GD incident on 2011-09-16 — NV

Operator
Nv Energy
Cause
Incorrect Operation
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2011-09-16 12:15
Report number
Location
NV, WASHOE
Narrative
During a scheduled leak survey conducted on september 16, 2011, a leak was discovered by nv energy personnel. The area was made safe and repairs were made. Investigation determined that the leak was caused by a cracked service tee cap. Subsequent aeration activities were performed to remove the natural gas from the soil. The aeration costs associated with this leak exceeded the incident reporting threshold of $50,000 on november 17, 2011. The manufacturer installation procedures for the cracked service tee cap state that these types of caps are designed to be hand tightened only. The cracked cap from this failure has wrench marks. Based on this evidence, we conclude that the cap failure was most likely caused by over tightening of the cap.
Detailed record list
Occurred At
2011-09-16 12:15:00
Year
2011
Report Received Date
2011-12-09 00:00:00
Iyear
2011.0
Report Number
20110396.0
Supplemental Number
15453.0
Report Type
Supplemental Final
Operator Id
Name
Nv Energy
Operator Street Address
Po Box 10100
Operator City Name
Reno Washoe
Operator State Abbreviation
NV
Operator Postal Code
89520
Local Datetime
2011-09-16 12:15:00
Location Street Address
330 Monumental Circle
Location City Name
Sparks
Location County Name
Washoe
Location State Abbreviation
NV
Location Postal Code
89436-8938
Location Latitude
Location Longitude
Nrc Rpt Datetime
2011-11-17 15:47:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
0.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0.0
Incident Identified Datetime
2011-09-16 12:15:00
On Site Datetime
2011-09-16 12:15:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Other
System Part Details
Service Tee
Installation Year
1996.0
Material Involved
Other
Material Details
Polyacetal
Release Type
Leak
Leak Type
Crack
Class Location Type
Class 3 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
0.0
Est Cost Emergency
61138.0
Est Cost Other
0.0
Est Cost Unintentional Release
0.0
Prpty
61138.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
0.0
Accident Psig
86.0
Normal Psig
86.0
Mop Psig
90.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Scada system only used for system pressure monitoring. This gas leak did not impact system pressures.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Equipment Not Installed Properly
Operation Type
Equipment Not Installed Properly
Related Failure Follow Ind
Yes
Category Type
Construction
Operator Qualification Ind
No
Preparer Name
J** W******
Preparer Title
Supervisor Gas Compliance Operations
Preparer Email
J*******@n*******.com
Preparer Telephone
775-834-7850
Preparer Fax
775-834-1225
Authorizer Name
J*** O****
Authorizer Title
Director Gas Business
Authorizer Telephone
775-834-5644
Authorizer Email
J*****@n*******.com
Narrative
During a scheduled leak survey conducted on september 16, 2011, a leak was discovered by nv energy personnel. The area was made safe and repairs were made. Investigation determined that the leak was caused by a cracked service tee cap. Subsequent aeration activities were performed to remove the natural gas from the soil. The aeration costs associated with this leak exceeded the incident reporting threshold of $50,000 on november 17, 2011. The manufacturer installation procedures for the cracked service tee cap state that these types of caps are designed to be hand tightened only. The cracked cap from this failure has wrench marks. Based on this evidence, we conclude that the cap failure was most likely caused by over tightening of the cap.
Occurred At 2011-09-16 12:15:00
Year 2011
Report Received Date 2011-12-09 00:00:00
Iyear 2011.0
Report Number 20110396.0
Supplemental Number 15453.0
Report Type Supplemental Final
Operator Id 18308 PHMSA Enforcement
Name Nv Energy
Operator Street Address Po Box 10100
Operator City Name Reno Washoe
Operator State Abbreviation NV
Operator Postal Code 89520
Local Datetime 2011-09-16 12:15:00
Location Street Address 330 Monumental Circle
Location City Name Sparks
Location County Name Washoe
Location State Abbreviation NV
Location Postal Code 89436-8938
Location Latitude 39.64268 Google Maps OpenStreetMap
Location Longitude -119.73048 Google Maps OpenStreetMap
Nrc Rpt Datetime 2011-11-17 15:47:00
Nrc Rpt Num 995857 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 0.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0.0
Incident Identified Datetime 2011-09-16 12:15:00
On Site Datetime 2011-09-16 12:15:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Other
System Part Details Service Tee
Installation Year 1996.0
Material Involved Other
Material Details Polyacetal
Release Type Leak
Leak Type Crack
Class Location Type Class 3 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 0.0
Est Cost Emergency 61138.0
Est Cost Other 0.0
Est Cost Unintentional Release 0.0
Prpty 61138.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 0.0
Accident Psig 86.0
Normal Psig 86.0
Mop Psig 90.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Local Operating Personnel, Including Contractors
Operator Type Operator Employee
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Scada system only used for system pressure monitoring. This gas leak did not impact system pressures.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Equipment Not Installed Properly
Operation Type Equipment Not Installed Properly
Related Failure Follow Ind Yes
Category Type Construction
Operator Qualification Ind No
Preparer Name J** W******
Preparer Title Supervisor Gas Compliance Operations
Preparer Email J*******@n*******.com
Preparer Telephone 775-834-7850
Preparer Fax 775-834-1225
Authorizer Name J*** O****
Authorizer Title Director Gas Business
Authorizer Telephone 775-834-5644
Authorizer Email J*****@n*******.com
Narrative During a scheduled leak survey conducted on september 16, 2011, a leak was discovered by nv energy personnel. The area was made safe and repairs were made. Investigation determined that the leak was caused by a cracked service tee cap. Subsequent aeration activities were performed to remove the natural gas from the soil. The aeration costs associated with this leak exceeded the incident reporting threshold of $50,000 on november 17, 2011. The manufacturer installation procedures for the cracked service tee cap state that these types of caps are designed to be hand tightened only. The cracked cap from this failure has wrench marks. Based on this evidence, we conclude that the cap failure was most likely caused by over tightening of the cap.

All rights reserved. Copyright © by ClearPHMSA