GTG incident on 2011-05-29 — TX
Operator
Panhandle Eastern Pipeline Co
Cause
Corrosion Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$20,000
Incident datetime
2011-05-29 08:07
Report number
Location
TX
Narrative
At 8:07 am on may 29, 2011, panhandle eastern pipe line company received a call from a retired employee reporting blowing gas at the borchers storage field. A pepl employee was at the field and isolated the affected line segment within 23 minutes. Visual observation of the failed pipe segment indicates internal wall loss due to corrosion for 5 feet in the vicinity of the fracture immediately downstream of a 4" to 6" reducer, in a low point of the pipe. Laboratory analysis of the failed pipe segment concluded that the internal corrosion was likely the result of aqueous corrosion caused by water and other contaminants in the product stream. It is also likely that under deposit corrosion created the local environment that resulted in the corrosion observed. The corrosion deposits were not consistent with microbiological-assisted corrosion, and the corrosion was not associated with the erw seam. **this report is being submitted in response to PHMSA's request for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents. This report has no further updates and is being submitted as a final.
Detailed record list
Report Received Date
2011-06-23 00:00:00
Iyear
2011
Report Number
20110194
Supplemental Number
16024
Report Type
Supplemental Final
Operator Id
15105
Name
Panhandle Eastern Pipeline Co
Operator Street Address
5051 Westheimer Road
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77056
Local Datetime
2011-05-29 08:07:00
Location Latitude
37.212617
Location Longitude
-100.355841
Nrc Rpt Num
977716
Nrc Rpt Datetime
2011-05-29 13:06:00
Commodity Released Type
Natural Gas
Unintentional Release
45000
Intentional Release
1750
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-05-29 08:30:00
Still Shutdown Ind
Yes
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2011-05-29 08:07:00
On Site Datetime
2011-05-29 08:07:00
On Off Shore
Onshore
Onshore State Abbreviation
Ks
Onshore Postal Code
67864
Onshore City Name
Meade
Onshore County Name
Meade
Pipe Fac Name
Borchers Storage Field
Segment Name
Lowen 1-10/35-03-034-08
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
72
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.625
Pipe Wall Thickness
0.219
Pipe Smys
46000
Pipe Specification
5l
Pipe Seam Type
Longitudinal Erw - High Frequency
Pipe Manufacturer
Tex-Tube
Pipe Coating Type
Field Applied Epoxy
Installation Year
1981
Manufactured Year
1981
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Length
90
Rupture Width
14
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
198
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
180000
Est Cost Intentional Release
7000
Est Cost Prop Damage
20000
Est Cost Emergency
1000
Est Cost Other
0
Prpty
208000
Accident Psig
1639
Mop Psig
1875
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
3039
Internal Inspection Ind
No
Diameter Change Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission In Storage Field
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Public
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
2
Num Employees Failed
0
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
General Corrosion
Int Water Acid Ind
Yes
Int Field Exam Basis Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
Yes
Corrosion Lining
No
Cleaning Dewatering
Not Applicable - Not Mainline Pipe
Corrosion Coupons
Not Applicable - Not Mainline Pipe
Collected Data Ind
No
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
N***** H******
Preparer Title
Director Interstate Regulatory Compliance
Preparer Email
N*************@e*************.com
Preparer Telephone
713-857-5479
Authorizer Name
N***** H******
Authorizer Title
Director Interstate Regulatory Compliance
Authorizer Telephone
713-857-5479
Authorizer Email
N*************@e*************.com
Narrative
At 8:07 am on may 29, 2011, panhandle eastern pipe line company received a call from a retired employee reporting blowing gas at the borchers storage field. A pepl employee was at the field and isolated the affected line segment within 23 minutes. Visual observation of the failed pipe segment indicates internal wall loss due to corrosion for 5 feet in the vicinity of the fracture immediately downstream of a 4" to 6" reducer, in a low point of the pipe. Laboratory analysis of the failed pipe segment concluded that the internal corrosion was likely the result of aqueous corrosion caused by water and other contaminants in the product stream. It is also likely that under deposit corrosion created the local environment that resulted in the corrosion observed. The corrosion deposits were not consistent with microbiological-assisted corrosion, and the corrosion was not associated with the erw seam. **this report is being submitted in response to PHMSA's request for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents. This report has no further updates and is being submitted as a final.
| Report Received Date | 2011-06-23 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110194 |
| Supplemental Number | 16024 |
| Report Type | Supplemental Final |
| Operator Id | 15105 PHMSA Enforcement |
| Name | Panhandle Eastern Pipeline Co |
| Operator Street Address | 5051 Westheimer Road |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77056 |
| Local Datetime | 2011-05-29 08:07:00 |
| Location Latitude | 37.212617 Google Maps OpenStreetMap |
| Location Longitude | -100.355841 Google Maps OpenStreetMap |
| Nrc Rpt Num | 977716 NRC Report How to search |
| Nrc Rpt Datetime | 2011-05-29 13:06:00 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 45000 |
| Intentional Release | 1750 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2011-05-29 08:30:00 |
| Still Shutdown Ind | Yes |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Incident Identified Datetime | 2011-05-29 08:07:00 |
| On Site Datetime | 2011-05-29 08:07:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 67864 |
| Onshore City Name | Meade |
| Onshore County Name | Meade |
| Pipe Fac Name | Borchers Storage Field |
| Segment Name | Lowen 1-10/35-03-034-08 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 72 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 6.625 |
| Pipe Wall Thickness | 0.219 |
| Pipe Smys | 46000 |
| Pipe Specification | 5l |
| Pipe Seam Type | Longitudinal Erw - High Frequency |
| Pipe Manufacturer | Tex-Tube |
| Pipe Coating Type | Field Applied Epoxy |
| Installation Year | 1981 |
| Manufactured Year | 1981 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Length | 90 |
| Rupture Width | 14 |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 198 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Hca Fatalities Ind | No |
| Est Cost Oper Paid | 0 |
| Est Cost Unintentional Release | 180000 |
| Est Cost Intentional Release | 7000 |
| Est Cost Prop Damage | 20000 |
| Est Cost Emergency | 1000 |
| Est Cost Other | 0 |
| Prpty | 208000 |
| Accident Psig | 1639 |
| Mop Psig | 1875 |
| Mop Cfr Section | Not On Omb-Approved Form When Submitted View CFR 49 §192 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 3039 |
| Internal Inspection Ind | No |
| Diameter Change Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | Transmission In Storage Field |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | No |
| Accident Identifier | Notification From Public |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Control Room Ind | Yes |
| Invest No Controller Ind | Yes |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 2 |
| Num Employees Failed | 0 |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | General Corrosion |
| Int Water Acid Ind | Yes |
| Int Field Exam Basis Ind | Yes |
| Int Metallurgical Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | Yes |
| Corrosion Lining | No |
| Cleaning Dewatering | Not Applicable - Not Mainline Pipe |
| Corrosion Coupons | Not Applicable - Not Mainline Pipe |
| Collected Data Ind | No |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | No |
| Non Destructive Exam Ind | No |
| Preparer Name | N***** H****** |
| Preparer Title | Director Interstate Regulatory Compliance |
| Preparer Email | N*************@e*************.com |
| Preparer Telephone | 713-857-5479 |
| Authorizer Name | N***** H****** |
| Authorizer Title | Director Interstate Regulatory Compliance |
| Authorizer Telephone | 713-857-5479 |
| Authorizer Email | N*************@e*************.com |
| Narrative | At 8:07 am on may 29, 2011, panhandle eastern pipe line company received a call from a retired employee reporting blowing gas at the borchers storage field. A pepl employee was at the field and isolated the affected line segment within 23 minutes. Visual observation of the failed pipe segment indicates internal wall loss due to corrosion for 5 feet in the vicinity of the fracture immediately downstream of a 4" to 6" reducer, in a low point of the pipe. Laboratory analysis of the failed pipe segment concluded that the internal corrosion was likely the result of aqueous corrosion caused by water and other contaminants in the product stream. It is also likely that under deposit corrosion created the local environment that resulted in the corrosion observed. The corrosion deposits were not consistent with microbiological-assisted corrosion, and the corrosion was not associated with the erw seam. **this report is being submitted in response to PHMSA's request for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents. This report has no further updates and is being submitted as a final. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA