GTG incident on 2011-08-04 — TX

Operator
Tennessee Gas Pipeline Co (El Paso)
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$266,775
Incident datetime
2011-08-04 12:30
Report number
Location
TX
Narrative
A US coast guard patrol observed a five feet diameter ring of bubbles in the water in the south marsh island (smi) area block 29 on the ocs. The uscg contaced boemre who in turn notified tennessee gas pipeline (tgp). Tgp dispatched company personnel and divers who identified a pinhole leak in tgp's 12" 523m-1300 pipeline. A clamp was installed and the pipeline was placed back into service.
Detailed record list
Report Received Date
2011-08-26 00:00:00
Iyear
2011
Report Number
20110313
Supplemental Number
15326
Report Type
Original Final
Operator Id
Name
Tennessee Gas Pipeline Co (El Paso)
Operator Street Address
1001 Louisiana St
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2011-08-04 11:00:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2011-08-04 13:40:00
Commodity Released Type
Natural Gas
Unintentional Release
45
Intentional Release
900
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-08-04 14:00:00
Restart Datetime
2011-08-09 07:00:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2011-08-04 12:30:00
On Site Datetime
2011-08-06 17:00:00
On Off Shore
Offshore
Off Water Depth
110
Off Accident Origin
On The Outer Continental Shelf (Ocs)
Off Ocs Area
South Marsh Island
Off Ocs Block
29
Off Area Accident Type
Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type
Interstate
System Part Involved
Offshore Pipeline, Including Riser And Riser Bend
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
12.75
Pipe Wall Thickness
0.375
Pipe Smys
42000
Pipe Specification
Api 5l Or Equivalent
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
U.s. Steel
Pipe Coating Type
Coal Tar
Installation Year
1974
Manufactured Year
1974
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
311
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
180
Est Cost Intentional Release
3600
Est Cost Prop Damage
266775
Est Cost Emergency
2500
Est Cost Other
0
Prpty
273055
Accident Psig
868
Mop Psig
1250
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
125928
Internal Inspection Ind
No
Other Restrictions Ind
Yes
Operation Complications Ind
Yes
Low Flow Ind
Yes
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Other
Accident Details
Operator Notified By Boemre Who Was Notified By Uscg Patrol Of Bubbles In Water
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Pressure was not above normal operating limits.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Not Cut Open
Int Other Corrosion Ind
Yes
Int Corrosion Type Details
Visually Inspected By Divers And Assumed To Be Internal Corrosion.
Int Field Exam Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
No
Corrosion Coupons
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
K****** C P*****
Preparer Title
Manager - Dot Compliance Field Support
Preparer Email
K*********@e*****.com
Preparer Telephone
2053257554
Preparer Fax
2053253729
Authorizer Name
K****** C P*****
Authorizer Title
Manager - Dot Compliance Field Support
Authorizer Telephone
2053257554
Authorizer Email
K*********@e*****.com
Narrative
A US coast guard patrol observed a five feet diameter ring of bubbles in the water in the south marsh island (smi) area block 29 on the ocs. The uscg contaced boemre who in turn notified tennessee gas pipeline (tgp). Tgp dispatched company personnel and divers who identified a pinhole leak in tgp's 12" 523m-1300 pipeline. A clamp was installed and the pipeline was placed back into service.
Report Received Date 2011-08-26 00:00:00
Iyear 2011
Report Number 20110313
Supplemental Number 15326
Report Type Original Final
Operator Id 19160 PHMSA Enforcement
Name Tennessee Gas Pipeline Co (El Paso)
Operator Street Address 1001 Louisiana St
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2011-08-04 11:00:00
Location Latitude 28.8115 Google Maps OpenStreetMap
Location Longitude -92.14333 Google Maps OpenStreetMap
Nrc Rpt Num 984924 NRC Report How to search
Nrc Rpt Datetime 2011-08-04 13:40:00
Commodity Released Type Natural Gas
Unintentional Release 45
Intentional Release 900
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-08-04 14:00:00
Restart Datetime 2011-08-09 07:00:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2011-08-04 12:30:00
On Site Datetime 2011-08-06 17:00:00
On Off Shore Offshore
Off Water Depth 110
Off Accident Origin On The Outer Continental Shelf (Ocs)
Off Ocs Area South Marsh Island
Off Ocs Block 29
Off Area Accident Type Below Water, Pipe Buried Or Jetted Below Seabed
Pipe Facility Type Interstate
System Part Involved Offshore Pipeline, Including Riser And Riser Bend
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 12.75
Pipe Wall Thickness 0.375
Pipe Smys 42000
Pipe Specification Api 5l Or Equivalent
Pipe Seam Type Other
Pipe Seam Details Unknown
Pipe Manufacturer U.s. Steel
Pipe Coating Type Coal Tar
Installation Year 1974
Manufactured Year 1974
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 311
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 180
Est Cost Intentional Release 3600
Est Cost Prop Damage 266775
Est Cost Emergency 2500
Est Cost Other 0
Prpty 273055
Accident Psig 868
Mop Psig 1250
Mop Cfr Section Not On Omb-Approved Form When Submitted View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Length Segment Isolated 125928
Internal Inspection Ind No
Other Restrictions Ind Yes
Operation Complications Ind Yes
Low Flow Ind Yes
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Other
Accident Details Operator Notified By Boemre Who Was Notified By Uscg Patrol Of Bubbles In Water
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Pressure was not above normal operating limits.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details Internal Corrosion
Internal External Internal Corrosion
Int Visual Exam Results Not Cut Open
Int Other Corrosion Ind Yes
Int Corrosion Type Details Visually Inspected By Divers And Assumed To Be Internal Corrosion.
Int Field Exam Basis Ind Yes
Int Low Point Pipe Loc Ind Yes
Corrosion Inhibitors Yes
Corrosion Lining No
Cleaning Dewatering No
Corrosion Coupons No
Collected Data Ind No
Has Hydrtst Conduc Before Ind No
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name K****** C P*****
Preparer Title Manager - Dot Compliance Field Support
Preparer Email K*********@e*****.com
Preparer Telephone 2053257554
Preparer Fax 2053253729
Authorizer Name K****** C P*****
Authorizer Title Manager - Dot Compliance Field Support
Authorizer Telephone 2053257554
Authorizer Email K*********@e*****.com
Narrative A US coast guard patrol observed a five feet diameter ring of bubbles in the water in the south marsh island (smi) area block 29 on the ocs. The uscg contaced boemre who in turn notified tennessee gas pipeline (tgp). Tgp dispatched company personnel and divers who identified a pinhole leak in tgp's 12" 523m-1300 pipeline. A clamp was installed and the pipeline was placed back into service.