Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-05-03 — IL
Operator
Bp West Coast Products L.l.c.
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,500
Incident datetime
2011-05-03 09:45
Report number
Location
IL
Narrative
May 3 2011, 0945 hours two contract personnel arrived at bp mobil booster (mb) pump station to perform calibration check of high pressure shutdown switch. Personnel discovered jet fuel leaking from pressure switch that was to be calibrated. The line was down and blocked with approximate 400psig on the line at time of discovery. Jet fuel was dripping from the pressure switch to mb pump house floor, accumulating in concrete containment sump. No lel was detected with portable gas detection equipment on site. Personnel contacted bp person in charge, therein notifying bp operations @ marine terminal 2, bp operations control center, and bp maintenance. The control center contacted bp hse for notification to cal ema & csfm. Oes/state fire marshall both recorded the incident under the 11-2744 number. Bp control center also notified torrance fire dept. Contract emergency response personnel were dispatched to site for clean up. The leak was not detected by bp scada, no high sump or lel) and product was cleaned and recovered from sump and floor. Pump secured, pressure switch isolated, and permitted work plan developed with repair plan for may 3, 2011. The pressure switch was replaced and line returned at 2000 hours, may 3, 2011. The pressure switch was sent to the manufacturer for a failure analysis to determine 'fit for function'. The assessment from the manufacturer was a failed diaphragm of the high pressure switch model # 646gzem5. This specific model number contains a diaphragm constructed of polyimide material. The manufacturer recommended model number 646gzem5-7030 which contains a stainless steel diaphragm and gold contacts for robust use with petroleum based products. The -7030 configuration is a combination of two dash numbers; the -7011 stainless steel diaphragm and -7008 gold contacts. Additional investigation supported model numbers properly installed in the field are stainless steel material identified as model number 646gze5-7011. Model number identification for the differential pressure switches that failed is 646dze, the polyimide diaphragm 646dzem-7011, the pressure switch with a stainless steel diaphragm is the correct model identifcation number. Bp field search was conducted at each facility to identifiy additional pressure switches, both high pressure and differential pressure with polyimide diaphragms thereafter.
Detailed record list
Report Received Date
2011-05-27 00:00:00
Iyear
2011
Report Number
20110160
Supplemental Number
18934
Report Type
Supplemental Final
Operator Id
31610
Name
Bp West Coast Products L.l.c.
Operator Street Address
150 West Warrenville Road
Operator City Name
Naperville
Operator State Abbreviation
IL
Operator Postal Code
60563
Local Datetime
2011-05-03 09:45:00
Location Latitude
33.5124
Location Longitude
-118.2036
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
4.1
Intentional Release Bbls
0
Recovered Bbls
3.9
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-05-03 09:45:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Line 88 Was Down At Time Of Incident
On Site Datetime
2011-05-03 10:30:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Line 88
Segment Name
Csfm Id Number 0129
Onshore State Abbreviation
Ca
Onshore Postal Code
90503
Onshore City Name
Torrance
Onshore County Name
Los Angeles
Designated Location
Milepost/valve Station
Designated Name
Mobil Booster
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Intrastate
Item Involved
Instrumentation
Release Type
Leak
Leak Type
Other
Leak Type Other
Pressure Switch Diaphram
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
700
Est Cost Prop Damage
1500
Est Cost Emergency
1800
Est Cost Environmental
0
Est Cost Other
0
Prpty
4000
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Preparer Name
S****** C*****
Preparer Title
Environmental Coordinator
Preparer Email
S*************@b*.com
Preparer Telephone
5627282265
Preparer Fax
5627282760
Prepared Date
2014-01-16 00:00:00
Authorizer Name
M****** S******
Authorizer Telephone
630-536-3495
Authorizer Title
Dot Team Lead
Authorizer Email
M**************@b*.com
Narrative
M*******************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************@ marine terminal 2, bp operations control center, and bp maintenance. The control center contacted bp hse for notification to cal ema & csfm. Oes/state fire marshall both recorded the incident under the 11-2744 number. Bp control center also notified torrance fire dept. Contract emergency response personnel were dispatched to site for clean up. The leak was not detected by bp scada, no high sump or lel) and product was cleaned and recovered from sump and floor. Pump secured, pressure switch isolated, and permitted work plan developed with repair plan for may 3, 2011. The pressure switch was replaced and line returned at 2000 hours, may 3, 2011. The pressure switch was sent to the manufacturer for a failure analysis to determine 'fit for function'. The assessment from the manufacturer was a failed diaphragm of the high pressure switch model # 646gzem5. This specific model number contains a diaphragm constructed of polyimide material. The manufacturer recommended model number 646gzem5-7030 which contains a stainless steel diaphragm and gold contacts for robust use with petroleum based products. The -7030 configuration is a combination of two dash numbers; the -7011 stainless steel diaphragm and -7008 gold contacts. Additional investigation supported model numbers properly installed in the field are stainless steel material identified as model number 646gze5-7011. Model number identification for the differential pressure switches that failed is 646dze, the polyimide diaphragm 646dzem-7011, the pressure switch with a stainless steel diaphragm is the correct model identifcation number. *******************************************************************************************************************************************************************************.
