HL incident on 2011-11-16 — TX

Operator
Enterprise Crude Pipeline Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$37,731
Incident datetime
2011-11-16 11:20
Report number
Location
TX
Narrative
An enbridge employee notified enterprise of a leak on the 8-inch crude line located on enbridge property. The line was immediately shutdown and cleanup actions implemented. Sunoco was in the process of delivering 43,700 barrels of crude oil to the cushing east facility when the release was discovered. A hydroexcavator was used to expose the pipeline and locate the source of the leak. A temporary clamp was installed to ensure no additional product was leaked and until a plidco clamp could be located and installed. The delivery resumed after the plidco clamp was installed with pumping restricted to daylight operations only. The recommendation is that the existing delivery line from the sunoco meter bank to the leak site be pigged, purged, filled with nitrogen and abandoned in place; isolating the line to the west facility fabricate and install a new, above ground 8-inch line from the sunoco meter bank to the sunoco delivery manifold that supplies the enterprise east facility. All future sunoco deliveries will be received into the cushing east facility.
Detailed record list
Report Received Date
2011-12-09 00:00:00
Iyear
2011
Report Number
20110443
Supplemental Number
16738
Report Type
Supplemental Final
Operator Id
Name
Enterprise Crude Pipeline Llc
Operator Street Address
1100 Louisiana Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2011-11-16 11:20:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
140
Recovered Bbls
85
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Third Party That Caused The Accident
Incident Identified Datetime
2011-11-16 11:20:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-11-16 11:45:00
Still Shutdown Ind
Yes
On Site Datetime
2011-11-16 11:45:00
Nrc Rpt Datetime
2011-11-16 13:34:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Pipe Fac Name
C78
Segment Name
Cushing West (Koch) To Cushing East
Onshore State Abbreviation
Ok
Onshore Postal Code
74023
Onshore City Name
Cushing
Onshore County Name
Lincoln
Designated Location
Milepost/valve Station
Designated Name
Mp 08+80
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.28
Pipe Smys
24000
Pipe Specification
Unk
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unk/ Yr - Unk
Pipe Coating Type
Fusion Bonded Epoxy(Fbe)
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
5225
Est Cost Prop Damage
37731
Est Cost Emergency
10000
Est Cost Environmental
58695
Est Cost Other
0
Prpty
111651
Accident Psig
75
Mop Psig
150
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
2500
Internal Inspection Ind
No
Other Inspection Ind
Yes
Internal Inspection Details
Dead Leg On The Piping Where Corrosion Occured.
Operation Complications Ind
Yes
Low Flow Ind
Yes
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Microbiological Ind
Yes
Int Field Exam Basis Ind
Yes
Int Other Basis Ind
Yes
Int Corrosion Basis Details
Based On Past Experience With This Commodity And Dead Legs In Crude Service.
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1996
Hydrtst Most Rcnt Pressure
356
Preparer Name
C********** H****
Prepared Date
2012-07-02 00:00:00
Authorizer Name
C********** H****
Authorizer Telephone
713-381-6304
Authorizer Title
Pipeline Compliance Specialist
Authorizer Email
C******@e****.com
Narrative
An enbridge employee notified enterprise of a leak on the 8-inch crude line located on enbridge property. The line was immediately shutdown and cleanup actions implemented. Sunoco was in the process of delivering 43,700 barrels of crude oil to the cushing east facility when the release was discovered. A hydroexcavator was used to expose the pipeline and locate the source of the leak. A temporary clamp was installed to ensure no additional product was leaked and until a plidco clamp could be located and installed. The delivery resumed after the plidco clamp was installed with pumping restricted to daylight operations only. The recommendation is that the existing delivery line from the sunoco meter bank to the leak site be pigged, purged, filled with nitrogen and abandoned in place; isolating the line to the west facility fabricate and install a new, above ground 8-inch line from the sunoco meter bank to the sunoco delivery manifold that supplies the enterprise east facility. All future sunoco deliveries will be received into the cushing east facility.
Report Received Date 2011-12-09 00:00:00
Iyear 2011
Report Number 20110443
Supplemental Number 16738
Report Type Supplemental Final
Operator Id 30829 PHMSA Enforcement
Name Enterprise Crude Pipeline Llc
Operator Street Address 1100 Louisiana Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2011-11-16 11:20:00
Location Latitude 35.94085 Google Maps OpenStreetMap
Location Longitude -96.7502 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 140
Recovered Bbls 85
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Notification From Third Party That Caused The Accident
Incident Identified Datetime 2011-11-16 11:20:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-11-16 11:45:00
Still Shutdown Ind Yes
On Site Datetime 2011-11-16 11:45:00
Nrc Rpt Datetime 2011-11-16 13:34:00
Nrc Rpt Num 995709 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Pipe Fac Name C78
Segment Name Cushing West (Koch) To Cushing East
Onshore State Abbreviation Ok
Onshore Postal Code 74023
Onshore City Name Cushing
Onshore County Name Lincoln
Designated Location Milepost/valve Station
Designated Name Mp 08+80
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8.625
Pipe Wall Thickness 0.28
Pipe Smys 24000
Pipe Specification Unk
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Unk/ Yr - Unk
Pipe Coating Type Fusion Bonded Epoxy(Fbe)
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 5225
Est Cost Prop Damage 37731
Est Cost Emergency 10000
Est Cost Environmental 58695
Est Cost Other 0
Prpty 111651
Accident Psig 75
Mop Psig 150
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 2500
Internal Inspection Ind No
Other Inspection Ind Yes
Internal Inspection Details Dead Leg On The Piping Where Corrosion Occured.
Operation Complications Ind Yes
Low Flow Ind Yes
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Not Cut Open
Int Microbiological Ind Yes
Int Field Exam Basis Ind Yes
Int Other Basis Ind Yes
Int Corrosion Basis Details Based On Past Experience With This Commodity And Dead Legs In Crude Service.
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors No
Collected Data Ind No
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1996
Hydrtst Most Rcnt Pressure 356
Preparer Name C********** H****
Prepared Date 2012-07-02 00:00:00
Authorizer Name C********** H****
Authorizer Telephone 713-381-6304
Authorizer Title Pipeline Compliance Specialist
Authorizer Email C******@e****.com
Narrative An enbridge employee notified enterprise of a leak on the 8-inch crude line located on enbridge property. The line was immediately shutdown and cleanup actions implemented. Sunoco was in the process of delivering 43,700 barrels of crude oil to the cushing east facility when the release was discovered. A hydroexcavator was used to expose the pipeline and locate the source of the leak. A temporary clamp was installed to ensure no additional product was leaked and until a plidco clamp could be located and installed. The delivery resumed after the plidco clamp was installed with pumping restricted to daylight operations only. The recommendation is that the existing delivery line from the sunoco meter bank to the leak site be pigged, purged, filled with nitrogen and abandoned in place; isolating the line to the west facility fabricate and install a new, above ground 8-inch line from the sunoco meter bank to the sunoco delivery manifold that supplies the enterprise east facility. All future sunoco deliveries will be received into the cushing east facility.

All rights reserved. Copyright © by ClearPHMSA