HL incident on 2011-06-21 — IL

Operator
Bp West Coast Products L.l.c.
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2011-06-21 12:30
Report number
Location
IL
Narrative
On june 21, 2011, at approximately 12:30pm bp marine terminal 2, csfm id#0092 / line 69 experienced an approximate 4bbl release of jet fuel due to gasket failure on above ground pipeline. The product was contained within the secondary containment area. The line was shutdown and isolated. The long beach fire dept; ca oes arrived on scene. Lbfd sprayed foam over the spill area. Spill response contractor arrived promptly and was dispatched to clean up residual product and a repair plan was developed. Se winds at 5mph, temp 80f w/ 30%humidity & barometric pressure of 29.92 inches. All product was recovered or washed to enclosed facility sump. A garlock blue-guard 3000 cut ring gasket was in service at flange 0028, at time of failure. Gasket ring material separated in service and loss of product incident occurred at facility.
Detailed record list
Report Received Date
2011-07-18 00:00:00
Iyear
2011
Report Number
20110248
Supplemental Number
18930
Report Type
Supplemental Final
Operator Id
Name
Bp West Coast Products L.l.c.
Operator Street Address
150 West Warrenville Road
Operator City Name
Naperville
Operator State Abbreviation
IL
Operator Postal Code
60563
Local Datetime
2011-06-21 12:30:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
4
Intentional Release Bbls
0
Recovered Bbls
3.8
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-06-21 12:30:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
On Site Datetime
2011-06-21 12:30:00
Nrc Rpt Datetime
2011-06-21 13:15:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Line 69
Segment Name
Csfm 0092
Onshore State Abbreviation
Ca
Onshore Postal Code
90813
Onshore City Name
Long Beach
Onshore County Name
Los Angeles
Designated Location
Milepost/valve Station
Designated Name
Marine Term 2
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Intrastate
Item Involved
Flange Assembly
Release Type
Leak
Leak Type
Other
Leak Type Other
Gasket
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
400
Est Cost Prop Damage
0
Est Cost Emergency
45000
Est Cost Environmental
0
Est Cost Other
0
Prpty
45400
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Non-Threaded Connection Failure
Eq Failure Type
Non-Threaded Connection Failure
Preparer Name
C***** R********
Preparer Title
Hse Coordinator
Preparer Email
C***************@b*.com
Preparer Telephone
562 728 2782
Preparer Fax
714 670 5037
Prepared Date
2014-01-16 00:00:00
Authorizer Name
M****** S******
Authorizer Telephone
630 536-3495
Authorizer Title
Dot Team Lead
Authorizer Email
M**************@b*.com
Narrative
On june 21, 2011, at approximately 12:30pm bp marine terminal 2, csfm id#0092 / line 69 experienced an approximate 4bbl release of jet fuel due to gasket failure on above ground pipeline. The product was contained within the secondary containment area. The line was shutdown and isolated. The long beach fire dept; ca oes arrived on scene. Lbfd sprayed foam over the spill area. Spill response contractor arrived promptly and was dispatched to clean up residual product and a repair plan was developed. Se winds at 5mph, temp 80f w/ 30%humidity & barometric pressure of 29.92 inches. All product was recovered or washed to enclosed facility sump. A garlock blue-guard 3000 cut ring gasket was in service at flange 0028, at time of failure. Gasket ring material separated in service and loss of product incident occurred at facility.
Report Received Date 2011-07-18 00:00:00
Iyear 2011
Report Number 20110248
Supplemental Number 18930
Report Type Supplemental Final
Operator Id 31610 PHMSA Enforcement
Name Bp West Coast Products L.l.c.
Operator Street Address 150 West Warrenville Road
Operator City Name Naperville
Operator State Abbreviation IL
Operator Postal Code 60563
Local Datetime 2011-06-21 12:30:00
Location Latitude 33.4604 Google Maps OpenStreetMap
Location Longitude -118.12035 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 4
Intentional Release Bbls 0
Recovered Bbls 3.8
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2011-06-21 12:30:00
System Part Involved Onshore Terminal/tank Farm Equipment And Piping
On Off Shore Onshore
On Site Datetime 2011-06-21 12:30:00
Nrc Rpt Datetime 2011-06-21 13:15:00
Nrc Rpt Num 980327 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Line 69
Segment Name Csfm 0092
Onshore State Abbreviation Ca
Onshore Postal Code 90813
Onshore City Name Long Beach
Onshore County Name Los Angeles
Designated Location Milepost/valve Station
Designated Name Marine Term 2
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Intrastate
Item Involved Flange Assembly
Release Type Leak
Leak Type Other
Leak Type Other Gasket
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 400
Est Cost Prop Damage 0
Est Cost Emergency 45000
Est Cost Environmental 0
Est Cost Other 0
Prpty 45400
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Non-Threaded Connection Failure
Eq Failure Type Non-Threaded Connection Failure
Preparer Name C***** R********
Preparer Title Hse Coordinator
Preparer Email C***************@b*.com
Preparer Telephone 562 728 2782
Preparer Fax 714 670 5037
Prepared Date 2014-01-16 00:00:00
Authorizer Name M****** S******
Authorizer Telephone 630 536-3495
Authorizer Title Dot Team Lead
Authorizer Email M**************@b*.com
Narrative On june 21, 2011, at approximately 12:30pm bp marine terminal 2, csfm id#0092 / line 69 experienced an approximate 4bbl release of jet fuel due to gasket failure on above ground pipeline. The product was contained within the secondary containment area. The line was shutdown and isolated. The long beach fire dept; ca oes arrived on scene. Lbfd sprayed foam over the spill area. Spill response contractor arrived promptly and was dispatched to clean up residual product and a repair plan was developed. Se winds at 5mph, temp 80f w/ 30%humidity & barometric pressure of 29.92 inches. All product was recovered or washed to enclosed facility sump. A garlock blue-guard 3000 cut ring gasket was in service at flange 0028, at time of failure. Gasket ring material separated in service and loss of product incident occurred at facility.