Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2010-12-06 — TX
Operator
Unocal Pipeline Co - Eastern Region
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$15,000
Incident datetime
2010-12-06 13:00
Report number
Location
TX
Narrative
At 1500 cst on 06 dec 10 cpl field personnel confirmed a release on the 8" van gathering system near the van station. The release source was a pinhole @ the 6 o' clock position; directly below the line is a sewer opening that feeds to a nearby water treatment facility. There are reports of an oil sheen in the treatment facility. Chevron production and cpl personnel have deployed skimmer units and a vacuum truck @ the treatment facility; containment boom, skimmer units and a vacuum truck have been deployed @ the little sandy creek outfall area, the point of discharge from the treatment facility. Cpl crew installed a temporary clamp to prevent further leakage. The following day, cpl crew removed temporary clamp & installed a plidco mechanical sleeve. The sewage treatment plant and piping have been cleaned of all contaminates. The section of pipe where the leak occurred will remain out of service until further notice. Cpl has made the decision to idle the entire van crude system & we are currently in the process of removing the crude oil line fill.
Detailed record list
Report Received Date
2011-01-05 00:00:00
Iyear
2010
Report Number
20110266
Supplemental Number
15959
Report Type
Original Final
Operator Id
26303
Name
Unocal Pipeline Co - Eastern Region
Operator Street Address
1400 Smith Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2010-12-06 13:00:00
Location Latitude
32.540604
Location Longitude
-95.701173
Commodity Released Type
Crude Oil
Unintentional Release Bbls
3
Intentional Release Bbls
0
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Notification From Public
Incident Identified Datetime
2010-12-06 13:00:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-12-06 13:15:00
Still Shutdown Ind
Yes
On Site Datetime
2010-12-06 13:10:00
Nrc Rpt Datetime
2010-12-06 16:42:00
Nrc Rpt Num
961562
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Van Gathering
Segment Name
Crim Jct. To Van Station
Onshore State Abbreviation
Tx
Onshore Postal Code
75790
Onshore City Name
Van
Onshore County Name
Van Zandt
Designated Location
Milepost/valve Station
Designated Name
0.5
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.312
Pipe Smys
24000
Pipe Specification
Unknown
Pipe Seam Type
Other
Pipe Seam Details
Unknown
Pipe Manufacturer
Unknown
Pipe Coating Type
Coal Tar
Installation Year
1929
Manufactured Year
1929
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
No
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
15000
Est Cost Emergency
200000
Est Cost Environmental
35000
Est Cost Other
0
Prpty
250000
Accident Psig
50
Mop Psig
88
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
1700
Internal Inspection Ind
No
Diameter Change Ind
Yes
Tight Mitered Ind
Yes
Operation Complications Ind
Yes
Low Op Pressure Ind
Yes
Low Flow Ind
Yes
Pipeline Function
=< 20% Smys Regulated Gathering
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Field Exam Basis Ind
Yes
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1975
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2010
Prior Damage
No
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
2010
Hydrtst Most Rcnt Pressure
110
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
J* R* B****
Preparer Title
Dot Specialist
Preparer Email
R*****@c******.com
Preparer Telephone
713-432-3206
Preparer Fax
713-432-3477
Prepared Date
2011-08-03 00:00:00
Authorizer Name
J* R* B****
Authorizer Telephone
713-432-3206
Authorizer Title
Dot Specialist
Authorizer Email
R*****@c******.com
Narrative
A******************************************************************************************************************************************************@ the 6 o' clock position; directly below the line is a sewer opening that feeds to a nearby water treatment facility. There are reports of an oil sheen in the treatment facility. Chevron production and cpl personnel have deployed skimmer units and a vacuum truck @ the treatment facility; containment boom, skimmer units and a vacuum truck have been deployed @ the little sandy creek outfall area, the point of discharge from the treatment facility. Cpl crew installed a temporary clamp to prevent further leakage. The following day, cpl crew removed temporary clamp & installed a plidco mechanical sleeve. The sewage treatment plant and piping have been cleaned of all contaminates. The section of pipe where the leak occurred will remain out of service until further notice. ***********************************************************************************************************************************.
| Report Received Date | 2011-01-05 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20110266 |
| Supplemental Number | 15959 |
| Report Type | Original Final |
| Operator Id | 26303 PHMSA Enforcement |
| Name | Unocal Pipeline Co - Eastern Region |
| Operator Street Address | 1400 Smith Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2010-12-06 13:00:00 |
| Location Latitude | 32.540604 Google Maps OpenStreetMap |
| Location Longitude | -95.701173 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 3 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Notification From Public |
| Incident Identified Datetime | 2010-12-06 13:00:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2010-12-06 13:15:00 |
| Still Shutdown Ind | Yes |
| On Site Datetime | 2010-12-06 13:10:00 |
| Nrc Rpt Datetime | 2010-12-06 16:42:00 |
| Nrc Rpt Num | 961562 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Van Gathering |
| Segment Name | Crim Jct. To Van Station |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 75790 |
| Onshore City Name | Van |
| Onshore County Name | Van Zandt |
| Designated Location | Milepost/valve Station |
| Designated Name | 0.5 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.312 |
| Pipe Smys | 24000 |
| Pipe Specification | Unknown |
| Pipe Seam Type | Other |
| Pipe Seam Details | Unknown |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Coal Tar |
| Installation Year | 1929 |
| Manufactured Year | 1929 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | No |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 15000 |
| Est Cost Emergency | 200000 |
| Est Cost Environmental | 35000 |
| Est Cost Other | 0 |
| Prpty | 250000 |
| Accident Psig | 50 |
| Mop Psig | 88 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 1700 |
| Internal Inspection Ind | No |
| Diameter Change Ind | Yes |
| Tight Mitered Ind | Yes |
| Operation Complications Ind | Yes |
| Low Op Pressure Ind | Yes |
| Low Flow Ind | Yes |
| Pipeline Function | =< 20% Smys Regulated Gathering |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | External Corrosion |
| Internal External | External Corrosion |
| Visual Exam Results | Localized Pitting |
| Galvanic Corrosion Ind | Yes |
| Field Exam Basis Ind | Yes |
| Underground Location | Yes |
| Under Cathodic Protection Ind | Yes |
| Cathodic Pro Start Year | 1975 |
| Shielding Evident | No |
| Cathodic Survey Type | Yes |
| Cp Annual Survey Ind | Yes |
| Cp Annual Survey Year | 2010 |
| Prior Damage | No |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | Yes |
| Hydrtst Most Rcnt Year | 2010 |
| Hydrtst Most Rcnt Pressure | 110 |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | J* R* B**** |
| Preparer Title | Dot Specialist |
| Preparer Email | R*****@c******.com |
| Preparer Telephone | 713-432-3206 |
| Preparer Fax | 713-432-3477 |
| Prepared Date | 2011-08-03 00:00:00 |
| Authorizer Name | J* R* B**** |
| Authorizer Telephone | 713-432-3206 |
| Authorizer Title | Dot Specialist |
| Authorizer Email | R*****@c******.com |
| Narrative | A******************************************************************************************************************************************************@ the 6 o' clock position; directly below the line is a sewer opening that feeds to a nearby water treatment facility. There are reports of an oil sheen in the treatment facility. Chevron production and cpl personnel have deployed skimmer units and a vacuum truck @ the treatment facility; containment boom, skimmer units and a vacuum truck have been deployed @ the little sandy creek outfall area, the point of discharge from the treatment facility. Cpl crew installed a temporary clamp to prevent further leakage. The following day, cpl crew removed temporary clamp & installed a plidco mechanical sleeve. The sewage treatment plant and piping have been cleaned of all contaminates. The section of pipe where the leak occurred will remain out of service until further notice. ***********************************************************************************************************************************. |