HL incident on 2011-08-19 — TX

Operator
Exxonmobil Pipeline Co
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$56,000
Incident datetime
2011-08-19 09:44
Report number
Location
TX
Narrative
An estimated 18.7 bbls. Of crude oil was released to soil from a pipe 'jump-over' connection at the belle rose valve site. The release was discovered and reported to empco representatives by a vegetation control contractor on 8/19/11 at approximately 9:45am. Both the south louisiana and north pipeline systems which traverse the belle rose site were immediately shut down and emergency response personnel and equipment were mobilized to the site. Agency notifications were made (nrc and la state police). The majority of the crude oil release was contained within empco property. However, stained soil was discovered along a 20 ft. Length of dry irrigation ditch which is parallel and approximately 3 ft. From the empco pipeline station property line. The unmanned belle rose site contains block valves and piping which join the parallel south louisiana and north pipeline systems. No recent work or abnormal conditions had occurred at the site or on either pipeline system. A weekly walk-around site inspection was performed on 08/17/11 at 4:30 pm and an aerial over-flight inspection (and connecting row) was performed on 08/18/11 (approximately noon). Neither site inspection indicated any evidence of the release. Suspected internal corrosion in the bottom quadrant of the 12' dia. (0.406' w.T., gr. X42, smls) northern pipe jump-over was the source of the release. The jump-over piping was installed in 1994 for pipeline system flow reliability by providing an alternative parallel flow path in the event of a pipeline system failure on either pipeline section. The two pipeline system were segregated in 2003. The pipeline jump over was permanently removed. Similar jump overs on the pipeline system, are being drained and isolated, or have been but on a schedule to induce flow through the pipeline section to prevent the no flow condition.
Detailed record list
Report Received Date
2011-09-16 00:00:00
Iyear
2011
Report Number
20110461
Supplemental Number
19254
Report Type
Supplemental Final
Operator Id
Name
Exxonmobil Pipeline Co
Operator Street Address
22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name
Spring
Operator State Abbreviation
TX
Operator Postal Code
77389
Local Datetime
2011-08-19 09:44:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
18.7
Intentional Release Bbls
0
Recovered Bbls
11.2
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2011-08-19 09:44:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-08-19 09:44:00
Restart Datetime
2011-08-20 19:15:00
On Site Datetime
2011-08-19 09:44:00
Nrc Rpt Datetime
2011-08-19 10:50:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Raceland Anchorage System
Segment Name
Raceland Anchorage System/c917371
Onshore State Abbreviation
La
Onshore Postal Code
70346
Onshore City Name
Donaldsonville
Onshore County Name
Assumption
Designated Location
Milepost/valve Station
Designated Name
Belle Rose St
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
30
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12
Pipe Wall Thickness
0.406
Pipe Smys
42000
Pipe Specification
X 42, 54 Lb/ft
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Installation Year
1994
Manufactured Year
1994
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
617
Est Cost Prop Damage
56000
Est Cost Emergency
131000
Est Cost Environmental
50000
Est Cost Other
4000
Est Cost Other Details
Additional Incidental Cost
Prpty
241617
Accident Psig
375
Mop Psig
1120
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
8
Internal Inspection Ind
No
Tight Mitered Ind
Yes
Other Restrictions Ind
Yes
Other Inspection Ind
Yes
Internal Inspection Details
Jump-Over Between To Pipelines.
Operation Complications Ind
Yes
Other Complications Ind
Yes
Inspect Comp Details
Jump-Over Between Pipelines
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The incident was not a result of the controller starting or stoping the system.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
General Corrosion
Int Water Acid Ind
Yes
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K***** L Y****
Preparer Title
Pipeline Safety Compliance Advisor
Preparer Email
K*************@e*********.com
Preparer Telephone
225-324-3055
Preparer Fax
337-662-5950
Prepared Date
2014-04-15 00:00:00
Authorizer Name
M*** D W******
Authorizer Telephone
713-656-0227
Authorizer Title
Sshe Manager
Authorizer Email
M*************@e*********.com
Narrative
An estimated 18.7 bbls. Of crude oil was released to soil from a pipe 'jump-over' connection at the belle rose valve site. The release was discovered and reported to empco representatives by a vegetation control contractor on 8/19/11 at approximately 9:45am. Both the south louisiana and north pipeline systems which traverse the belle rose site were immediately shut down and emergency response personnel and equipment were mobilized to the site. Agency notifications were made (nrc and la state police). The majority of the crude oil release was contained within empco property. However, stained soil was discovered along a 20 ft. Length of dry irrigation ditch which is parallel and approximately 3 ft. From the empco pipeline station property line. The unmanned belle rose site contains block valves and piping which join the parallel south louisiana and north pipeline systems. No recent work or abnormal conditions had occurred at the site or on either pipeline system. A weekly walk-around site inspection was performed on 08/17/11 at 4:30 pm and an aerial over-flight inspection (and connecting row) was performed on 08/18/11 (approximately noon). Neither site inspection indicated any evidence of the release. Suspected internal corrosion in the bottom quadrant of the 12' dia. (0.406' w.T., gr. X42, smls) northern pipe jump-over was the source of the release. The jump-over piping was installed in 1994 for pipeline system flow reliability by providing an alternative parallel flow path in the event of a pipeline system failure on either pipeline section. The two pipeline system were segregated in 2003. The pipeline jump over was permanently removed. Similar jump overs on the pipeline system, are being drained and isolated, or have been but on a schedule to induce flow through the pipeline section to prevent the no flow condition.