| Report Received Date | 2011-05-27 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110160 |
| Supplemental Number | 18934 |
| Report Type | Supplemental Final |
| Operator Id | 31610 PHMSA Enforcement |
| Name | Bp West Coast Products L.l.c. |
| Operator Street Address | 150 West Warrenville Road |
| Operator City Name | Naperville |
| Operator State Abbreviation | IL |
| Operator Postal Code | 60563 |
| Local Datetime | 2011-05-03 09:45:00 |
| Location Latitude | 33.5124 Google Maps OpenStreetMap |
| Location Longitude | -118.2036 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 4.1 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 3.9 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2011-05-03 09:45:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Line 88 Was Down At Time Of Incident |
| On Site Datetime | 2011-05-03 10:30:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Line 88 |
| Segment Name | Csfm Id Number 0129 |
| Onshore State Abbreviation | Ca |
| Onshore Postal Code | 90503 |
| Onshore City Name | Torrance |
| Onshore County Name | Los Angeles |
| Designated Location | Milepost/valve Station |
| Designated Name | Mobil Booster |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Pipe Facility Type | Intrastate |
| Item Involved | Instrumentation |
| Release Type | Leak |
| Leak Type | Other |
| Leak Type Other | Pressure Switch Diaphram |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 700 |
| Est Cost Prop Damage | 1500 |
| Est Cost Emergency | 1800 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 4000 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Pump Or Pump-Related Equipment |
| Eq Failure Type | Pump Or Pump-Related Equipment |
| Preparer Name | S****** C***** |
| Preparer Title | Environmental Coordinator |
| Preparer Email | S*************@b*.com |
| Preparer Telephone | 5627282265 |
| Preparer Fax | 5627282760 |
| Prepared Date | 2014-01-16 00:00:00 |
| Authorizer Name | M****** S****** |
| Authorizer Telephone | 630-536-3495 |
| Authorizer Title | Dot Team Lead |
| Authorizer Email | M**************@b*.com |
| Narrative | M*******************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************************@ marine terminal 2, bp operations control center, and bp maintenance. The control center contacted bp hse for notification to cal ema & csfm. Oes/state fire marshall both recorded the incident under the 11-2744 number. Bp control center also notified torrance fire dept. Contract emergency response personnel were dispatched to site for clean up. The leak was not detected by bp scada, no high sump or lel) and product was cleaned and recovered from sump and floor. Pump secured, pressure switch isolated, and permitted work plan developed with repair plan for may 3, 2011. The pressure switch was replaced and line returned at 2000 hours, may 3, 2011. The pressure switch was sent to the manufacturer for a failure analysis to determine 'fit for function'. The assessment from the manufacturer was a failed diaphragm of the high pressure switch model # 646gzem5. This specific model number contains a diaphragm constructed of polyimide material. The manufacturer recommended model number 646gzem5-7030 which contains a stainless steel diaphragm and gold contacts for robust use with petroleum based products. The -7030 configuration is a combination of two dash numbers; the -7011 stainless steel diaphragm and -7008 gold contacts. Additional investigation supported model numbers properly installed in the field are stainless steel material identified as model number 646gze5-7011. Model number identification for the differential pressure switches that failed is 646dze, the polyimide diaphragm 646dzem-7011, the pressure switch with a stainless steel diaphragm is the correct model identifcation number. *******************************************************************************************************************************************************************************. |