Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2012-04-29 — TX
Operator
Plains Pipeline, L.p.
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2012-04-29 20:45
Report number
Location
TX
Narrative
Approximately 15 barrels of crude oil was released from the roof drain of tank 41063. At this time, the cause of the release is still under investigation. A supplemental report will be submitted once the investigation is complete. Supplemental narrative: based on the investigation, the cause of this release was due to external corrosion. Two pin hole size pits were observed on the lower section of the internal roof drain line. The drain line was replaced and the tank was put back in service once the repairs were completed.
Detailed record list
Report Received Date
2012-05-29 00:00:00
Iyear
2012
Report Number
20120167
Supplemental Number
17795
Report Type
Supplemental Final
Operator Id
Name
Plains Pipeline, L.p.
Operator Street Address
333 Clay Street, Suite 1900
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2012-04-29 18:00:00
Location Latitude
35.7688889
Location Longitude
-97.6930556
Commodity Released Type
Crude Oil
Unintentional Release Bbls
15
Recovered Bbls
15
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2012-04-29 20:45:00
System Part Involved
Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Tank Release - Shutdown Was Not Necessary
On Site Datetime
2012-04-29 21:20:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cashion Station
Segment Name
Tank 41063
Onshore State Abbreviation
Ok
Onshore Postal Code
73016
Onshore City Name
Cashion
Onshore County Name
Kingfisher
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Inside Tank
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Tank Type
Atmospheric
Item Involved Details
Roof Drain Line
Installation Year
1999
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
2800
Est Cost Environmental
0
Est Cost Other
0
Prpty
2800
Accident Psig
0
Mop Psig
0
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Release was not due to action or inaction of the system controller.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
No
Externally Coated
No
Prior Damage
No
Preparer Name
S***** N*****
Preparer Title
Compliance Specialist
Preparer Email
S******@p****.com
Preparer Telephone
713-993-5673
Preparer Fax
713-646-4310
Prepared Date
2013-04-03 00:00:00
Authorizer Name
J***** R J****
Authorizer Telephone
713-993-5162
Authorizer Title
Sr Director Env And Regulatory Compliance
Authorizer Email
J******@p****.com
Narrative
Approximately 15 barrels of crude oil was released from the roof drain of tank 41063. At this time, the cause of the release is still under investigation. A supplemental report will be submitted once the investigation is complete. Supplemental narrative: based on the investigation, the cause of this release was due to external corrosion. Two pin hole size pits were observed on the lower section of the internal roof drain line. The drain line was replaced and the tank was put back in service once the repairs were completed.
| Report Received Date | 2012-05-29 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120167 |
| Supplemental Number | 17795 |
| Report Type | Supplemental Final |
| Operator Id | 300 PHMSA Enforcement |
| Name | Plains Pipeline, L.p. |
| Operator Street Address | 333 Clay Street, Suite 1900 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2012-04-29 18:00:00 |
| Location Latitude | 35.7688889 Google Maps OpenStreetMap |
| Location Longitude | -97.6930556 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 15 |
| Recovered Bbls | 15 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2012-04-29 20:45:00 |
| System Part Involved | Onshore Breakout Tank Or Storage Vessel, Including Attached Appurtenances |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Tank Release - Shutdown Was Not Necessary |
| On Site Datetime | 2012-04-29 21:20:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cashion Station |
| Segment Name | Tank 41063 |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 73016 |
| Onshore City Name | Cashion |
| Onshore County Name | Kingfisher |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Other |
| Incident Area Details | Inside Tank |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Other |
| Tank Type | Atmospheric |
| Item Involved Details | Roof Drain Line |
| Installation Year | 1999 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 2800 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 2800 |
| Accident Psig | 0 |
| Mop Psig | 0 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | Release was not due to action or inaction of the system controller. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Galvanic Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Underground Location | No |
| Externally Coated | No |
| Prior Damage | No |
| Preparer Name | S***** N***** |
| Preparer Title | Compliance Specialist |
| Preparer Email | S******@p****.com |
| Preparer Telephone | 713-993-5673 |
| Preparer Fax | 713-646-4310 |
| Prepared Date | 2013-04-03 00:00:00 |
| Authorizer Name | J***** R J**** |
| Authorizer Telephone | 713-993-5162 |
| Authorizer Title | Sr Director Env And Regulatory Compliance |
| Authorizer Email | J******@p****.com |
| Narrative | Approximately 15 barrels of crude oil was released from the roof drain of tank 41063. At this time, the cause of the release is still under investigation. A supplemental report will be submitted once the investigation is complete. Supplemental narrative: based on the investigation, the cause of this release was due to external corrosion. Two pin hole size pits were observed on the lower section of the internal roof drain line. The drain line was replaced and the tank was put back in service once the repairs were completed. |
External Resources
PHMSA pipeline safety insights.