Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-05-03 — TX
Operator
Coffeyville Resources Crude Transportation, Llc
Cause
Corrosion Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2011-05-03 06:15
Report number
Location
TX
Narrative
On may 3rd, 2011 at approximately 6:15am, coffeyville resources crude transportation, llc (crct) operations personnel noticed crude oil in hafner run creek on his way to broome station. The station operator immediately contacted his supervisor, who dispatched the crct response team to the scene. Crct pipeline personnel shut down the bartlesville station pump and completely isolated the pipeline segment at approximately 6:45am. The crct response team arrived on-site at approximately 7:10am with containment boom, absorbent boom, skimmer, vac truck and backhoe. After initial assessment the crct response team strategically placed containment boom downstream and upstream from the leak site. Acme products company from tulsa, ok was also contacted to respond with additional equipment and personnel, arriving on-site at approximately 10:20am to assist with oil recovery. Prior to release discovery there were no abnormal operating conditions or unusual circumstances on the bartlesville to broome 8 inch segment to indicate a release.
Detailed record list
Report Received Date
2011-06-02 00:00:00
Iyear
2011
Report Number
20110165
Supplemental Number
19892
Report Type
Supplemental Final
Operator Id
5081
Name
Coffeyville Resources Crude Transportation, Llc
Operator Street Address
2277 Plaza Drive Suite 500
Operator City Name
Sugar Land
Operator State Abbreviation
TX
Operator Postal Code
77479
Local Datetime
2011-05-03 06:15:00
Location Latitude
37.027049
Location Longitude
-95.89245
Commodity Released Type
Crude Oil
Unintentional Release Bbls
95
Intentional Release Bbls
0
Recovered Bbls
93
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Local Operating Personnel, Including Contractors
Operator Type
Operator Employee
Incident Identified Datetime
2011-05-03 06:15:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-05-03 06:45:00
Still Shutdown Ind
Yes
On Site Datetime
2011-05-03 07:10:00
Nrc Rpt Datetime
2011-05-03 08:28:00
Nrc Rpt Num
974687
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Check Valve
Num Pub Evacuated
0
Pipe Fac Name
Bartlesville To Broome Pipeline
Segment Name
Bartlesville To Broome 8" Segment
Onshore State Abbreviation
Ks
Onshore Postal Code
67333
Onshore City Name
Caney
Onshore County Name
Montgomery
Designated Location
Milepost/valve Station
Designated Name
8.06
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
48
Crossing
Yes
Water Crossing Ind
Yes
Water Type
Uncased
Water Name
Hafner Run Creek
Water Depth
3
Water Subtype
Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing)
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8.625
Pipe Wall Thickness
0.188
Pipe Smys
35000
Pipe Specification
X35 (B)
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Unknown
Pipe Coating Type
Cold Applied Tape
Installation Year
1973
Manufactured Year
1973
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
Yes
Surface Contam Ind
Yes
Amount Released
95
Rel Water Name
Hafner Run Creek
Could Be Hca
Yes
Commodity Reached Hca
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
9690
Est Cost Prop Damage
0
Est Cost Emergency
68000
Est Cost Environmental
2000
Est Cost Other
20012
Est Cost Other Details
Estimated Repair Cost
Prpty
99702
Accident Psig
100
Mop Psig
400
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
Yes
Exceed Restriction Ind
No
Phmsa Restriction Ind
Not Mandated
Length Segment Isolated
13200
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
Internal Corrosion
Internal External
Internal Corrosion
Int Visual Exam Results
Localized Pitting
Int Microbiological Ind
Yes
Int Metallurgical Basis Ind
Yes
Int Low Point Pipe Loc Ind
Yes
Corrosion Inhibitors
No
Corrosion Lining
No
Cleaning Dewatering
Yes
Corrosion Coupons
No
Collected Data Ind
Yes
Axial Magnetic Flx Lkg Ind
Yes
Axial Recent Year
2011
Geometry Recent Year
2011
Has Hydrtst Conduc Before Ind
No
Direct Asmnt Conducted
Yes, But The Point Of The Accident Was Not Identified As A Dig Site
Direct Asmnt Pnt Not Idntf Yr
2006
Non Destructive Exam Ind
No
Preparer Name
M*** C******
Preparer Title
Ehs Supervisor
Preparer Email
M********@c********.com
Preparer Telephone
918-766-4691
Preparer Fax
918-333-4173
Prepared Date
2014-11-10 00:00:00
Authorizer Name
M*** C******
Authorizer Telephone
918-766-4691
Authorizer Title
Ehs Supervisor
Authorizer Email
M********@c********.com
Narrative
On may 3rd, 2011 at approximately 6:15am, coffeyville resources crude transportation, llc (crct) operations personnel noticed crude oil in hafner run creek on his way to broome station. The station operator immediately contacted his supervisor, who dispatched the crct response team to the scene. Crct pipeline personnel shut down the bartlesville station pump and completely isolated the pipeline segment at approximately 6:45am. The crct response team arrived on-site at approximately 7:10am with containment boom, absorbent boom, skimmer, vac truck and backhoe. After initial assessment the crct response team strategically placed containment boom downstream and upstream from the leak site. Acme products company from tulsa, ok was also contacted to respond with additional equipment and personnel, arriving on-site at approximately 10:20am to assist with oil recovery. Prior to release discovery there were no abnormal operating conditions or unusual circumstances on the bartlesville to broome 8 inch segment to indicate a release.
| Report Received Date | 2011-06-02 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110165 |
| Supplemental Number | 19892 |
| Report Type | Supplemental Final |
| Operator Id | 5081 PHMSA Enforcement |
| Name | Coffeyville Resources Crude Transportation, Llc |
| Operator Street Address | 2277 Plaza Drive Suite 500 |
| Operator City Name | Sugar Land |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77479 |
| Local Datetime | 2011-05-03 06:15:00 |
| Location Latitude | 37.027049 Google Maps OpenStreetMap |
| Location Longitude | -95.89245 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 95 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 93 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Local Operating Personnel, Including Contractors |
| Operator Type | Operator Employee |
| Incident Identified Datetime | 2011-05-03 06:15:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2011-05-03 06:45:00 |
| Still Shutdown Ind | Yes |
| On Site Datetime | 2011-05-03 07:10:00 |
| Nrc Rpt Datetime | 2011-05-03 08:28:00 |
| Nrc Rpt Num | 974687 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Check Valve |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Bartlesville To Broome Pipeline |
| Segment Name | Bartlesville To Broome 8" Segment |
| Onshore State Abbreviation | Ks |
| Onshore Postal Code | 67333 |
| Onshore City Name | Caney |
| Onshore County Name | Montgomery |
| Designated Location | Milepost/valve Station |
| Designated Name | 8.06 |
| Federal | No |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 48 |
| Crossing | Yes |
| Water Crossing Ind | Yes |
| Water Type | Uncased |
| Water Name | Hafner Run Creek |
| Water Depth | 3 |
| Water Subtype | Below Water, Pipe Buried Below Bottom (Not In Bored/drilled Crossing) |
| Pipe Facility Type | Interstate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 8.625 |
| Pipe Wall Thickness | 0.188 |
| Pipe Smys | 35000 |
| Pipe Specification | X35 (B) |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Manufacturer | Unknown |
| Pipe Coating Type | Cold Applied Tape |
| Installation Year | 1973 |
| Manufactured Year | 1973 |
| Material Involved | Carbon Steel |
| Release Type | Leak |
| Leak Type | Pinhole |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | No |
| Remediation Ind | No |
| Water Contam Ind | Yes |
| Surface Contam Ind | Yes |
| Amount Released | 95 |
| Rel Water Name | Hafner Run Creek |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 9690 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 68000 |
| Est Cost Environmental | 2000 |
| Est Cost Other | 20012 |
| Est Cost Other Details | Estimated Repair Cost |
| Prpty | 99702 |
| Accident Psig | 100 |
| Mop Psig | 400 |
| Accident Pressure | Pressure Did Not Exceed Mop |
| Pressure Restriction Ind | Yes |
| Exceed Restriction Ind | No |
| Phmsa Restriction Ind | Not Mandated |
| Length Segment Isolated | 13200 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Corrosion Failure |
| Cause Details | Internal Corrosion |
| Internal External | Internal Corrosion |
| Int Visual Exam Results | Localized Pitting |
| Int Microbiological Ind | Yes |
| Int Metallurgical Basis Ind | Yes |
| Int Low Point Pipe Loc Ind | Yes |
| Corrosion Inhibitors | No |
| Corrosion Lining | No |
| Cleaning Dewatering | Yes |
| Corrosion Coupons | No |
| Collected Data Ind | Yes |
| Axial Magnetic Flx Lkg Ind | Yes |
| Axial Recent Year | 2011 |
| Geometry Recent Year | 2011 |
| Has Hydrtst Conduc Before Ind | No |
| Direct Asmnt Conducted | Yes, But The Point Of The Accident Was Not Identified As A Dig Site |
| Direct Asmnt Pnt Not Idntf Yr | 2006 |
| Non Destructive Exam Ind | No |
| Preparer Name | M*** C****** |
| Preparer Title | Ehs Supervisor |
| Preparer Email | M********@c********.com |
| Preparer Telephone | 918-766-4691 |
| Preparer Fax | 918-333-4173 |
| Prepared Date | 2014-11-10 00:00:00 |
| Authorizer Name | M*** C****** |
| Authorizer Telephone | 918-766-4691 |
| Authorizer Title | Ehs Supervisor |
| Authorizer Email | M********@c********.com |
| Narrative | On may 3rd, 2011 at approximately 6:15am, coffeyville resources crude transportation, llc (crct) operations personnel noticed crude oil in hafner run creek on his way to broome station. The station operator immediately contacted his supervisor, who dispatched the crct response team to the scene. Crct pipeline personnel shut down the bartlesville station pump and completely isolated the pipeline segment at approximately 6:45am. The crct response team arrived on-site at approximately 7:10am with containment boom, absorbent boom, skimmer, vac truck and backhoe. After initial assessment the crct response team strategically placed containment boom downstream and upstream from the leak site. Acme products company from tulsa, ok was also contacted to respond with additional equipment and personnel, arriving on-site at approximately 10:20am to assist with oil recovery. Prior to release discovery there were no abnormal operating conditions or unusual circumstances on the bartlesville to broome 8 inch segment to indicate a release. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA