HL incident on 2011-10-07 — TX

Operator
Centurion Pipeline L.p.
Cause
Notification Issue
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$919
Incident datetime
2011-10-07 09:32
Report number
Location
TX
Narrative
On october 7, 2011, at approximately 9:30 a.M. Central time, an underground crude oil pipeline in edmond, ok, operated by centurion pipeline was struck by construction equipment operated by t.J. Campbell construction co., a contractor engaged in excavation activities for a local real estate developer. T.J. Campbell failed to make the requred one-call notification, even though they knew the process and made numerous one call notices prior to this event. During this one day of work the scraper operator made multiple passes over the line to remove all of the soil cover, finally striking and puncturing the line. During one of the scraper passes a pipeline marker sign was destroyed. The line was marked clearly on both sides of the pond where the scraper was removing soil.
Detailed record list
Report Received Date
2011-11-03 00:00:00
Iyear
2011
Report Number
20110410
Supplemental Number
20433
Report Type
Supplemental Final
Operator Id
Name
Centurion Pipeline L.p.
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2011-10-07 09:32:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
3299
Intentional Release Bbls
0
Recovered Bbls
2309
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime
2011-10-07 09:32:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-10-07 09:50:00
Restart Datetime
2011-10-08 15:02:00
On Site Datetime
2011-10-07 10:20:00
Nrc Rpt Datetime
2011-10-07 11:35:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Num Pub Evacuated
0
Pipe Fac Name
Centurion Pipeline / #2 - 16"
Segment Name
Bretch-Johnson Junction #2
Onshore State Abbreviation
Ok
Onshore Postal Code
73034
Onshore City Name
Edmond
Onshore County Name
Oklahoma
Designated Location
Milepost/valve Station
Designated Name
M.p. 54.20
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Other
Incident Area Details
Line Exposed Due To 3rd Party Digging
Depth Of Cover
36
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
16
Pipe Wall Thickness
0.25
Pipe Smys
35000
Pipe Specification
Api 5l
Pipe Seam Type
Erw - Low Frequency
Pipe Manufacturer
Youngstown Steel
Pipe Coating Type
Coal Tar
Installation Year
1948
Manufactured Year
1948
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
2
Puncture Circum
3
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Surface Water Remed Ind
Yes
Soil Remed Ind
Yes
Vegetation Remed Ind
Yes
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
2044
Rel Water Name
Twin Bridges Subdivision Pond
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
11000
Est Cost Gas Released
104140
Est Cost Prop Damage
919
Est Cost Emergency
403295
Est Cost Environmental
66217
Est Cost Other
180979
Est Cost Other Details
Est. Operator Incidental Employee Fees, Legal Fees, Etc.
Prpty
766550
Accident Psig
450
Mop Psig
720
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
36960
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
Yes
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Accident was caused by a construction contractor working for a local real estate developer who did not make the required one-call notification. The controller identified a pressure drop in the line and shut down the line prior to operator being notified of the accident by the local fire department.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
No
Pipeline Easement Row Ind
Yes
Excavator Type
Developer
Excavator Equipment
Grader/scraper
Work Performed
Unknown/other
One Call Notified Ind
No
Locator Type
Unknown/other
Visible Marks
Yes
Service Interruption
Yes
Service Interruption Hours
29
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
R****** M****
Preparer Title
Compliance Coordinator
Preparer Email
R************@o**.com
Preparer Telephone
432-686-6805
Preparer Fax
713-985-1892
Prepared Date
2015-05-12 00:00:00
Authorizer Name
C**** C*********
Authorizer Telephone
713-497-2016
Authorizer Title
Manager Asset Integrity
Authorizer Email
C***************@o**.com
Narrative
On october 7, 2011, at approximately 9:30 a.M. Central time, an underground crude oil pipeline in edmond, ok, operated by centurion pipeline was struck by construction equipment operated by t.J. Campbell construction co., a contractor engaged in excavation activities for a local real estate developer. T.J. Campbell failed to make the requred one-call notification, even though they knew the process and made numerous one call notices prior to this event. During this one day of work the scraper operator made multiple passes over the line to remove all of the soil cover, finally striking and puncturing the line. During one of the scraper passes a pipeline marker sign was destroyed. The line was marked clearly on both sides of the pond where the scraper was removing soil.
Report Received Date 2011-11-03 00:00:00
Iyear 2011
Report Number 20110410
Supplemental Number 20433
Report Type Supplemental Final
Operator Id 31888 PHMSA Enforcement
Name Centurion Pipeline L.p.
Operator Street Address 1300 Main Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2011-10-07 09:32:00
Location Latitude 35.7042 Google Maps OpenStreetMap
Location Longitude -97.4636 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 3299
Intentional Release Bbls 0
Recovered Bbls 2309
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Cpm Leak Detection System Or Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Calculations)
Incident Identified Datetime 2011-10-07 09:32:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-10-07 09:50:00
Restart Datetime 2011-10-08 15:02:00
On Site Datetime 2011-10-07 10:20:00
Nrc Rpt Datetime 2011-10-07 11:35:00
Nrc Rpt Num 991875 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Num Pub Evacuated 0
Pipe Fac Name Centurion Pipeline / #2 - 16"
Segment Name Bretch-Johnson Junction #2
Onshore State Abbreviation Ok
Onshore Postal Code 73034
Onshore City Name Edmond
Onshore County Name Oklahoma
Designated Location Milepost/valve Station
Designated Name M.p. 54.20
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Other
Incident Area Details Line Exposed Due To 3rd Party Digging
Depth Of Cover 36
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 16
Pipe Wall Thickness 0.25
Pipe Smys 35000
Pipe Specification Api 5l
Pipe Seam Type Erw - Low Frequency
Pipe Manufacturer Youngstown Steel
Pipe Coating Type Coal Tar
Installation Year 1948
Manufactured Year 1948
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 2
Puncture Circum 3
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind Yes
Surface Water Remed Ind Yes
Soil Remed Ind Yes
Vegetation Remed Ind Yes
Water Contam Ind Yes
Surface Contam Ind Yes
Amount Released 2044
Rel Water Name Twin Bridges Subdivision Pond
Could Be Hca Yes
Commodity Reached Hca Yes
Other Pop Ind Yes
Other Pop Yes No Yes
Est Cost Oper Paid 11000
Est Cost Gas Released 104140
Est Cost Prop Damage 919
Est Cost Emergency 403295
Est Cost Environmental 66217
Est Cost Other 180979
Est Cost Other Details Est. Operator Incidental Employee Fees, Legal Fees, Etc.
Prpty 766550
Accident Psig 450
Mop Psig 720
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 36960
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind Yes
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Accident was caused by a construction contractor working for a local real estate developer who did not make the required one-call notification. The controller identified a pressure drop in the line and shut down the line prior to operator being notified of the accident by the local fire department.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt No
Pipeline Easement Row Ind Yes
Excavator Type Developer
Excavator Equipment Grader/scraper
Work Performed Unknown/other
One Call Notified Ind No
Locator Type Unknown/other
Visible Marks Yes
Service Interruption Yes
Service Interruption Hours 29
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name R****** M****
Preparer Title Compliance Coordinator
Preparer Email R************@o**.com
Preparer Telephone 432-686-6805
Preparer Fax 713-985-1892
Prepared Date 2015-05-12 00:00:00
Authorizer Name C**** C*********
Authorizer Telephone 713-497-2016
Authorizer Title Manager Asset Integrity
Authorizer Email C***************@o**.com
Narrative On october 7, 2011, at approximately 9:30 a.M. Central time, an underground crude oil pipeline in edmond, ok, operated by centurion pipeline was struck by construction equipment operated by t.J. Campbell construction co., a contractor engaged in excavation activities for a local real estate developer. T.J. Campbell failed to make the requred one-call notification, even though they knew the process and made numerous one call notices prior to this event. During this one day of work the scraper operator made multiple passes over the line to remove all of the soil cover, finally striking and puncturing the line. During one of the scraper passes a pipeline marker sign was destroyed. The line was marked clearly on both sides of the pond where the scraper was removing soil.

All rights reserved. Copyright © by ClearPHMSA