HL incident on 2011-12-01 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$50,000
Incident datetime
2011-12-01 03:12
Report number
Location
OK
Narrative
The lateral line from tank 3012 shifted due to excessive vibration during a slack line condition. The shift of the pipe caused a 1 inch nipple located on the bottom of the pipe to come in contact with a concrete pipe support causing the nipple to break off allowing product to be released into a drainage swale within the terminal facility. Product was contained in the drainage swale and did not leave the facility. Metalurgical analysis and a hydraulic study were completed on the pipe segment and sent to PHMSA.
Detailed record list
Report Received Date
2011-12-29 00:00:00
Iyear
2011
Report Number
20110460
Supplemental Number
17385
Report Type
Supplemental Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2011-11-30 06:49:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
1855
Intentional Release Bbls
0
Recovered Bbls
1855
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2011-12-01 03:12:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-12-01 03:15:00
Still Shutdown Ind
Yes
On Site Datetime
2011-12-01 03:12:00
Nrc Rpt Datetime
2011-12-01 10:10:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
East Houston
Segment Name
3012 Tank Line
Onshore State Abbreviation
Tx
Onshore Postal Code
77029
Onshore City Name
Houston
Onshore County Name
Harris
Designated Location
Milepost/valve Station
Designated Name
0
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Auxiliary Piping (E.g. Drain Lines)
Installation Year
2008
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
50000
Est Cost Emergency
26500
Est Cost Environmental
18500
Est Cost Other
30000
Est Cost Other Details
Analysis
Prpty
125000
Accident Psig
272
Mop Psig
275
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Cpm In Place Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Equipment Failure
Cause Details
Threaded Connection/coupling Failure
Eq Failure Type
Threaded Connection/coupling Failure
Other Stripped Ind
Threaded Fitting
Additional Vibration Ind
Yes
Preparer Name
D******* C*********
Preparer Email
D******************@m*********.com
Prepared Date
2013-03-07 00:00:00
Authorizer Name
D******* C*********
Authorizer Telephone
918-574-7386
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
D******************@m*********.com
Narrative
The lateral line from tank 3012 shifted due to excessive vibration during a slack line condition. The shift of the pipe caused a 1 inch nipple located on the bottom of the pipe to come in contact with a concrete pipe support causing the nipple to break off allowing product to be released into a drainage swale within the terminal facility. Product was contained in the drainage swale and did not leave the facility. Metalurgical analysis and a hydraulic study were completed on the pipe segment and sent to PHMSA.
Report Received Date 2011-12-29 00:00:00
Iyear 2011
Report Number 20110460
Supplemental Number 17385
Report Type Supplemental Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2011-11-30 06:49:00
Location Latitude 29.79428 Google Maps OpenStreetMap
Location Longitude -95.28162 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 1855
Intentional Release Bbls 0
Recovered Bbls 1855
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2011-12-01 03:12:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-12-01 03:15:00
Still Shutdown Ind Yes
On Site Datetime 2011-12-01 03:12:00
Nrc Rpt Datetime 2011-12-01 10:10:00
Nrc Rpt Num 996897 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name East Houston
Segment Name 3012 Tank Line
Onshore State Abbreviation Tx
Onshore Postal Code 77029
Onshore City Name Houston
Onshore County Name Harris
Designated Location Milepost/valve Station
Designated Name 0
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Auxiliary Piping (E.g. Drain Lines)
Installation Year 2008
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 50000
Est Cost Emergency 26500
Est Cost Environmental 18500
Est Cost Other 30000
Est Cost Other Details Analysis
Prpty 125000
Accident Psig 272
Mop Psig 275
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind Yes
Cpm In Place Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind Yes
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind Yes
Contractor Drug Test Ind No
Num Employees Tested 1
Num Employees Failed 0
Cause Equipment Failure
Cause Details Threaded Connection/coupling Failure
Eq Failure Type Threaded Connection/coupling Failure
Other Stripped Ind Threaded Fitting
Additional Vibration Ind Yes
Preparer Name D******* C*********
Preparer Email D******************@m*********.com
Prepared Date 2013-03-07 00:00:00
Authorizer Name D******* C*********
Authorizer Telephone 918-574-7386
Authorizer Title Sr. Compliance Coordinator
Authorizer Email D******************@m*********.com
Narrative The lateral line from tank 3012 shifted due to excessive vibration during a slack line condition. The shift of the pipe caused a 1 inch nipple located on the bottom of the pipe to come in contact with a concrete pipe support causing the nipple to break off allowing product to be released into a drainage swale within the terminal facility. Product was contained in the drainage swale and did not leave the facility. Metalurgical analysis and a hydraulic study were completed on the pipe segment and sent to PHMSA.