Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2012-04-06 — TX
Operator
Ccps Transportation, Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2012-04-06 08:53
Report number
Location
TX
Narrative
On april 6 at approximately 08:53, the control room operator of line 55 received a scada alarm for the shelby station unit #2 pump. The station was bypassed and unit #2 was locked out. The controller dispatched the technician on call, who arrived on site at 10:00 and discovered oil surrounding the pump units, and approximately 20 barrels of oil contained within the station dike area. Further investigation by the station technician found that the pump seal on unit 2 had failed. The seal was replaced and the shelby station put back into service the following day. The contaminated soil has been removed and disposed of at an approved site.
Detailed record list
Report Received Date
2012-05-03 00:00:00
Iyear
2012
Report Number
20120132
Supplemental Number
17826
Report Type
Supplemental Final
Operator Id
32080
Name
Ccps Transportation, Llc
Operator Street Address
915 N Eldridge Parkway, Suite 1100
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77079
Local Datetime
2012-04-06 08:53:00
Location Latitude
39.72708
Location Longitude
-92.04994
Commodity Released Type
Crude Oil
Unintentional Release Bbls
20
Intentional Release Bbls
0
Recovered Bbls
20
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2012-04-06 08:53:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-04-06 08:53:00
Restart Datetime
2012-04-07 19:30:00
On Site Datetime
2012-04-06 10:00:00
Nrc Rpt Datetime
2012-04-06 12:43:00
Nrc Rpt Num
1007966
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Line 55
Segment Name
Shelby Station
Onshore State Abbreviation
Mo
Onshore Postal Code
63468
Onshore City Name
Shelbina
Onshore County Name
Shelby
Designated Location
Milepost/valve Station
Designated Name
Mp 278.39
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Installation Year
2009
Material Involved
Material Other Than Carbon Steel
Material Details
Pump Seal
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
2000
Est Cost Prop Damage
0
Est Cost Emergency
152500
Est Cost Environmental
332000
Est Cost Other
0
Prpty
486500
Accident Psig
900
Mop Psig
920
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Controller Ind
Yes
Invest Other Ind
Yes
Invest Other Ind Details
Investigation Recommended A Procedure Review On Leak Triggers
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Pump Seal Failure
Preparer Name
S**** S****
Preparer Title
Compliance Assistant
Preparer Email
S**********@e*******.com
Preparer Telephone
218-464-5754
Preparer Fax
218-464-5991
Prepared Date
2013-04-05 00:00:00
Authorizer Name
D**** S*******
Authorizer Telephone
218-464-5751
Authorizer Title
Manager Us Pipeline Compliance
Authorizer Email
D*************@e*******.com
Narrative
On april 6 at approximately 08:53, the control room operator of line 55 received a scada alarm for the shelby station unit #2 pump. The station was bypassed and unit #2 was locked out. The controller dispatched the technician on call, who arrived on site at 10:00 and discovered oil surrounding the pump units, and approximately 20 barrels of oil contained within the station dike area. Further investigation by the station technician found that the pump seal on unit 2 had failed. The seal was replaced and the shelby station put back into service the following day. The contaminated soil has been removed and disposed of at an approved site.
| Report Received Date | 2012-05-03 00:00:00 |
|---|---|
| Iyear | 2012 |
| Report Number | 20120132 |
| Supplemental Number | 17826 |
| Report Type | Supplemental Final |
| Operator Id | 32080 PHMSA Enforcement |
| Name | Ccps Transportation, Llc |
| Operator Street Address | 915 N Eldridge Parkway, Suite 1100 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77079 |
| Local Datetime | 2012-04-06 08:53:00 |
| Location Latitude | 39.72708 Google Maps OpenStreetMap |
| Location Longitude | -92.04994 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 20 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 20 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2012-04-06 08:53:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2012-04-06 08:53:00 |
| Restart Datetime | 2012-04-07 19:30:00 |
| On Site Datetime | 2012-04-06 10:00:00 |
| Nrc Rpt Datetime | 2012-04-06 12:43:00 |
| Nrc Rpt Num | 1007966 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Line 55 |
| Segment Name | Shelby Station |
| Onshore State Abbreviation | Mo |
| Onshore Postal Code | 63468 |
| Onshore City Name | Shelbina |
| Onshore County Name | Shelby |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 278.39 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pump |
| Installation Year | 2009 |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Pump Seal |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Drinking Ind | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 2000 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 152500 |
| Est Cost Environmental | 332000 |
| Est Cost Other | 0 |
| Prpty | 486500 |
| Accident Psig | 900 |
| Mop Psig | 920 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Controller Ind | Yes |
| Invest Other Ind | Yes |
| Invest Other Ind Details | Investigation Recommended A Procedure Review On Leak Triggers |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Pump Or Pump-Related Equipment |
| Eq Failure Type | Pump Or Pump-Related Equipment |
| Other Pump Ind | Seal/packing Failure |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Pump Seal Failure |
| Preparer Name | S**** S**** |
| Preparer Title | Compliance Assistant |
| Preparer Email | S**********@e*******.com |
| Preparer Telephone | 218-464-5754 |
| Preparer Fax | 218-464-5991 |
| Prepared Date | 2013-04-05 00:00:00 |
| Authorizer Name | D**** S******* |
| Authorizer Telephone | 218-464-5751 |
| Authorizer Title | Manager Us Pipeline Compliance |
| Authorizer Email | D*************@e*******.com |
| Narrative | On april 6 at approximately 08:53, the control room operator of line 55 received a scada alarm for the shelby station unit #2 pump. The station was bypassed and unit #2 was locked out. The controller dispatched the technician on call, who arrived on site at 10:00 and discovered oil surrounding the pump units, and approximately 20 barrels of oil contained within the station dike area. Further investigation by the station technician found that the pump seal on unit 2 had failed. The seal was replaced and the shelby station put back into service the following day. The contaminated soil has been removed and disposed of at an approved site. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA