GTG incident on 2012-04-25 — NE

Operator
Northern Natural Gas Co
Cause
Notification Issue
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 2 injuries
Property damage (nominal)
$218,190
Incident datetime
2012-04-25 13:58
Report number
Location
NE
Narrative
On april 25, 2012, northern natural gas' 24-inch-diameter south sioux city-to-paulina m560c mainline (c-line) was damaged during the installation of farm drainage tile in a field in plymouth county near hinton, iowa. The tiling work was being performed by derocher construction headquartered in le mars, iowa, on behalf of randy riediger of hinton, iowa, the farm tenant. The damaged c-line ruptured and the escaping gas ignited. Two tiling workers were treated for injuries at a sioux city hospital but their injuries are not believed to be life threatening. No one call request was placed for the tiling operation. Repairs to the c-line and inspection of the nearby 16-inch-diameter south sioux city-to-paulina b-line were completed april 27, 2012. No customers lost service due to the line hit or the subsequent investigation and repairs. Facility planning estimates the total gas lost as a result of this incident to be 57.576 mmcf. The iowa attorney general office contacted northern natural gas immediately following the incident and has opened an investigation into the one call violation. Supplemental/final report for report no. 20120049-15515 dated 05/14/2012. Updated information in part a, section 11, part d, section 7 with estimated final total cost. Approximately 102 feet of new 24-inch-diameter tested pipe was replaced. The legal department of northern natural gas company is following up with seeking reimbursement for cost incurred from the incident. Supplemental/final update to report # 20120049-15648 - in section c, item 6 where a mechanical punture was indicated, although there extensive damage to the pipe, the size of the punture is estimated as 10 inches axial by a circumferential size of 18-inches. Supplemental/final: report # 20120049, dated 5/14/2012 - updated part d item 7a, part g3 item 10 to trencher and item 16. The two tiling workers injuries: one incurred 1st degree burns on his back and the other incurred 1st and 2nd degree burns on his back.
Detailed record list
Report Received Date
2012-05-14 00:00:00
Iyear
2012
Report Number
20120049
Supplemental Number
16732
Report Type
Supplemental Final
Operator Id
Name
Northern Natural Gas Co
Operator Street Address
1111 South 103rd Street
Operator City Name
Omaha
Operator State Abbreviation
NE
Operator Postal Code
68124
Local Datetime
2012-04-25 13:45:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2012-04-25 15:37:00
Commodity Released Type
Natural Gas
Unintentional Release
46285
Intentional Release
12460
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
0
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
2
Num Gp Injuries
0
Injure
2
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-04-25 15:02:00
Restart Datetime
2012-04-27 19:27:00
Ignite Ind
Yes
Explode Ind
Yes
Num Pub Evacuated
0
Incident Identified Datetime
2012-04-25 13:58:00
On Site Datetime
2012-04-25 14:10:00
On Off Shore
Onshore
Onshore State Abbreviation
Ia
Onshore Postal Code
51024-8541
Onshore City Name
Hinton
Onshore County Name
Plymouth
Designated Location
Milepost
Designated Name
20.29
Pipe Fac Name
Iam60802-M560c South Sioux City To Paullina C-Line
Segment Name
M560c
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
54
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
24
Pipe Wall Thickness
0.281
Pipe Smys
52000
Pipe Specification
5lx
Pipe Seam Type
Flash Welded
Pipe Manufacturer
A.o.smith
Pipe Coating Type
Coal Tar
Installation Year
1957
Manufactured Year
1957
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
10
Puncture Circum
18
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
468
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
43000
Est Cost Unintentional Release
100486
Est Cost Intentional Release
27051
Est Cost Prop Damage
218190
Est Cost Emergency
83546
Est Cost Other
0
Prpty
472273
Accident Psig
763
Mop Psig
800
Mop Cfr Section
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
40128
Internal Inspection Ind
No
Unsuitable Mainline Ind
Yes
Operation Complications Ind
Yes
Other Complications Ind
Yes
Inspect Comp Details
Missing 3-Mile Segment
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
No
Private Row Ind
Yes
Private Subtype
Private Landowner
Excavator Type
Contractor
Excavator Equipment
Trencher
Work Performed
Drainage
One Call Notified Ind
No
Locator Type
Unknown/other
Visible Marks
Unknown/other
Service Interruption
No
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
B**** W***
Preparer Title
Sr Pipeline Safety Specialist
Preparer Email
B*********@n****.com
Preparer Telephone
402-398-7396
Authorizer Name
T***** C******
Authorizer Title
Sr. Director Pipeline Safety And Risk
Authorizer Telephone
402-398-7715
Authorizer Email
T*************@n****.com
Narrative
On april 25, 2012, northern natural gas' 24-inch-diameter south sioux city-to-paulina m560c mainline (c-line) was damaged during the installation of farm drainage tile in a field in plymouth county near hinton, iowa. The tiling work was being performed by derocher construction headquartered in le mars, iowa, on behalf of randy riediger of hinton, iowa, the farm tenant. The damaged c-line ruptured and the escaping gas ignited. Two tiling workers were treated for injuries at a sioux city hospital but their injuries are not believed to be life threatening. No one call request was placed for the tiling operation. Repairs to the c-line and inspection of the nearby 16-inch-diameter south sioux city-to-paulina b-line were completed april 27, 2012. No customers lost service due to the line hit or the subsequent investigation and repairs. Facility planning estimates the total gas lost as a result of this incident to be 57.576 mmcf. The iowa attorney general office contacted northern natural gas immediately following the incident and has opened an investigation into the one call violation. Supplemental/final report for report no. 20120049-15515 dated 05/14/2012. Updated information in part a, section 11, part d, section 7 with estimated final total cost. Approximately 102 feet of new 24-inch-diameter tested pipe was replaced. The legal department of northern natural gas company is following up with seeking reimbursement for cost incurred from the incident. Supplemental/final update to report # 20120049-15648 - in section c, item 6 where a mechanical punture was indicated, although there extensive damage to the pipe, the size of the punture is estimated as 10 inches axial by a circumferential size of 18-inches. Supplemental/final: report # 20120049, dated 5/14/2012 - updated part d item 7a, part g3 item 10 to trencher and item 16. The two tiling workers injuries: one incurred 1st degree burns on his back and the other incurred 1st and 2nd degree burns on his back.
Report Received Date 2012-05-14 00:00:00
Iyear 2012
Report Number 20120049
Supplemental Number 16732
Report Type Supplemental Final
Operator Id 13750 PHMSA Enforcement
Name Northern Natural Gas Co
Operator Street Address 1111 South 103rd Street
Operator City Name Omaha
Operator State Abbreviation NE
Operator Postal Code 68124
Local Datetime 2012-04-25 13:45:00
Location Latitude 42.59731 Google Maps OpenStreetMap
Location Longitude -96.12534 Google Maps OpenStreetMap
Nrc Rpt Num 1009666 NRC Report How to search
Nrc Rpt Datetime 2012-04-25 15:37:00
Commodity Released Type Natural Gas
Unintentional Release 46285
Intentional Release 12460
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 0
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 2
Num Gp Injuries 0
Injure 2
Shutdown Due Accident Ind Yes
Shutdown Datetime 2012-04-25 15:02:00
Restart Datetime 2012-04-27 19:27:00
Ignite Ind Yes
Explode Ind Yes
Num Pub Evacuated 0
Incident Identified Datetime 2012-04-25 13:58:00
On Site Datetime 2012-04-25 14:10:00
On Off Shore Onshore
Onshore State Abbreviation Ia
Onshore Postal Code 51024-8541
Onshore City Name Hinton
Onshore County Name Plymouth
Designated Location Milepost
Designated Name 20.29
Pipe Fac Name Iam60802-M560c South Sioux City To Paullina C-Line
Segment Name M560c
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 54
Crossing No
Pipe Facility Type Interstate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 24
Pipe Wall Thickness 0.281
Pipe Smys 52000
Pipe Specification 5lx
Pipe Seam Type Flash Welded
Pipe Manufacturer A.o.smith
Pipe Coating Type Coal Tar
Installation Year 1957
Manufactured Year 1957
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 10
Puncture Circum 18
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 468
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 43000
Est Cost Unintentional Release 100486
Est Cost Intentional Release 27051
Est Cost Prop Damage 218190
Est Cost Emergency 83546
Est Cost Other 0
Prpty 472273
Accident Psig 763
Mop Psig 800
Mop Cfr Section 192.619(C) View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 40128
Internal Inspection Ind No
Unsuitable Mainline Ind Yes
Operation Complications Ind Yes
Other Complications Ind Yes
Inspect Comp Details Missing 3-Mile Segment
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Accident Identifier Air Patrol
Operator Type Contractor Working For The Operator
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt No
Private Row Ind Yes
Private Subtype Private Landowner
Excavator Type Contractor
Excavator Equipment Trencher
Work Performed Drainage
One Call Notified Ind No
Locator Type Unknown/other
Visible Marks Unknown/other
Service Interruption No
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name B**** W***
Preparer Title Sr Pipeline Safety Specialist
Preparer Email B*********@n****.com
Preparer Telephone 402-398-7396
Authorizer Name T***** C******
Authorizer Title Sr. Director Pipeline Safety And Risk
Authorizer Telephone 402-398-7715
Authorizer Email T*************@n****.com
Narrative On april 25, 2012, northern natural gas' 24-inch-diameter south sioux city-to-paulina m560c mainline (c-line) was damaged during the installation of farm drainage tile in a field in plymouth county near hinton, iowa. The tiling work was being performed by derocher construction headquartered in le mars, iowa, on behalf of randy riediger of hinton, iowa, the farm tenant. The damaged c-line ruptured and the escaping gas ignited. Two tiling workers were treated for injuries at a sioux city hospital but their injuries are not believed to be life threatening. No one call request was placed for the tiling operation. Repairs to the c-line and inspection of the nearby 16-inch-diameter south sioux city-to-paulina b-line were completed april 27, 2012. No customers lost service due to the line hit or the subsequent investigation and repairs. Facility planning estimates the total gas lost as a result of this incident to be 57.576 mmcf. The iowa attorney general office contacted northern natural gas immediately following the incident and has opened an investigation into the one call violation. Supplemental/final report for report no. 20120049-15515 dated 05/14/2012. Updated information in part a, section 11, part d, section 7 with estimated final total cost. Approximately 102 feet of new 24-inch-diameter tested pipe was replaced. The legal department of northern natural gas company is following up with seeking reimbursement for cost incurred from the incident. Supplemental/final update to report # 20120049-15648 - in section c, item 6 where a mechanical punture was indicated, although there extensive damage to the pipe, the size of the punture is estimated as 10 inches axial by a circumferential size of 18-inches. Supplemental/final: report # 20120049, dated 5/14/2012 - updated part d item 7a, part g3 item 10 to trencher and item 16. The two tiling workers injuries: one incurred 1st degree burns on his back and the other incurred 1st and 2nd degree burns on his back.

All rights reserved. Copyright © by ClearPHMSA