HL incident on 2012-04-09 — OK
Operator
Oneok Ngl Pipeline Lp
Cause
Incorrect Operation
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$100
Incident datetime
2012-04-09 19:15
Report number
Location
OK
Narrative
At 19:15 on 4/09/2012, landowner called oneok pipeline control center in tulsa to report he could see vapors coming from oneok's pipe at the binger jct. #2 location. Field reps were contacted and dispacthed to site. Field rep arrived on site at approximately 19:35 and determined tattletale valve on scraper receiver trap was leaking. Scraper barrel was isolated and blown down. Defective tattletale was replaced. 10/16/2013 - requested by PHMSA david eng to change "apparent cause" to g7 "-incorrect operation". Oneok's incident investigation determined the leak orginated in the threads at, or near the base of the tattletale fitting. It is unknown whether these threads were defective from the factory, damaged during installation of the fitting, or possibly damaged during shipping and installation of the trap to the pipeline during construction. Oneok inspected other traps that were installed with this type fitting during the same time period and found all to be in good working order. 2/19/2014 - the pig trap and tattletale valve were originally installed february of 2012. Nj
Detailed record list
Report Received Date
2012-05-07 00:00:00
Iyear
2012
Report Number
20120139
Supplemental Number
19031
Report Type
Supplemental Final
Operator Id
32109
Name
Oneok Ngl Pipeline Lp
Operator Street Address
100 West Fifth Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2012-04-09 19:15:00
Location Latitude
35.34866
Location Longitude
-98.09101
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Other Hvl
Commodity Details
Y-Grade (Raw Feed)
Unintentional Release Bbls
1.84
Intentional Release Bbls
0.24
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2012-04-09 19:15:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Release Occurred On Pig Trap Barrel, Barrel Was Isolated
On Site Datetime
2012-04-09 19:35:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Oneok Binger Jct. 2
Segment Name
Granite Pipeline Receiver Trap
Onshore State Abbreviation
Ok
Onshore Postal Code
73059
Onshore City Name
Minco
Onshore County Name
Grady
Designated Location
Milepost/valve Station
Designated Name
7007+87
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Pipe Facility Type
Intrastate
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Release Type
Leak
Leak Type
Crack
Leak Type Other
Crack In Fitting
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
73
Est Cost Prop Damage
100
Est Cost Emergency
150
Est Cost Environmental
0
Est Cost Other
0
Prpty
323
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Damage By Operator Or Operator's Contractor Not Related To Excavation And Not Due To Motorized Vehicle/equipment Damage
Operation Type
Damage By Operator Or Operator's Contractor Not Related To Excavation And Not Due To Motorized Vehicle/equipment Damage
Preparer Name
N*** J****
Preparer Title
Dot Compliance Coordinator
Preparer Email
N*********@o****.com
Preparer Telephone
580-395-6304
Preparer Fax
580-395-2933
Prepared Date
2014-02-19 00:00:00
Authorizer Name
N*** J****
Authorizer Telephone
580-395-6304
Authorizer Title
Dot Compliance Coordinator
Authorizer Email
N*********@o****.com
Narrative
At 19:15 on 4/09/2012, landowner called oneok pipeline control center in tulsa to report he could see vapors coming from oneok's pipe at the binger jct. #2 location. Field reps were contacted and dispacthed to site. Field rep arrived on site at approximately 19:35 and determined tattletale valve on scraper receiver trap was leaking. Scraper barrel was isolated and blown down. Defective tattletale was replaced. 10/16/2013 - requested by PHMSA david eng to change "apparent cause" to g7 "-incorrect operation". Oneok's incident investigation determined the leak orginated in the threads at, or near the base of the tattletale fitting. It is unknown whether these threads were defective from the factory, damaged during installation of the fitting, or possibly damaged during shipping and installation of the trap to the pipeline during construction. Oneok inspected other traps that were installed with this type fitting during the same time period and found all to be in good working order. 2/19/2014 - the pig trap and tattletale valve were originally installed february of 2012. Nj
| Report Received Date | 2012-05-07 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120139 |
| Supplemental Number | 19031 |
| Report Type | Supplemental Final |
| Operator Id | 32109 PHMSA Enforcement |
| Name | Oneok Ngl Pipeline Lp |
| Operator Street Address | 100 West Fifth Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2012-04-09 19:15:00 |
| Location Latitude | 35.34866 Google Maps OpenStreetMap |
| Location Longitude | -98.09101 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Other Hvl |
| Commodity Details | Y-Grade (Raw Feed) |
| Unintentional Release Bbls | 1.84 |
| Intentional Release Bbls | 0.24 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2012-04-09 19:15:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Release Occurred On Pig Trap Barrel, Barrel Was Isolated |
| On Site Datetime | 2012-04-09 19:35:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Oneok Binger Jct. 2 |
| Segment Name | Granite Pipeline Receiver Trap |
| Onshore State Abbreviation | Ok |
| Onshore Postal Code | 73059 |
| Onshore City Name | Minco |
| Onshore County Name | Grady |
| Designated Location | Milepost/valve Station |
| Designated Name | 7007+87 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Pipe Facility Type | Intrastate |
| Item Involved | Valve |
| Valve Type | Auxiliary Or Other Valve |
| Release Type | Leak |
| Leak Type | Crack |
| Leak Type Other | Crack In Fitting |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 73 |
| Est Cost Prop Damage | 100 |
| Est Cost Emergency | 150 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 323 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Damage By Operator Or Operator's Contractor Not Related To Excavation And Not Due To Motorized Vehicle/equipment Damage |
| Operation Type | Damage By Operator Or Operator's Contractor Not Related To Excavation And Not Due To Motorized Vehicle/equipment Damage |
| Preparer Name | N*** J**** |
| Preparer Title | Dot Compliance Coordinator |
| Preparer Email | N*********@o****.com |
| Preparer Telephone | 580-395-6304 |
| Preparer Fax | 580-395-2933 |
| Prepared Date | 2014-02-19 00:00:00 |
| Authorizer Name | N*** J**** |
| Authorizer Telephone | 580-395-6304 |
| Authorizer Title | Dot Compliance Coordinator |
| Authorizer Email | N*********@o****.com |
| Narrative | At 19:15 on 4/09/2012, landowner called oneok pipeline control center in tulsa to report he could see vapors coming from oneok's pipe at the binger jct. #2 location. Field reps were contacted and dispacthed to site. Field rep arrived on site at approximately 19:35 and determined tattletale valve on scraper receiver trap was leaking. Scraper barrel was isolated and blown down. Defective tattletale was replaced. 10/16/2013 - requested by PHMSA david eng to change "apparent cause" to g7 "-incorrect operation". Oneok's incident investigation determined the leak orginated in the threads at, or near the base of the tattletale fitting. It is unknown whether these threads were defective from the factory, damaged during installation of the fitting, or possibly damaged during shipping and installation of the trap to the pipeline during construction. Oneok inspected other traps that were installed with this type fitting during the same time period and found all to be in good working order. 2/19/2014 - the pig trap and tattletale valve were originally installed february of 2012. Nj |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA