HL incident on 2010-04-05 — MO

Operator
Bridger Lake, Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2010-04-05 09:10
Report number
Location
MO
Narrative
A rupture of the crude oil pipeline operated by bridger lake, llc occurred while the pipeline was on a scheduled monthly one-day downtime period for storage tank measurements. The tank volume measurements are taken and used to compare with lease operators stated input quantities. The pipeline's main manual valve to the storage tank is closed during this period to prevent additional flow into the tank during measurement. The bridger lake employee indicated that a third-party began introducing additional crude oil into the pipeline during this time. In such a case, the extra input of oil led to an overpressurization of the pipeline that resulted in the failure at the weakest spot along the pipeline, in this case, a dent. The dent occurred at some point prior to rupture. The bridger lake employee became aware of the spill on monday morning, april 5, 2010 because the pipeline pressure was extremely low, a secondly, the line 'flyer reported a dark spot in the snow between mile post 16 and 17. As of 01/23/2012, the total cost of remediation of the spill is $4,416,317.60. The final costs of the remediation is projected to be approximately $4,900,000,00. This total includes final prepping of the site and two-year monitoring.
Detailed record list
Report Received Date
2011-05-25 00:00:00
Iyear
2010
Report Number
20110155
Supplemental Number
17221
Report Type
Supplemental Final
Operator Id
Name
Bridger Lake, Llc
Operator Street Address
1 Liberty Plaza
Operator City Name
Liberty
Operator State Abbreviation
MO
Operator Postal Code
64068
Local Datetime
2010-04-05 09:10:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2010-04-05 09:10:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-04-05 09:10:00
Still Shutdown Ind
Yes
On Site Datetime
2010-04-06 08:00:00
Nrc Rpt Datetime
2010-04-10 13:19:00
Nrc Rpt Num
Ignite Ind
Yes
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Bridger Lake
Segment Name
Mile Post 17
Onshore State Abbreviation
Wy
Onshore Postal Code
82994
Onshore City Name
Robertson
Onshore County Name
Uinta
Designated Location
Milepost/valve Station
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.58
Pipe Wall Thickness
0.156
Pipe Smys
62500
Pipe Specification
Grade B Line Pipe
Pipe Seam Type
Erw � Unknown Frequency
Pipe Coating Type
Other
Pipe Coating Details
Polyken 909
Installation Year
1968
Manufactured Year
1968
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
3
Rupture Length
12
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
4000000
Est Cost Other Details
Amount To Date. Accouting Doesn't Differentiate Between Remd. And Emerg. Resp
Prpty
4000000
Accident Psig
1500
Mop Psig
800
Accident Pressure
Pressure Exceeded Mop, But Did Not Exceed 110% Of Mop
Pressure Restriction Ind
No
Length Segment Isolated
89760
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Pipeline Or Equipment Overpressured
Operation Type
Pipeline Or Equipment Overpressured
Related No Proc Ind
Yes
Category Type
Normal Operating Conditions
Operator Qualification Ind
No
Preparer Name
K**** C*******
Preparer Title
Administrator
Preparer Email
K****@b***********.com
Preparer Telephone
318-429-0271
Preparer Fax
318-429-7103
Prepared Date
2011-05-25 00:00:00
Authorizer Name
J**** E* R***
Authorizer Telephone
318-429-0271
Authorizer Title
President
Authorizer Email
J****@b***********.com
Narrative
A rupture of the crude oil pipeline operated by bridger lake, llc occurred while the pipeline was on a scheduled monthly one-day downtime period for storage tank measurements. The tank volume measurements are taken and used to compare with lease operators stated input quantities. The pipeline's main manual valve to the storage tank is closed during this period to prevent additional flow into the tank during measurement. The bridger lake employee indicated that a third-party began introducing additional crude oil into the pipeline during this time. In such a case, the extra input of oil led to an overpressurization of the pipeline that resulted in the failure at the weakest spot along the pipeline, in this case, a dent. The dent occurred at some point prior to rupture. The bridger lake employee became aware of the spill on monday morning, april 5, 2010 because the pipeline pressure was extremely low, a secondly, the line 'flyer reported a dark spot in the snow between mile post 16 and 17. As of 01/23/2012, the total cost of remediation of the spill is $4,416,317.60. The final costs of the remediation is projected to be approximately $4,900,000,00. This total includes final prepping of the site and two-year monitoring.
Report Received Date 2011-05-25 00:00:00
Iyear 2010
Report Number 20110155
Supplemental Number 17221
Report Type Supplemental Final
Operator Id 32483 PHMSA Enforcement
Name Bridger Lake, Llc
Operator Street Address 1 Liberty Plaza
Operator City Name Liberty
Operator State Abbreviation MO
Operator Postal Code 64068
Local Datetime 2010-04-05 09:10:00
Location Latitude 41.184974 Google Maps OpenStreetMap
Location Longitude -110.410612 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 0
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Air Patrol
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2010-04-05 09:10:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2010-04-05 09:10:00
Still Shutdown Ind Yes
On Site Datetime 2010-04-06 08:00:00
Nrc Rpt Datetime 2010-04-10 13:19:00
Nrc Rpt Num 936679 NRC Report How to search
Ignite Ind Yes
Explode Ind No
Upstream Valve Type Ind Manual
Downstream Valve Type Ind Manual
Num Pub Evacuated 0
Pipe Fac Name Bridger Lake
Segment Name Mile Post 17
Onshore State Abbreviation Wy
Onshore Postal Code 82994
Onshore City Name Robertson
Onshore County Name Uinta
Designated Location Milepost/valve Station
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Crossing No
Pipe Facility Type Intrastate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 6.58
Pipe Wall Thickness 0.156
Pipe Smys 62500
Pipe Specification Grade B Line Pipe
Pipe Seam Type Erw � Unknown Frequency
Pipe Coating Type Other
Pipe Coating Details Polyken 909
Installation Year 1968
Manufactured Year 1968
Material Involved Carbon Steel
Release Type Rupture
Rupture Orient Longitudinal
Rupture Width 3
Rupture Length 12
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment Yes
Remediation Ind Yes
Groundwater Remed Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 0
Est Cost Emergency 0
Est Cost Environmental 0
Est Cost Other 4000000
Est Cost Other Details Amount To Date. Accouting Doesn't Differentiate Between Remd. And Emerg. Resp
Prpty 4000000
Accident Psig 1500
Mop Psig 800
Accident Pressure Pressure Exceeded Mop, But Did Not Exceed 110% Of Mop
Pressure Restriction Ind No
Length Segment Isolated 89760
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind No
Cpm In Place Ind No
Investigation Status No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Incorrect Operation
Cause Details Pipeline Or Equipment Overpressured
Operation Type Pipeline Or Equipment Overpressured
Related No Proc Ind Yes
Category Type Normal Operating Conditions
Operator Qualification Ind No
Preparer Name K**** C*******
Preparer Title Administrator
Preparer Email K****@b***********.com
Preparer Telephone 318-429-0271
Preparer Fax 318-429-7103
Prepared Date 2011-05-25 00:00:00
Authorizer Name J**** E* R***
Authorizer Telephone 318-429-0271
Authorizer Title President
Authorizer Email J****@b***********.com
Narrative A rupture of the crude oil pipeline operated by bridger lake, llc occurred while the pipeline was on a scheduled monthly one-day downtime period for storage tank measurements. The tank volume measurements are taken and used to compare with lease operators stated input quantities. The pipeline's main manual valve to the storage tank is closed during this period to prevent additional flow into the tank during measurement. The bridger lake employee indicated that a third-party began introducing additional crude oil into the pipeline during this time. In such a case, the extra input of oil led to an overpressurization of the pipeline that resulted in the failure at the weakest spot along the pipeline, in this case, a dent. The dent occurred at some point prior to rupture. The bridger lake employee became aware of the spill on monday morning, april 5, 2010 because the pipeline pressure was extremely low, a secondly, the line 'flyer reported a dark spot in the snow between mile post 16 and 17. As of 01/23/2012, the total cost of remediation of the spill is $4,416,317.60. The final costs of the remediation is projected to be approximately $4,900,000,00. This total includes final prepping of the site and two-year monitoring.

All rights reserved. Copyright © by ClearPHMSA