GTG incident on 2012-10-21 — TX

Operator
Sea Robin Pipeline Co
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$475,000
Incident datetime
2012-10-21 15:40
Report number
Location
TX
Narrative
** the reason for this supplemental report is to correct the lat. And long. Coordinants previously submitted in the original/final report. **this report is being submitted in response to PHMSA's request, (docket id PHMSA-2013-0028), for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents.** this supplemental report is to acknowledge that the two relevant sections in PHMSA's request have been reviewed and no further actions were needed.
Detailed record list
Report Received Date
2012-11-20 00:00:00
Iyear
2012
Report Number
20120116
Supplemental Number
16026
Report Type
Supplemental Final
Operator Id
Name
Sea Robin Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2012-10-21 15:30:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2012-10-21 15:30:00
Commodity Released Type
Natural Gas
Unintentional Release
3286
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-10-21 16:09:00
Restart Datetime
2012-11-01 17:43:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2012-10-21 15:40:00
On Site Datetime
2012-10-22 08:30:00
On Off Shore
Offshore
Off Water Depth
164
Off Accident Origin
On The Outer Continental Shelf (Ocs)
Off Ocs Area
East Cameron
Off Ocs Block
265
Off Area Accident Type
Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type
Interstate
System Part Involved
Offshore Pipeline, Including Riser And Riser Bend
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12.75
Pipe Wall Thickness
0.5
Pipe Smys
52000
Pipe Specification
Api 5l Grade B
Pipe Seam Type
Seamless
Pipe Manufacturer
Jones & Laughlin
Pipe Coating Type
Other
Pipe Coating Details
Mastic And Concrete
Installation Year
1970
Manufactured Year
1970
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
276
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
3600
Est Cost Intentional Release
0
Est Cost Prop Damage
475000
Est Cost Emergency
5000
Est Cost Other
0
Prpty
483600
Accident Psig
925
Mop Psig
984
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Check Valve
Length Segment Isolated
4171
Internal Inspection Ind
No
Diameter Change Ind
Yes
Unsuitable Mainline Ind
Yes
Tight Mitered Ind
Yes
Other Restrictions Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Accident Identifier
Other
Accident Details
Producer Platform Employee Identified Leak.
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Due to the location and kind of failure it appears to be caused by an internal defect. Controllers actions have no effect on this event.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Other
Int Visual Exam Details
Pin-Hole Leak At The 6 O'clock Position.
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
Low Flow On Dead-End Lateral.
Int Other Basis Ind
Yes
Int Corrosion Basis Details
Historical Data
Int Other Loc Ind
Yes
Corrosion Location Details
Dead-End Leg Of Sub-Sea Lateral
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2009
Hydrtst Most Rcnt Pressure
1941
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
N***** H******
Preparer Title
Director Interstate Regulatory Compliance
Preparer Email
N*************@e*************.com
Preparer Telephone
713-857-5479
Authorizer Name
N***** H******
Authorizer Title
Director Interstate Regulatory Compliance
Authorizer Telephone
713-857-5479
Authorizer Email
N*************@e*************.com
Narrative
** the reason for this supplemental report is to correct the lat. And long. Coordinants previously submitted in the original/final report. **this report is being submitted in response to PHMSA's request, (docket id PHMSA-2013-0028), for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents.** this supplemental report is to acknowledge that the two relevant sections in PHMSA's request have been reviewed and no further actions were needed.
Report Received Date 2012-11-20 00:00:00
Iyear 2012
Report Number 20120116
Supplemental Number 16026
Report Type Supplemental Final
Operator Id 18152 PHMSA Enforcement
Name Sea Robin Pipeline Co
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2012-10-21 15:30:00
Location Latitude 28.2605 Google Maps OpenStreetMap
Location Longitude -92.5241 Google Maps OpenStreetMap
Nrc Rpt Num 1027955 NRC Report How to search
Nrc Rpt Datetime 2012-10-21 15:30:00
Commodity Released Type Natural Gas
Unintentional Release 3286
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2012-10-21 16:09:00
Restart Datetime 2012-11-01 17:43:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2012-10-21 15:40:00
On Site Datetime 2012-10-22 08:30:00
On Off Shore Offshore
Off Water Depth 164
Off Accident Origin On The Outer Continental Shelf (Ocs)
Off Ocs Area East Cameron
Off Ocs Block 265
Off Area Accident Type Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type Interstate
System Part Involved Offshore Pipeline, Including Riser And Riser Bend
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12.75
Pipe Wall Thickness 0.5
Pipe Smys 52000
Pipe Specification Api 5l Grade B
Pipe Seam Type Seamless
Pipe Manufacturer Jones & Laughlin
Pipe Coating Type Other
Pipe Coating Details Mastic And Concrete
Installation Year 1970
Manufactured Year 1970
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 276
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 3600
Est Cost Intentional Release 0
Est Cost Prop Damage 475000
Est Cost Emergency 5000
Est Cost Other 0
Prpty 483600
Accident Psig 925
Mop Psig 984
Mop Cfr Section Not On Omb-Approved Form When Submitted View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Check Valve
Length Segment Isolated 4171
Internal Inspection Ind No
Diameter Change Ind Yes
Unsuitable Mainline Ind Yes
Tight Mitered Ind Yes
Other Restrictions Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Accident Identifier Other
Accident Details Producer Platform Employee Identified Leak.
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Due to the location and kind of failure it appears to be caused by an internal defect. Controllers actions have no effect on this event.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Other
Int Visual Exam Details Pin-Hole Leak At The 6 O'clock Position.
Int Other Corrosion Ind Yes
Int Corrosion Type Details Low Flow On Dead-End Lateral.
Int Other Basis Ind Yes
Int Corrosion Basis Details Historical Data
Int Other Loc Ind Yes
Corrosion Location Details Dead-End Leg Of Sub-Sea Lateral
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering No
Corrosion Coupons No
Collected Data Ind No
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 2009
Hydrtst Most Rcnt Pressure 1941
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name N***** H******
Preparer Title Director Interstate Regulatory Compliance
Preparer Email N*************@e*************.com
Preparer Telephone 713-857-5479
Authorizer Name N***** H******
Authorizer Title Director Interstate Regulatory Compliance
Authorizer Telephone 713-857-5479
Authorizer Email N*************@e*************.com
Narrative ** the reason for this supplemental report is to correct the lat. And long. Coordinants previously submitted in the original/final report. **this report is being submitted in response to PHMSA's request, (docket id PHMSA-2013-0028), for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents.** this supplemental report is to acknowledge that the two relevant sections in PHMSA's request have been reviewed and no further actions were needed.