Report Received Date 2011-09-16 00:00:00
Iyear 2011
Report Number 20110461
Supplemental Number 19254
Report Type Supplemental Final
Operator Id 4906 PHMSA Enforcement
Name Exxonmobil Pipeline Co
Operator Street Address 22777 Springwoods Village Parkway E2.2b-Emp
Operator City Name Spring
Operator State Abbreviation TX
Operator Postal Code 77389
Local Datetime 2011-08-19 09:44:00
Location Latitude 30.055571 Google Maps OpenStreetMap
Location Longitude -91.062652 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 18.7
Intentional Release Bbls 0
Recovered Bbls 11.2
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2011-08-19 09:44:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-08-19 09:44:00
Restart Datetime 2011-08-20 19:15:00
On Site Datetime 2011-08-19 09:44:00
Nrc Rpt Datetime 2011-08-19 10:50:00
Nrc Rpt Num 986491 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Raceland Anchorage System
Segment Name Raceland Anchorage System/c917371
Onshore State Abbreviation La
Onshore Postal Code 70346
Onshore City Name Donaldsonville
Onshore County Name Assumption
Designated Location Milepost/valve Station
Designated Name Belle Rose St
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 30
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12
Pipe Wall Thickness 0.406
Pipe Smys 42000
Pipe Specification X 42, 54 Lb/ft
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Unknown
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Installation Year 1994
Manufactured Year 1994
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 617
Est Cost Prop Damage 56000
Est Cost Emergency 131000
Est Cost Environmental 50000
Est Cost Other 4000
Est Cost Other Details Additional Incidental Cost
Prpty 241617
Accident Psig 375
Mop Psig 1120
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 8
Internal Inspection Ind No
Tight Mitered Ind Yes
Other Restrictions Ind Yes
Other Inspection Ind Yes
Internal Inspection Details Jump-Over Between To Pipelines.
Operation Complications Ind Yes
Other Complications Ind Yes
Inspect Comp Details Jump-Over Between Pipelines
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details The incident was not a result of the controller starting or stoping the system.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results General Corrosion
Int Water Acid Ind Yes
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors No
Corrosion Lining No
Cleaning Dewatering Not Applicable - Not Mainline Pipe
Corrosion Coupons Not Applicable - Not Mainline Pipe
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name K***** L Y****
Preparer Title Pipeline Safety Compliance Advisor
Preparer Email K*************@e*********.com
Preparer Telephone 225-324-3055
Preparer Fax 337-662-5950
Prepared Date 2014-04-15 00:00:00
Authorizer Name M*** D W******
Authorizer Telephone 713-656-0227
Authorizer Title Sshe Manager
Authorizer Email M*************@e*********.com
Narrative An estimated 18.7 bbls. Of crude oil was released to soil from a pipe 'jump-over' connection at the belle rose valve site. The release was discovered and reported to empco representatives by a vegetation control contractor on 8/19/11 at approximately 9:45am. Both the south louisiana and north pipeline systems which traverse the belle rose site were immediately shut down and emergency response personnel and equipment were mobilized to the site. Agency notifications were made (nrc and la state police). The majority of the crude oil release was contained within empco property. However, stained soil was discovered along a 20 ft. Length of dry irrigation ditch which is parallel and approximately 3 ft. From the empco pipeline station property line. The unmanned belle rose site contains block valves and piping which join the parallel south louisiana and north pipeline systems. No recent work or abnormal conditions had occurred at the site or on either pipeline system. A weekly walk-around site inspection was performed on 08/17/11 at 4:30 pm and an aerial over-flight inspection (and connecting row) was performed on 08/18/11 (approximately noon). Neither site inspection indicated any evidence of the release. Suspected internal corrosion in the bottom quadrant of the 12' dia. (0.406' w.T., gr. X42, smls) northern pipe jump-over was the source of the release. The jump-over piping was installed in 1994 for pipeline system flow reliability by providing an alternative parallel flow path in the event of a pipeline system failure on either pipeline section. The two pipeline system were segregated in 2003. The pipeline jump over was permanently removed. Similar jump overs on the pipeline system, are being drained and isolated, or have been but on a schedule to induce flow through the pipeline section to prevent the no flow condition.