HL incident on 2012-05-17 — UT
Operator
Sinclair Transportation Company
Cause
Corrosion Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$6,000
Incident datetime
2012-05-17 09:30
Report number
Location
UT
Narrative
While performing an integrity assesment pressure test of the section of the line, a hydrotest was initially started at 1530 on may 16, 2 012. The section did not hold pressure at the 500 psi hold. A 50 gallon per hour leak was declared and the freeze plug crew was called out. A line inspector on an atv quickly found an approximately 10 gal/hr leak in the bank of a span upstream of the revere bv. The line was depressurized and an unsuccessful attempt to repair the leak with a patch was made. The leak was then clamped and the test resumed at approximately 2145. The section again did not hold at 500 psi and a 40 gal/hr leak was declared. The night of may 16-17 was spent freeze plugging and narrowing the search for the leak. After setting three freeze plugs and narrowing the leaking section to 7 miles, an active leak site with petroleum contaminated soil was discovered at approximate station 2219+74 at approximately 0930 on may 17, 2012. Notifications for the product leak were made. The leak was excavated and evaluated. A roll of woven wire fencing was excavated in close proximity to the leaking pit. Two pits were discovered in the same joint of pipe approximately 10 feet apart. 135 feet of pipe were replaced with new pipe. State of missouri dnr visited the site and approved of the repair and clean-up plan. The section was repressurized with water at 0130 on may 18, 2012.
Detailed record list
Report Received Date
2012-06-13 00:00:00
Iyear
2012
Report Number
20120183
Supplemental Number
17132
Report Type
Supplemental Final
Operator Id
15156
Name
Sinclair Transportation Company
Operator Street Address
550 East South Temple
Operator City Name
Salt Lake City
Operator State Abbreviation
UT
Operator Postal Code
84102
Local Datetime
2012-05-17 09:30:00
Location Latitude
40.40966
Location Longitude
-91.83585
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Mixture Of Refined Products (Transmix Or Other Mixture)
Unintentional Release Bbls
5
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Static Shut-In Test Or Other Pressure Or Leak Test
Incident Identified Datetime
2012-05-17 09:30:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Accident Discovered Due To A Failure During A Hydrotest.
On Site Datetime
2012-05-17 09:30:00
Nrc Rpt Datetime
2012-05-17 10:20:00
Nrc Rpt Num
1011800
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Mid-Continent District
Segment Name
Gibbs To Montrose
Onshore State Abbreviation
Mo
Onshore Postal Code
63445
Onshore City Name
Kahoka
Onshore County Name
Clark
Designated Location
Milepost/valve Station
Designated Name
2219+74
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Depth Of Cover
24
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.322
Pipe Smys
24000
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
None
Installation Year
1930
Manufactured Year
1930
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
2000
Est Cost Gas Released
600
Est Cost Prop Damage
6000
Est Cost Emergency
0
Est Cost Environmental
33370
Est Cost Other
0
Prpty
41970
Accident Psig
50
Mop Psig
485
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
121440
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
Acetylene Welds With Excess Weld Metal Protuding Into Pipe Bore.
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Schedule Ind
Yes
Invest No Schedule Ind Details
Date Of Release Has Not Been Determined. Multiple Controllers Monitored System When And After Release Occurred. Scada Data Did Not Provide Leak Indication.
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1957
Shielding Evident
No
Cathodic Survey Type
Yes
Close Interval Survey Ind
Yes
Close Interval Survey Year
2003
Prior Damage
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2009
Hydrtst Most Rcnt Pressure
705
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
G**** G******
Preparer Title
Office Manager
Preparer Email
G*******@s**********.com
Preparer Telephone
660-542-0206
Preparer Fax
660-542-0351
Prepared Date
2012-12-20 00:00:00
Authorizer Name
M*** P*******
Authorizer Telephone
801-524-2852
Authorizer Title
Vice President Transportation
Authorizer Email
M********@s**********.com
Narrative
While performing an integrity assesment pressure test of the section of the line, a hydrotest was initially started at 1530 on may 16, 2 012. The section did not hold pressure at the 500 psi hold. A 50 gallon per hour leak was declared and the freeze plug crew was called out. A line inspector on an atv quickly found an approximately 10 gal/hr leak in the bank of a span upstream of the revere bv. The line was depressurized and an unsuccessful attempt to repair the leak with a patch was made. The leak was then clamped and the test resumed at approximately 2145. The section again did not hold at 500 psi and a 40 gal/hr leak was declared. The night of may 16-17 was spent freeze plugging and narrowing the search for the leak. After setting three freeze plugs and narrowing the leaking section to 7 miles, an active leak site with petroleum contaminated soil was discovered at approximate station 2219+74 at approximately 0930 on may 17, 2012. Notifications for the product leak were made. The leak was excavated and evaluated. A roll of woven wire fencing was excavated in close proximity to the leaking pit. Two pits were discovered in the same joint of pipe approximately 10 feet apart. 135 feet of pipe were replaced with new pipe. State of missouri dnr visited the site and approved of the repair and clean-up plan. The section was repressurized with water at 0130 on may 18, 2012.
| Report Received Date | 2012-06-13 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120183 |
| Supplemental Number | 17132 |
| Report Type | Supplemental Final |
| Operator Id | 15156 PHMSA Enforcement |
| Name | Sinclair Transportation Company |
| Operator Street Address | 550 East South Temple |
| Operator City Name | Salt Lake City |
| Operator State Abbreviation | UT |
| Operator Postal Code | 84102 |
| Local Datetime | 2012-05-17 09:30:00 |
| Location Latitude | 40.40966 Google Maps OpenStreetMap |
| Location Longitude | -91.83585 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Mixture Of Refined Products (Transmix Or Other Mixture) |
| Unintentional Release Bbls | 5 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Static Shut-In Test Or Other Pressure Or Leak Test |
| Incident Identified Datetime | 2012-05-17 09:30:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Accident Discovered Due To A Failure During A Hydrotest. |
| On Site Datetime | 2012-05-17 09:30:00 |
| Nrc Rpt Datetime | 2012-05-17 10:20:00 |
| Nrc Rpt Num | 1011800 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Mid-Continent District |
| Segment Name | Gibbs To Montrose |
| Onshore State Abbreviation | Mo |
| Onshore Postal Code | 63445 |
| Onshore City Name | Kahoka |
| Onshore County Name | Clark |
| Designated Location | Milepost/valve Station |
| Designated Name | 2219+74 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Depth Of Cover | 24 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.322 |
| Pipe Smys | 24000 |
| Pipe Specification | Unknown |
| Pipe Seam Type | Other |
| Pipe Seam Details | Unknown |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | None |
| Installation Year | 1930 |
| Manufactured Year | 1930 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 2000 |
| Est Cost Gas Released | 600 |
| Est Cost Prop Damage | 6000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 33370 |
| Est Cost Other | 0 |
| Prpty | 41970 |
| Accident Psig | 50 |
| Mop Psig | 485 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 121440 |
| Internal Inspection Ind | No |
| Other Inspection Ind | Yes |
| Internal Inspection Details | Acetylene Welds With Excess Weld Metal Protuding Into Pipe Bore. |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest No Schedule Ind | Yes |
| Invest No Schedule Ind Details | Date Of Release Has Not Been Determined. Multiple Controllers Monitored System When And After Release Occurred. Scada Data Did Not Provide Leak Indication. |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Galvanic Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | 1957 |
| Shielding Evident | No |
| Cathodic Survey Type | Yes |
| Close Interval Survey Ind | Yes |
| Close Interval Survey Year | 2003 |
| Prior Damage | No |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2009 |
| Hydrtst Most Rcnt Pressure | 705 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | G**** G****** |
| Preparer Title | Office Manager |
| Preparer Email | G*******@s**********.com |
| Preparer Telephone | 660-542-0206 |
| Preparer Fax | 660-542-0351 |
| Prepared Date | 2012-12-20 00:00:00 |
| Authorizer Name | M*** P******* |
| Authorizer Telephone | 801-524-2852 |
| Authorizer Title | Vice President Transportation |
| Authorizer Email | M********@s**********.com |
| Narrative | While performing an integrity assesment pressure test of the section of the line, a hydrotest was initially started at 1530 on may 16, 2 012. The section did not hold pressure at the 500 psi hold. A 50 gallon per hour leak was declared and the freeze plug crew was called out. A line inspector on an atv quickly found an approximately 10 gal/hr leak in the bank of a span upstream of the revere bv. The line was depressurized and an unsuccessful attempt to repair the leak with a patch was made. The leak was then clamped and the test resumed at approximately 2145. The section again did not hold at 500 psi and a 40 gal/hr leak was declared. The night of may 16-17 was spent freeze plugging and narrowing the search for the leak. After setting three freeze plugs and narrowing the leaking section to 7 miles, an active leak site with petroleum contaminated soil was discovered at approximate station 2219+74 at approximately 0930 on may 17, 2012. Notifications for the product leak were made. The leak was excavated and evaluated. A roll of woven wire fencing was excavated in close proximity to the leaking pit. Two pits were discovered in the same joint of pipe approximately 10 feet apart. 135 feet of pipe were replaced with new pipe. State of missouri dnr visited the site and approved of the repair and clean-up plan. The section was repressurized with water at 0130 on may 18, 2012. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA