinhole size anomaly in the pipe. The defective pipe was replaced with a segment of new, pre-tested pipe. Metallurgical laboratory analysis determined the leak resulted from an area of latent mechanical damage containing a dent or a gouge that degraded due to environmentally assisted cracking and corrosion. Approximately 7,200 cubic yards of impacted soil was remediated in accordance with state and company standards. In nrc report 1013958, the national response center mistakenly classified the released product as crude oil instead of diesel fuel so the nrc issued correction report #1014483 listing diesel fuel. Phmsa's file on this release should be amended to reflect the correction report and magellan should be credited for calling the national response center at 12:54 central time. Phmsa's hazardous liquid accident reporting filing instructions revised in december, 2012 permit filing a final report containing the estimated total volume of product expected to be recovered along with the projected cost of the total environmental remediation "...When the estimated final costs and volume of commodity recovered can be predicted with a reasonable degree of accuracy" (page 5 of 30 of the instructions). As listed elsewhere in this report the projected total product recovery is estimated to be 213 bbls, and the environmental remediation cost is estimated to be $700,000.
| Report Received Date | 2012-06-29 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120200 |
| Supplemental Number | 17619 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2012-06-08 09:05:00 |
| Location Latitude | 37.93455 Google Maps OpenStreetMap |
| Location Longitude | -95.243912 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 304 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 213 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2012-06-08 09:27:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2012-06-08 09:27:00 |
| Restart Datetime | 2012-06-09 10:26:00 |
| On Site Datetime | 2012-06-08 14:30:00 |
| Nrc Rpt Datetime | 2012-06-08 12:54:00 |
| Nrc Rpt Num | 1013958 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Pipe Fac Name | #3-8" Barnsdall To Kansas City Line |
| Segment Name | Line Id #6020 |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 66755 |
| Onshore City Name | Moran |
| Onshore County Name | Allen |
| Designated Location | Milepost/valve Station |
| Designated Name | 106.45 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 36 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.203 |
| Pipe Smys | 35000 |
| Pipe Specification | Api 5l Grade B |
| Pipe Seam Type | Seamless |
| Pipe Manufacturer | National Tube |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1946 |
| Manufactured Year | 1946 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | External Corrosion And Environmental Assisted Cracking Occurred Within An Area Of Latent Mechanical Damage To Produce Through The Wall Cracking Resulting In A Leak. |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | Yes |
| Remediation Ind | Yes |
| Groundwater Remed Ind | Yes |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Amount Released | 4.8 |
| Rel Water Name | Farm Pond |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 20000 |
| Est Cost Gas Released | 34984 |
| Est Cost Prop Damage | 100000 |
| Est Cost Emergency | 97534 |
| Est Cost Environmental | 700000 |
| Est Cost Other | 0 |
| Prpty | 952518 |
| Accident Psig | 1050 |
| Mop Psig | 1146 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 285120 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The release was not detectable via scada or detectable on the cpm system the controller operating the line followed magellan proecedures and did not cause or contribute to the incident. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Environmental Cracking-Related |
| Metallurgical Ind | Yes |
| Failure Type | Environmental Cracking-Related |
| Stress Subtype | Other |
| Stress Details | External Corrosion And Environmentally Assisted Cracking Occurred In Area Of Latent Mechanical Damage Containing A Dent Or Gouge |
| Additional Dent Ind | Yes |
| Additional Gouge Ind | Yes |
| Collected Data Ind | Yes |
| Ultrasonic Ind | Yes |
| Geometry Deformation Ind | Yes |
| Ultrasonic Recent Year | 2002 |
| Geometry Recent Year | 2002 |
| Other Recent Year | 2012 |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 1987 |
| Hydrtst Most Rcnt Pressure | 1463 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | K****** L* L******* |
| Preparer Title | Sr. Compliance Coordinator |
| Preparer Email | K***********@m*********.com |
| Preparer Telephone | 918-574-7315 |
| Preparer Fax | 918-574-7246 |
| Prepared Date | 2013-03-20 00:00:00 |
| Authorizer Name | K****** L* L******* |
| Authorizer Telephone | 918-574-7315 |
| Authorizer Title | Sr. Compliance Coordinator |
| Authorizer Email | K***********@m*********.com |
| Narrative | A member of the public notified magellan personnel of what appeared to be dead spots of vegetation in a farm field. The line was shut down and magellan personnel investigated and found what appeared to be product. Excavation confirmed a pinhole size anomaly in the pipe. The defective pipe was replaced with a segment of new, pre-tested pipe. Metallurgical laboratory analysis determined the leak resulted from an area of latent mechanical damage containing a dent or a gouge that degraded due to environmentally assisted cracking and corrosion. Approximately 7,200 cubic yards of impacted soil was remediated in accordance with state and company standards. In nrc report 1013958, the national response center mistakenly classified the released product as crude oil instead of diesel fuel so the nrc issued correction report #1014483 listing diesel fuel. Phmsa's file on this release should be amended to reflect the correction report and magellan should be credited for calling the national response center at 12:54 central time. Phmsa's hazardous liquid accident reporting filing instructions revised in december, 2012 permit filing a final report containing the estimated total volume of product expected to be recovered along with the projected cost of the total environmental remediation "...When the estimated final costs and volume of commodity recovered can be predicted with a reasonable degree of accuracy" (page 5 of 30 of the instructions). As listed elsewhere in this report the projected total product recovery is estimated to be 213 bbls, and the environmental remediation cost is estimated to be $700,000. |