Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-07-19 — KS
Operator
Nustar Pipeline Operating Partnership L.p.
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$2,000
Incident datetime
2011-07-19 11:00
Report number
Location
KS
Narrative
A pin hole was found in a circumferential weld below valve 7-15. A clamp was installed and a permanent repair sleeve was welded over the affected area.
Detailed record list
Report Received Date
2011-08-16 00:00:00
Iyear
2011
Report Number
20110292
Supplemental Number
18663
Report Type
Supplemental Final
Operator Id
10012
Name
Nustar Pipeline Operating Partnership L.p.
Operator Street Address
7340 W. 21st Street N, Suite 200
Operator City Name
Wichita
Operator State Abbreviation
KS
Operator Postal Code
67205
Local Datetime
2011-07-19 11:00:00
Location Latitude
42.053138
Location Longitude
-96.043891
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Anhydrous Ammonia
Unintentional Release Bbls
0.27
Intentional Release Bbls
0
Recovered Bbls
0.27
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-07-19 11:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Had Been Shut Down Previously Due To Missouri River Flooding.
On Site Datetime
2011-07-26 08:00:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Cushing Traps To Blair Station
Segment Name
Cushing Traps To Ia/ne State Line
Onshore State Abbreviation
Ia
Onshore Postal Code
51040
Onshore City Name
Onawa
Onshore County Name
Monona
Designated Location
Milepost/valve Station
Designated Name
7-87.94/7-15
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Pipe Facility Type
Interstate
Item Involved
Weld, Including Heat-Affected Zone
Release Type
Leak
Leak Type
Pinhole
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
Other Pop Ind
Yes
Other Pop Yes No
Yes
Est Cost Oper Paid
500
Est Cost Gas Released
20
Est Cost Prop Damage
2000
Est Cost Emergency
1500
Est Cost Environmental
700
Est Cost Other
0
Prpty
4720
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Design-, Construction-, Installation-, Or Fabrication-Related
Failure Type
Design-, Construction-, Installation-, Or Fabrication-Related
Preparer Name
D***** J* T******
Preparer Title
Director - Hse
Preparer Email
D**********@n***********.com
Preparer Telephone
316-721-7056
Preparer Fax
316-773-9001
Prepared Date
2013-10-25 00:00:00
Authorizer Name
G***** K*********
Authorizer Telephone
316-721-7052
Authorizer Title
Vice President General Manager
Authorizer Email
G**************@n***********.com
Narrative
A pin hole was found in a circumferential weld below valve 7-15. A clamp was installed and a permanent repair sleeve was welded over the affected area.
| Report Received Date | 2011-08-16 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110292 |
| Supplemental Number | 18663 |
| Report Type | Supplemental Final |
| Operator Id | 10012 PHMSA Enforcement |
| Name | Nustar Pipeline Operating Partnership L.p. |
| Operator Street Address | 7340 W. 21st Street N, Suite 200 |
| Operator City Name | Wichita |
| Operator State Abbreviation | KS |
| Operator Postal Code | 67205 |
| Local Datetime | 2011-07-19 11:00:00 |
| Location Latitude | 42.053138 Google Maps OpenStreetMap |
| Location Longitude | -96.043891 Google Maps OpenStreetMap |
| Commodity Released Type | Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions |
| Commodity Subtype | Anhydrous Ammonia |
| Unintentional Release Bbls | 0.27 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0.27 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2011-07-19 11:00:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Had Been Shut Down Previously Due To Missouri River Flooding. |
| On Site Datetime | 2011-07-26 08:00:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Cushing Traps To Blair Station |
| Segment Name | Cushing Traps To Ia/ne State Line |
| Onshore State Abbreviation | Ia |
| Onshore Postal Code | 51040 |
| Onshore City Name | Onawa |
| Onshore County Name | Monona |
| Designated Location | Milepost/valve Station |
| Designated Name | 7-87.94/7-15 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Pipe Facility Type | Interstate |
| Item Involved | Weld, Including Heat-Affected Zone |
| Release Type | Leak |
| Leak Type | Pinhole |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Other Pop Ind | Yes |
| Other Pop Yes No | Yes |
| Est Cost Oper Paid | 500 |
| Est Cost Gas Released | 20 |
| Est Cost Prop Damage | 2000 |
| Est Cost Emergency | 1500 |
| Est Cost Environmental | 700 |
| Est Cost Other | 0 |
| Prpty | 4720 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Material Failure Of Pipe Or Weld |
| Cause Details | Design-, Construction-, Installation-, Or Fabrication-Related |
| Failure Type | Design-, Construction-, Installation-, Or Fabrication-Related |
| Preparer Name | D***** J* T****** |
| Preparer Title | Director - Hse |
| Preparer Email | D**********@n***********.com |
| Preparer Telephone | 316-721-7056 |
| Preparer Fax | 316-773-9001 |
| Prepared Date | 2013-10-25 00:00:00 |
| Authorizer Name | G***** K********* |
| Authorizer Telephone | 316-721-7052 |
| Authorizer Title | Vice President General Manager |
| Authorizer Email | G**************@n***********.com |
| Narrative | A pin hole was found in a circumferential weld below valve 7-15. A clamp was installed and a permanent repair sleeve was welded over the affected area. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA