GTG incident on 2011-05-25 — CA

Operator
Pacific Gas & Electric Co
Cause
Equipment Failure
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$30,000
Incident datetime
2011-05-25 17:45
Report number
Location
CA
Narrative
During a scheduled hydrotest job, the valve stem on an inlet fire valve to a regulator station at 2445 garcia avenue in mountain view broke at 1745 hours. The valve was being operated to release water from the line. The valve was broken in the partially open position causing gas to escape. In order to isolate the broken valve to make repairs, approximately 7000 feet of line 132a (rengstorff station [mountain view golf course] to the sierra vista regulator station [at rock and sierra vista avenue]) was blown down starting at 1950 hours. Gas flow stopped at approximately 2020 hours. The delay between the breaking of the valve stem and the start of the blow down was the time required to develop the plan for the situation and to obtain the required clearances. The estimated volume of the gas released to atmosphere was 3,000 mcf which caused the need to report this incident. No service has been lost.
Detailed record list
Report Received Date
2011-06-20 00:00:00
Iyear
2011
Report Number
20110186
Supplemental Number
15990
Report Type
Supplemental Final
Operator Id
Name
Pacific Gas & Electric Co
Operator Street Address
6121 Bollinger Canyon Rd.
Operator City Name
San Ramon
Operator State Abbreviation
CA
Operator Postal Code
94583
Local Datetime
2011-05-25 17:45:00
Location Latitude
Location Longitude
Nrc Rpt Num
Nrc Rpt Datetime
2011-05-25 22:30:00
Commodity Released Type
Natural Gas
Unintentional Release
0
Intentional Release
3000
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-05-25 19:50:00
Restart Datetime
2011-05-27 17:00:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Incident Identified Datetime
2011-05-25 17:45:00
On Site Datetime
2011-05-25 17:45:00
On Off Shore
Onshore
Onshore State Abbreviation
Ca
Onshore Postal Code
94035
Onshore City Name
Mountain View
Onshore County Name
Santa Clara
Designated Location
Milepost
Designated Name
Fire Valve
Pipe Fac Name
L-132a
Segment Name
Charleston & Garcia Reg Station Valve #49-C3d
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Intrastate
System Part Involved
Belowground Storage, Including Associated Equipment And Piping
Item Involved
Valve
Valve Type
Auxiliary Or Other Valve
Installation Year
1980
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Valve Stem Broke During Operation Of Valve.
Class Location Type
Class 3 Location
Could Be Hca
Yes
Determination Method
Method2
Pir Radius
62
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
0
Est Cost Unintentional Release
0
Est Cost Intentional Release
10000
Est Cost Prop Damage
30000
Est Cost Emergency
0
Est Cost Other
0
Prpty
40000
Accident Psig
285
Mop Psig
400
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
Yes
Exceed Restriction Ind
No
Phmsa Restriction Ind
State
Pipeline Function
Transmission System
Scada In Place Ind
No
Accident Identifier
Other
Accident Details
Operator Was On Scene At Time Of Incident
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Relief Valve Ind
Yes
Eq Additional Other Ind
Yes
Eq Additional Other Details
A Portion Of The Rubber Gasket Surrounding The Valve Gate Had Become Dislodged W
Preparer Name
L******* D*******
Preparer Title
Interim Manager
Preparer Email
L***@p**.com
Preparer Telephone
9259744313
Authorizer Name
F****** Y**
Authorizer Title
Acting Director
Authorizer Telephone
9259744316
Authorizer Email
F***@p**.com
Narrative
During a scheduled hydrotest job, the valve stem on an inlet fire valve to a regulator station at 2445 garcia avenue in mountain view broke at 1745 hours. The valve was being operated to release water from the line. The valve was broken in the partially open position causing gas to escape. In order to isolate the broken valve to make repairs, approximately 7000 feet of line 132a (rengstorff station [mountain view golf course] to the sierra vista regulator station [at rock and sierra vista avenue]) was blown down starting at 1950 hours. Gas flow stopped at approximately 2020 hours. The delay between the breaking of the valve stem and the start of the blow down was the time required to develop the plan for the situation and to obtain the required clearances. The estimated volume of the gas released to atmosphere was 3,000 mcf which caused the need to report this incident. No service has been lost.
Report Received Date 2011-06-20 00:00:00
Iyear 2011
Report Number 20110186
Supplemental Number 15990
Report Type Supplemental Final
Operator Id 15007 PHMSA Enforcement
Name Pacific Gas & Electric Co
Operator Street Address 6121 Bollinger Canyon Rd.
Operator City Name San Ramon
Operator State Abbreviation CA
Operator Postal Code 94583
Local Datetime 2011-05-25 17:45:00
Location Latitude 37.425407 Google Maps OpenStreetMap
Location Longitude -122.09328 Google Maps OpenStreetMap
Nrc Rpt Num 977449 NRC Report How to search
Nrc Rpt Datetime 2011-05-25 22:30:00
Commodity Released Type Natural Gas
Unintentional Release 0
Intentional Release 3000
Accompanying Liquid 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-05-25 19:50:00
Restart Datetime 2011-05-27 17:00:00
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Incident Identified Datetime 2011-05-25 17:45:00
On Site Datetime 2011-05-25 17:45:00
On Off Shore Onshore
Onshore State Abbreviation Ca
Onshore Postal Code 94035
Onshore City Name Mountain View
Onshore County Name Santa Clara
Designated Location Milepost
Designated Name Fire Valve
Pipe Fac Name L-132a
Segment Name Charleston & Garcia Reg Station Valve #49-C3d
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Incident Area Subtype Under Soil
Crossing No
Pipe Facility Type Intrastate
System Part Involved Belowground Storage, Including Associated Equipment And Piping
Item Involved Valve
Valve Type Auxiliary Or Other Valve
Installation Year 1980
Material Involved Carbon Steel
Release Type Other
Release Type Details Valve Stem Broke During Operation Of Valve.
Class Location Type Class 3 Location
Could Be Hca Yes
Determination Method Method2
Pir Radius 62
Heat Damage Ind No
Non Heat Damage Ind No
Hca Fatalities Ind No
Est Cost Oper Paid 0
Est Cost Unintentional Release 0
Est Cost Intentional Release 10000
Est Cost Prop Damage 30000
Est Cost Emergency 0
Est Cost Other 0
Prpty 40000
Accident Psig 285
Mop Psig 400
Mop Cfr Section Not On Omb-Approved Form When Submitted View CFR 49 §192
Accident Pressure Pressure Did Not Exceed Maop
Pressure Restriction Ind Yes
Exceed Restriction Ind No
Phmsa Restriction Ind State
Pipeline Function Transmission System
Scada In Place Ind No
Accident Identifier Other
Accident Details Operator Was On Scene At Time Of Incident
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Malfunction Of Control/relief Equipment
Eq Failure Type Malfunction Of Control/relief Equipment
Relief Valve Ind Yes
Eq Additional Other Ind Yes
Eq Additional Other Details A Portion Of The Rubber Gasket Surrounding The Valve Gate Had Become Dislodged W
Preparer Name L******* D*******
Preparer Title Interim Manager
Preparer Email L***@p**.com
Preparer Telephone 9259744313
Authorizer Name F****** Y**
Authorizer Title Acting Director
Authorizer Telephone 9259744316
Authorizer Email F***@p**.com
Narrative During a scheduled hydrotest job, the valve stem on an inlet fire valve to a regulator station at 2445 garcia avenue in mountain view broke at 1745 hours. The valve was being operated to release water from the line. The valve was broken in the partially open position causing gas to escape. In order to isolate the broken valve to make repairs, approximately 7000 feet of line 132a (rengstorff station [mountain view golf course] to the sierra vista regulator station [at rock and sierra vista avenue]) was blown down starting at 1950 hours. Gas flow stopped at approximately 2020 hours. The delay between the breaking of the valve stem and the start of the blow down was the time required to develop the plan for the situation and to obtain the required clearances. The estimated volume of the gas released to atmosphere was 3,000 mcf which caused the need to report this incident. No service has been lost.

All rights reserved. Copyright © by ClearPHMSA