HL incident on 2011-10-11 — OK

Operator
Magellan Pipeline Company, Lp
Cause
Incorrect Operation
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2011-10-11 08:00
Report number
Location
OK
Narrative
A highway relocation project required rerouting two lines coming in the magellan "chicago" facility at franklin park, il. Product was being delivered into temporary tankage to drain up the lines so they could be relocated. A fitting on the temporary tank leaked, resulting in the release. The released product was promptly cleaned up and the impacted area remediated in accordance with company and state requirements.
Detailed record list
Report Received Date
2011-11-10 00:00:00
Iyear
2011
Report Number
20110416
Supplemental Number
17432
Report Type
Supplemental Final
Operator Id
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2011-10-11 08:00:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
5.95
Intentional Release Bbls
0
Recovered Bbls
5.95
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2011-10-11 08:00:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line Was Being Emptied To Re-Route It As Part Of A Road Relocation Project
On Site Datetime
2011-10-11 08:00:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Line Id 6167 * Line Id 6168
Segment Name
Chicago Terminal
Onshore State Abbreviation
Il
Onshore Postal Code
60131
Onshore City Name
Franklin Park
Onshore County Name
Cook
Designated Location
Survey Station No.
Designated Name
304+31
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Tank, Including Attached Appurtenances
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Fitting On Temporary Tank
Installation Year
2011
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Connection Failure
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
750
Est Cost Prop Damage
0
Est Cost Emergency
13000
Est Cost Environmental
0
Est Cost Other
0
Prpty
13750
Accident Psig
1.5
Mop Psig
3
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Line was being drained up for a construction project by local operations and the only data that could be monitored by the control center was a single flow which was not sufficient to monitor pipeline integrity. Operations control neither caused nor contributed to the release.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Other Ind
Yes
Operation Related Details
Improper Installation
Category Type
Construction
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
K****** L* L*******
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7246
Prepared Date
2013-03-07 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
K***********@m*********.com
Narrative
A highway relocation project required rerouting two lines coming in the magellan "chicago" facility at franklin park, il. Product was being delivered into temporary tankage to drain up the lines so they could be relocated. A fitting on the temporary tank leaked, resulting in the release. The released product was promptly cleaned up and the impacted area remediated in accordance with company and state requirements.
Report Received Date 2011-11-10 00:00:00
Iyear 2011
Report Number 20110416
Supplemental Number 17432
Report Type Supplemental Final
Operator Id 22610 PHMSA Enforcement
Name Magellan Pipeline Company, Lp
Operator Street Address 100 West 5th Street
Operator City Name Tulsa
Operator State Abbreviation OK
Operator Postal Code 74103
Local Datetime 2011-10-11 08:00:00
Location Latitude 41.93805 Google Maps OpenStreetMap
Location Longitude -87.89138 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 5.95
Intentional Release Bbls 0
Recovered Bbls 5.95
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Incident Identified Datetime 2011-10-11 08:00:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind No
Shutdown Explain Line Was Being Emptied To Re-Route It As Part Of A Road Relocation Project
On Site Datetime 2011-10-11 08:00:00
Ignite Ind No
Explode Ind No
Pipe Fac Name Line Id 6167 * Line Id 6168
Segment Name Chicago Terminal
Onshore State Abbreviation Il
Onshore Postal Code 60131
Onshore City Name Franklin Park
Onshore County Name Cook
Designated Location Survey Station No.
Designated Name 304+31
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Tank, Including Attached Appurtenances
Crossing No
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details Fitting On Temporary Tank
Installation Year 2011
Material Involved Carbon Steel
Release Type Leak
Leak Type Connection Failure
Wildlife Impact Ind No
Soil Contamination No
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca Yes
High Pop Ind Yes
High Pop Yes No Yes
Est Cost Oper Paid 0
Est Cost Gas Released 750
Est Cost Prop Damage 0
Est Cost Emergency 13000
Est Cost Environmental 0
Est Cost Other 0
Prpty 13750
Accident Psig 1.5
Mop Psig 3
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Line was being drained up for a construction project by local operations and the only data that could be monitored by the control center was a single flow which was not sufficient to monitor pipeline integrity. Operations control neither caused nor contributed to the release.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Equipment Not Installed Properly
Operation Type Equipment Not Installed Properly
Related Other Ind Yes
Operation Related Details Improper Installation
Category Type Construction
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name K****** L* L*******
Preparer Title Sr. Compliance Coordinator
Preparer Email K***********@m*********.com
Preparer Telephone 918-574-7315
Preparer Fax 918-574-7246
Prepared Date 2013-03-07 00:00:00
Authorizer Name K****** L* L*******
Authorizer Telephone 918-574-7315
Authorizer Title Sr. Compliance Coordinator
Authorizer Email K***********@m*********.com
Narrative A highway relocation project required rerouting two lines coming in the magellan "chicago" facility at franklin park, il. Product was being delivered into temporary tankage to drain up the lines so they could be relocated. A fitting on the temporary tank leaked, resulting in the release. The released product was promptly cleaned up and the impacted area remediated in accordance with company and state requirements.