GTG incident on 2012-03-23 — TX

Operator
Tennessee Gas Pipeline Co (El Paso)
Cause
Material Failure Of Pipe Or Weld
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,114,825
Incident datetime
2012-03-23 15:45
Report number
Location
TX
Narrative
Anr pipeline company personnel notified tennessee gas pipeline (tgp) personnel of a sheen measuring 3 miles long and 1/4 mile wide in the vicinity of tgp's 24" 523m-3700 pipeline on the ocs in eugene island block 241. Tgp investigated and observed the sheen with bubbles. Dispatched divers determined that tgp's line was leaking through a pinhole in a girth weld. The leak was repaired by installing a clamp and the pipeline was placed back into service. Year of pipe manufacture is assumed to be commensurate with year of installation
Detailed record list
Report Received Date
2012-04-12 00:00:00
Iyear
2012
Report Number
20120037
Supplemental Number
16137
Report Type
Supplemental Final
Operator Id
Name
Tennessee Gas Pipeline Co (El Paso)
Operator Street Address
1001 Louisiana St
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2012-03-23 15:45:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2012-03-23 16:45:00
Commodity Released Type
Natural Gas
Unintentional Release
413
Intentional Release
4980
Accompanying Liquid
50
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2012-03-23 17:18:00
Restart Datetime
2012-04-07 16:45:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2012-03-23 15:45:00
On Site Datetime
2012-03-24 11:24:00
On Off Shore
Offshore
Off Water Depth
150
Off Accident Origin
On The Outer Continental Shelf (Ocs)
Off Ocs Area
Eugene Island
Off Ocs Block
241
Off Area Accident Type
Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type
Interstate
System Part Involved
Offshore Pipeline, Including Riser And Riser Bend
Item Involved
Weld/fusion, Including Heat-Affected Zone
Pipe Diameter
24
Pipe Wall Thickness
0.438
Pipe Smys
60000
Pipe Specification
Api 5lx
Pipe Seam Type
Dsaw
Pipe Manufacturer
Us Steel
Pipe Coating Type
Coal Tar
Weld Subtype
Pipe Girth Weld
Installation Year
1975
Manufactured Year
1975
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
585
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
826
Est Cost Intentional Release
9960
Est Cost Prop Damage
1114825
Est Cost Emergency
50000
Est Cost Other
0
Prpty
1175611
Accident Psig
914
Mop Psig
1250
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
25872
Internal Inspection Ind
No
Diameter Change Ind
Yes
Operation Complications Ind
Yes
Low Flow Ind
Yes
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Another Pipeline Operator's Local Personnel
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pressures were within normal operating ranges; no abnormal excursions.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Pwjf Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind
Yes
Other Factor
Yes
Other Factor Details
Weld Defect During Original Construction.
Additional Lack Fusion Ind
Yes
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
Z****** R*****
Preparer Title
Engineer - Pipeline
Preparer Email
Z*************@k***********.com
Preparer Telephone
7134206633
Preparer Fax
7134206633
Authorizer Name
Z****** R*****
Authorizer Title
Engineer - Pipeline
Authorizer Telephone
7134206633
Authorizer Email
Z*************@k***********.com
Narrative
Anr pipeline company personnel notified tennessee gas pipeline (tgp) personnel of a sheen measuring 3 miles long and 1/4 mile wide in the vicinity of tgp's 24" 523m-3700 pipeline on the ocs in eugene island block 241. Tgp investigated and observed the sheen with bubbles. Dispatched divers determined that tgp's line was leaking through a pinhole in a girth weld. The leak was repaired by installing a clamp and the pipeline was placed back into service. Year of pipe manufacture is assumed to be commensurate with year of installation
Report Received Date 2012-04-12 00:00:00
Iyear 2012
Report Number 20120037
Supplemental Number 16137
Report Type Supplemental Final
Operator Id 19160 PHMSA Enforcement
Name Tennessee Gas Pipeline Co (El Paso)
Operator Street Address 1001 Louisiana St
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2012-03-23 15:45:00
Location Latitude 28.53833 Google Maps OpenStreetMap
Location Longitude -91.665 Google Maps OpenStreetMap
Nrc Rpt Num 1006716 NRC Report How to search
Nrc Rpt Datetime 2012-03-23 16:45:00
Commodity Released Type Natural Gas
Unintentional Release 413
Intentional Release 4980
Accompanying Liquid 50
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2012-03-23 17:18:00
Restart Datetime 2012-04-07 16:45:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2012-03-23 15:45:00
On Site Datetime 2012-03-24 11:24:00
On Off Shore Offshore
Off Water Depth 150
Off Accident Origin On The Outer Continental Shelf (Ocs)
Off Ocs Area Eugene Island
Off Ocs Block 241
Off Area Accident Type Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type Interstate
System Part Involved Offshore Pipeline, Including Riser And Riser Bend
Item Involved Weld/fusion, Including Heat-Affected Zone
Pipe Diameter 24
Pipe Wall Thickness 0.438
Pipe Smys 60000
Pipe Specification Api 5lx
Pipe Seam Type Dsaw
Pipe Manufacturer Us Steel
Pipe Coating Type Coal Tar
Weld Subtype Pipe Girth Weld
Installation Year 1975
Manufactured Year 1975
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 585
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 826
Est Cost Intentional Release 9960
Est Cost Prop Damage 1114825
Est Cost Emergency 50000
Est Cost Other 0
Prpty 1175611
Accident Psig 914
Mop Psig 1250
Mop Cfr Section Not On Omb-Approved Form When Submitted View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 25872
Internal Inspection Ind No
Diameter Change Ind Yes
Operation Complications Ind Yes
Low Flow Ind Yes
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Other
Accident Details Another Pipeline Operator's Local Personnel
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pressures were within normal operating ranges; no abnormal excursions.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Design-, Construction-, Installation-, Or Fabrication-Related
Pwjf Failure Type Design-, Construction-, Installation-, Or Fabrication-Related
Field Exam Ind Yes
Other Factor Yes
Other Factor Details Weld Defect During Original Construction.
Additional Lack Fusion Ind Yes
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name Z****** R*****
Preparer Title Engineer - Pipeline
Preparer Email Z*************@k***********.com
Preparer Telephone 7134206633
Preparer Fax 7134206633
Authorizer Name Z****** R*****
Authorizer Title Engineer - Pipeline
Authorizer Telephone 7134206633
Authorizer Email Z*************@k***********.com
Narrative Anr pipeline company personnel notified tennessee gas pipeline (tgp) personnel of a sheen measuring 3 miles long and 1/4 mile wide in the vicinity of tgp's 24" 523m-3700 pipeline on the ocs in eugene island block 241. Tgp investigated and observed the sheen with bubbles. Dispatched divers determined that tgp's line was leaking through a pinhole in a girth weld. The leak was repaired by installing a clamp and the pipeline was placed back into service. Year of pipe manufacture is assumed to be commensurate with year of installation

All rights reserved. Copyright © by ClearPHMSA