Pacific Gas & Electric Co
Cause
Notification Issue
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$60,000
Incident datetime
2011-06-13 13:22
Report number
Location
CA
Narrative
On june 13, 2011 at 1315 hours a third party subcontractor, knife river construction, struck and punctured gas transmission line 114 while grading into a slope adjacent to toland lane. The work being performed was part of a larger project to cut a drainage ditch in conjuction with the development of a wind farm. The subcontractor did not notify USA or pg&e of the work being performed. The sub-contractor did not have a valid USA ticket and, as such, the area was not properly delineated or marked and located. The contractor called 911 and pg&e to report the incident. The fire department was on scene. It is estimated that 1.5 to 2 mmcf of gas was released to atmosphere at mp 3.9 on line 114. There were no injuries or fatalities as a result of this incident. No major media was present. This incident is reportable due to estimated damages exceeding $50,000.
Detailed record list
Report Received Date
2011-07-11 00:00:00
Iyear
2011
Report Number
20110239
Supplemental Number
15428
Report Type
Supplemental Final
Operator Id
Name
Pacific Gas & Electric Co
Operator Street Address
6121 Bollinger Canyon Rd.
Operator City Name
San Ramon
Operator State Abbreviation
CA
Operator Postal Code
94583
Local Datetime
2011-06-13 13:15:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2011-06-13 18:00:00
Commodity Released Type
Natural Gas
Unintentional Release
2000
Intentional Release
0
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-06-13 16:00:00
Restart Datetime
2011-06-15 12:00:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2011-06-13 13:22:00
On Site Datetime
2011-06-13 14:00:00
On Off Shore
Onshore
Onshore State Abbreviation
Ca
Onshore Postal Code
94571
Onshore City Name
Rio Vista
Onshore County Name
Solano
Designated Location
Milepost
Designated Name
3.9
Pipe Fac Name
Line 114
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
39
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
16
Pipe Wall Thickness
0.4
Pipe Smys
29
Pipe Specification
Grb
Pipe Seam Type
Seamless
Pipe Coating Type
Asphalt
Installation Year
1942
Manufactured Year
1942
Material Involved
Carbon Steel
Release Type
Mechanical Puncture
Puncture Axial
6
Puncture Circum
6
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
250
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
10000
Est Cost Intentional Release
0
Est Cost Prop Damage
60000
Est Cost Emergency
0
Est Cost Other
0
Est Cost Other Details
None
Prpty
70000
Accident Psig
360
Mop Psig
510
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Length Segment Isolated
2012
Internal Inspection Ind
No
Tight Mitered Ind
Yes
Other Restrictions Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
Yes
Accident Identifier
Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
This incident was a third party dig-in; there were no controller or control room issues associated with this incident.
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Excavation Damage
Cause Details
Excavation Damage By Third Party
Ex Party Type
Excavation Damage By Third Party
Prior Notification Ind
No
Notify Cga Dirt
Yes
Private Row Ind
Yes
Private Subtype
Private Business
Excavator Type
Contractor
Excavator Equipment
Backhoe/trackhoe
Work Performed
Grading
One Call Notified Ind
No
Locator Type
Data Not Collected
Visible Marks
Yes
Service Interruption
No
Root Cause Category
Notification Issue
Root Cause Type
No Notification Made To The One-Call Center/811
Preparer Name
L******* D*******
Preparer Title
Sr. Program Manager
Preparer Email
L***@p**.com
Preparer Telephone
925 974 4313
Authorizer Name
B*** G*****
Authorizer Title
Director Regulatory Compliance
Authorizer Telephone
9259744210
Authorizer Email
No Email Address
Narrative
On june 13, 2011 at 1315 hours a third party subcontractor, knife river construction, struck and punctured gas transmission line 114 while grading into a slope adjacent to toland lane. The work being performed was part of a larger project to cut a drainage ditch in conjuction with the development of a wind farm. The subcontractor did not notify USA or pg&e of the work being performed. The sub-contractor did not have a valid USA ticket and, as such, the area was not properly delineated or marked and located. The contractor called 911 and pg&e to report the incident. The fire department was on scene. It is estimated that 1.5 to 2 mmcf of gas was released to atmosphere at mp 3.9 on line 114. There were no injuries or fatalities as a result of this incident. No major media was present. This incident is reportable due to estimated damages exceeding $50,000.
Report Received Date 2011-07-11 00:00:00
Iyear 2011
Report Number 20110239
Supplemental Number 15428
Report Type Supplemental Final
Operator Id 15007 PHMSA Enforcement
Name Pacific Gas & Electric Co
Operator Street Address 6121 Bollinger Canyon Rd.
Operator City Name San Ramon
Operator State Abbreviation CA
Operator Postal Code 94583
Local Datetime 2011-06-13 13:15:00
Location Latitude 38.090439 Google Maps OpenStreetMap
Location Longitude -121.750695 Google Maps OpenStreetMap
Nrc Rpt Num 979566 NRC Report How to search
Nrc Rpt Datetime 2011-06-13 18:00:00
Commodity Released Type Natural Gas
Unintentional Release 2000
Intentional Release 0
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-06-13 16:00:00
Restart Datetime 2011-06-15 12:00:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2011-06-13 13:22:00
On Site Datetime 2011-06-13 14:00:00
On Off Shore Onshore
Onshore State Abbreviation Ca
Onshore Postal Code 94571
Onshore City Name Rio Vista
Onshore County Name Solano
Designated Location Milepost
Designated Name 3.9
Pipe Fac Name Line 114
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 39
Crossing No
Pipe Facility Type Intrastate
System Part Involved Onshore Pipeline, Including Valve Sites
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 16
Pipe Wall Thickness 0.4
Pipe Smys 29
Pipe Specification Grb
Pipe Seam Type Seamless
Pipe Coating Type Asphalt
Installation Year 1942
Manufactured Year 1942
Material Involved Carbon Steel
Release Type Mechanical Puncture
Puncture Axial 6
Puncture Circum 6
Class Location Type Class 1 Location
Could Be Hca No
Pir Radius 250
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 10000
Est Cost Intentional Release 0
Est Cost Prop Damage 60000
Est Cost Emergency 0
Est Cost Other 0
Est Cost Other Details None
Prpty 70000
Accident Psig 360
Mop Psig 510
Mop Cfr Section Not On Omb-Approved Form When Submitted View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Length Segment Isolated 2012
Internal Inspection Ind No
Tight Mitered Ind Yes
Other Restrictions Ind Yes
Operation Complications Ind No
Pipeline Function Transmission System
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind Yes
Accident Identifier Scada-Based Information (Such As Alarm(S), Alert(S), Event(S), And/or Volume Or Pack Calculations)
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details This incident was a third party dig-in; there were no controller or control room issues associated with this incident.
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Excavation Damage
Cause Details Excavation Damage By Third Party
Ex Party Type Excavation Damage By Third Party
Prior Notification Ind No
Notify Cga Dirt Yes
Private Row Ind Yes
Private Subtype Private Business
Excavator Type Contractor
Excavator Equipment Backhoe/trackhoe
Work Performed Grading
One Call Notified Ind No
Locator Type Data Not Collected
Visible Marks Yes
Service Interruption No
Root Cause Category Notification Issue
Root Cause Type No Notification Made To The One-Call Center/811
Preparer Name L******* D*******
Preparer Title Sr. Program Manager
Preparer Email L***@p**.com
Preparer Telephone 925 974 4313
Authorizer Name B*** G*****
Authorizer Title Director Regulatory Compliance
Authorizer Telephone 9259744210
Authorizer Email No Email Address
Narrative On june 13, 2011 at 1315 hours a third party subcontractor, knife river construction, struck and punctured gas transmission line 114 while grading into a slope adjacent to toland lane. The work being performed was part of a larger project to cut a drainage ditch in conjuction with the development of a wind farm. The subcontractor did not notify USA or pg&e of the work being performed. The sub-contractor did not have a valid USA ticket and, as such, the area was not properly delineated or marked and located. The contractor called 911 and pg&e to report the incident. The fire department was on scene. It is estimated that 1.5 to 2 mmcf of gas was released to atmosphere at mp 3.9 on line 114. There were no injuries or fatalities as a result of this incident. No major media was present. This incident is reportable due to estimated damages exceeding $50,000.