Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-06-23 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2011-06-23 08:45
Report number
Location
OK
Narrative
Stem packing on a mainline valve was identified as the leak source. It was determined during line reversal that this valve was not needed, and therefore removed.
Detailed record list
Report Received Date
2011-07-21 00:00:00
Iyear
2011
Report Number
20110253
Supplemental Number
19852
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2011-06-23 00:00:00
Location Latitude
30.042343
Location Longitude
-96.914558
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
2.3
Intentional Release Bbls
0
Recovered Bbls
1.18
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2011-06-23 08:45:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
On Site Datetime
2011-06-23 08:45:00
Nrc Rpt Datetime
2011-06-23 10:37:00
Nrc Rpt Num
980525
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Manual
Pipe Fac Name
Warda Station
Onshore State Abbreviation
Tx
Onshore Postal Code
78960
Onshore City Name
Warda
Onshore County Name
Fayette
Designated Location
Survey Station No.
Designated Name
5960+68
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Material Involved
Material Other Than Carbon Steel
Material Details
Seal
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
350
Est Cost Prop Damage
0
Est Cost Emergency
74500
Est Cost Environmental
83250
Est Cost Other
0
Prpty
158100
Accident Psig
655
Mop Psig
965
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
258192
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
This was a pinhole leak and therefore cold not be picked up by our leak detection systems. Due to this information , magellan did not initiate an investigaiton into the controller's actions as he did not cause or contibute to the leak.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Other Non Threaded Ind
Seal (Not Pump Seal) Or Packing
Eq Additional Other Ind
Yes
Eq Additional Other Details
Seal Failure
Preparer Name
D******* C*********
Preparer Title
Sr. Compliance Coordinator
Preparer Email
D******************@m*********.com
Prepared Date
2014-10-30 00:00:00
Authorizer Name
D******* C*********
Authorizer Telephone
918-574-7386
Authorizer Email
No Email Address
Narrative
Stem packing on a mainline valve was identified as the leak source. It was determined during line reversal that this valve was not needed, and therefore removed.
| Report Received Date | 2011-07-21 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110253 |
| Supplemental Number | 19852 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2011-06-23 00:00:00 |
| Location Latitude | 30.042343 Google Maps OpenStreetMap |
| Location Longitude | -96.914558 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 2.3 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 1.18 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2011-06-23 08:45:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| On Site Datetime | 2011-06-23 08:45:00 |
| Nrc Rpt Datetime | 2011-06-23 10:37:00 |
| Nrc Rpt Num | 980525 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Remotely Controlled |
| Downstream Valve Type Ind | Manual |
| Pipe Fac Name | Warda Station |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 78960 |
| Onshore City Name | Warda |
| Onshore County Name | Fayette |
| Designated Location | Survey Station No. |
| Designated Name | 5960+68 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Incident Area Subtype | Typical Aboveground Facility Piping Or Appurtenance |
| Crossing | No |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Mainline |
| Material Involved | Material Other Than Carbon Steel |
| Material Details | Seal |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 350 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 74500 |
| Est Cost Environmental | 83250 |
| Est Cost Other | 0 |
| Prpty | 158100 |
| Accident Psig | 655 |
| Mop Psig | 965 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 258192 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Cpm In Place Ind | Yes |
| Cpm Operating Ind | Yes |
| Cpm Functional Ind | Yes |
| Cpm Detection Ind | No |
| Cpm Conf Ind | No |
| Investigation Status | No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate) |
| Investigation Status Details | This was a pinhole leak and therefore cold not be picked up by our leak detection systems. Due to this information , magellan did not initiate an investigaiton into the controller's actions as he did not cause or contibute to the leak. |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Non-Threaded Connection Failure |
| Eq Failure Type | Non-Threaded Connection Failure |
| Other Non Threaded Ind | Seal (Not Pump Seal) Or Packing |
| Eq Additional Other Ind | Yes |
| Eq Additional Other Details | Seal Failure |
| Preparer Name | D******* C********* |
| Preparer Title | Sr. Compliance Coordinator |
| Preparer Email | D******************@m*********.com |
| Prepared Date | 2014-10-30 00:00:00 |
| Authorizer Name | D******* C********* |
| Authorizer Telephone | 918-574-7386 |
| Authorizer Email | No Email Address |
| Narrative | Stem packing on a mainline valve was identified as the leak source. It was determined during line reversal that this valve was not needed, and therefore removed. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA