HL incident on 2011-10-06 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Notification Issue
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$35,000
Incident datetime
2011-10-06 11:55
Report number
Location
OK
Narrative
At approximately 11:42 october 6, 2011 the scada system in magellan's operations control center indicted a sharp drop in pressure and an increase in flow rate on the #6-10" pipeline between topeka and kansas city. Magellan personnel executed a code red emergency shutdown of the line in accordance with magellan's o&m procedures and notified qualified field personnel to investigate. Subsequent investigation discovered that an excavating contractor had dented the line in several places and punctured it with a tooth of a front end loader while excavating a pond. The excavator did not place a one-call with the kansas one call agency. Magellan personnel immediately began controlling the released product and repaired the line with a segment of new, pretested pipe in accordance with PHMSA regulations and company procedures. The released product was recovered and 4708 cubic yards of effected soil were remediated per company and state requirements.
Detailed record list
Report Received Date
2011-11-04 00:00:00
Iyear
2011
Report Number
20110412
Supplemental Number
17121
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2011-10-06 11:42:00
Location Latitude
38.98759
Location Longitude
-95.32997
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
590
Intentional Release Bbls
0
Recovered Bbls
300
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2011-10-06 11:55:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-10-06 11:46:00
Restart Datetime
2011-10-07 15:12:00
On Site Datetime
2011-10-06 13:30:00
Nrc Rpt Datetime
2011-10-06 12:33:00
Nrc Rpt Num
991799
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Pipe Fac Name
#6-10" Topeka To Kansas City Line
Segment Name
Line Segment #6110
Onshore State Abbreviation
Ks
Onshore Postal Code
66049
Onshore City Name
Lawrence
Onshore County Name
Douglas
Designated Location
Survey Station No.
Designated Name
6552+02
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
33
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
10.75
Pipe Wall Thickness
0.203
Pipe Smys
46000
Pipe Specification
Api 5lx-46
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Youngstown Steel
Pipe Coating Type
Asphalt
Installation Year
1955
Manufactured Year
1955
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
3.5
Puncture Circum
2
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
62300
Est Cost Prop Damage
35000
Est Cost Emergency
50000
Est Cost Environmental
520541
Est Cost Other
0
Prpty
667841
Accident Psig
230
Mop Psig
1150
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
262704
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
The release was the result of a third party line strike by an excavator and did not stem from the operation of the line
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Landowner
Pipeline Easement Row Ind
Yes
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Agriculture
One Call Notified Ind
No
Locator Type
Unknown/other
Visible Marks
No
Service Interruption
Yes
Service Interruption Hours
27
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
K****** L* L*******
Preparer Title
Sr. Compliance Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7246
Prepared Date
2012-12-19 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Sr. Compliance Coordinator
Authorizer Email
K***********@m*********.com
Narrative
At approximately 11:42 october 6, 2011 the scada system in magellan's operations control center indicted a sharp drop in pressure and an increase in flow rate on the #6-10" pipeline between topeka and kansas city. Magellan personnel executed a code red emergency shutdown of the line in accordance with magellan's o&m procedures and notified qualified field personnel to investigate. Subsequent investigation discovered that an excavating contractor had dented the line in several places and punctured it with a tooth of a front end loader while excavating a pond. The excavator did not place a one-call with the kansas one call agency. Magellan personnel immediately began controlling the released product and repaired the line with a segment of new, pretested pipe in accordance with PHMSA regulations and company procedures. The released product was recovered and 4708 cubic yards of effected soil were remediated per company and state requirements.
| Report Received Date | 2011-11-04 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110412 |
| Supplemental Number | 17121 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2011-10-06 11:42:00 |
| Location Latitude | 38.98759 Google Maps OpenStreetMap |
| Location Longitude | -95.32997 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 590 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 300 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations) |
| Incident Identified Datetime | 2011-10-06 11:55:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2011-10-06 11:46:00 |
| Restart Datetime | 2011-10-07 15:12:00 |
| On Site Datetime | 2011-10-06 13:30:00 |
| Nrc Rpt Datetime | 2011-10-06 12:33:00 |
| Nrc Rpt Num | 991799 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Remotely Controlled |
| Pipe Fac Name | #6-10" Topeka To Kansas City Line |
| Segment Name | Line Segment #6110 |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 66049 |
| Onshore City Name | Lawrence |
| Onshore County Name | Douglas |
| Designated Location | Survey Station No. |
| Designated Name | 6552+02 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 33 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 10.75 |
| Pipe Wall Thickness | 0.203 |
| Pipe Smys | 46000 |
| Pipe Specification | Api 5lx-46 |
| Pipe Seam Type | Erw - Low Frequency |
| Pipe Manufacturer | Youngstown Steel |
| Pipe Coating Type | Asphalt |
| Installation Year | 1955 |
| Manufactured Year | 1955 |
| Material Involved | Carbon Steel |
| Release Type | Mechanical Puncture |
| Puncture Axial | 3.5 |
| Puncture Circum | 2 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 62300 |
| Est Cost Prop Damage | 35000 |
| Est Cost Emergency | 50000 |
| Est Cost Environmental | 520541 |
| Est Cost Other | 0 |
| Prpty | 667841 |
| Accident Psig | 230 |
| Mop Psig | 1150 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 262704 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | Yes |
| Scada Conf Ind | Yes |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | Yes |
| Cpm Conf Ind | Yes |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | The release was the result of a third party line strike by an excavator and did not stem from the operation of the line |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Excavation Damage |
| Cause Details | Excavation Damage By Third Party |
| Ex Party Type | Excavation Damage By Third Party |
| Prior Notification Ind | No |
| Notify Cga Dirt | Yes |
| Private Row Ind | Yes |
| Private Subtype | Private Landowner |
| Pipeline Easement Row Ind | Yes |
| Excavator Type | Contractor |
| Excavator Equipment | Backhoe/trackhoe |
| Work Performed | Agriculture |
| One Call Notified Ind | No |
| Locator Type | Unknown/other |
| Visible Marks | No |
| Service Interruption | Yes |
| Service Interruption Hours | 27 |
| Root Cause Category | Notification Issue |
| Root Cause Type | No Notification Made To The One-Call Center/811 |
| Preparer Name | K****** L* L******* |
| Preparer Title | Sr. Compliance Coordinator |
| Preparer Email | K***********@m*********.com |
| Preparer Telephone | 918-574-7315 |
| Preparer Fax | 918-574-7246 |
| Prepared Date | 2012-12-19 00:00:00 |
| Authorizer Name | K****** L* L******* |
| Authorizer Telephone | 918-574-7315 |
| Authorizer Title | Sr. Compliance Coordinator |
| Authorizer Email | K***********@m*********.com |
| Narrative | At approximately 11:42 october 6, 2011 the scada system in magellan's operations control center indicted a sharp drop in pressure and an increase in flow rate on the #6-10" pipeline between topeka and kansas city. Magellan personnel executed a code red emergency shutdown of the line in accordance with magellan's o&m procedures and notified qualified field personnel to investigate. Subsequent investigation discovered that an excavating contractor had dented the line in several places and punctured it with a tooth of a front end loader while excavating a pond. The excavator did not place a one-call with the kansas one call agency. Magellan personnel immediately began controlling the released product and repaired the line with a segment of new, pretested pipe in accordance with PHMSA regulations and company procedures. The released product was recovered and 4708 cubic yards of effected soil were remediated per company and state requirements. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA