Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2010-04-05 — MO
Operator
Bridger Lake, Llc
Cause
Incorrect Operation
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2010-04-05 09:10
Report number
Location
MO
Narrative
A rupture of the crude oil pipeline operated by bridger lake, llc occurred while the pipeline was on a scheduled monthly one-day downtime period for storage tank measurements. The tank volume measurements are taken and used to compare with lease operators stated input quantities. The pipeline's main manual valve to the storage tank is closed during this period to prevent additional flow into the tank during measurement. The bridger lake employee indicated that a third-party began introducing additional crude oil into the pipeline during this time. In such a case, the extra input of oil led to an overpressurization of the pipeline that resulted in the failure at the weakest spot along the pipeline, in this case, a dent. The dent occurred at some point prior to rupture. The bridger lake employee became aware of the spill on monday morning, april 5, 2010 because the pipeline pressure was extremely low, a secondly, the line 'flyer reported a dark spot in the snow between mile post 16 and 17. As of 01/23/2012, the total cost of remediation of the spill is $4,416,317.60. The final costs of the remediation is projected to be approximately $4,900,000,00. This total includes final prepping of the site and two-year monitoring.
Detailed record list
Report Received Date
2011-05-25 00:00:00
Iyear
2010
Report Number
20110155
Supplemental Number
17221
Report Type
Supplemental Final
Operator Id
32483
Name
Bridger Lake, Llc
Operator Street Address
1 Liberty Plaza
Operator City Name
Liberty
Operator State Abbreviation
MO
Operator Postal Code
64068
Local Datetime
2010-04-05 09:10:00
Location Latitude
41.184974
Location Longitude
-110.410612
Commodity Released Type
Crude Oil
Unintentional Release Bbls
0
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Air Patrol
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2010-04-05 09:10:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2010-04-05 09:10:00
Still Shutdown Ind
Yes
On Site Datetime
2010-04-06 08:00:00
Nrc Rpt Datetime
2010-04-10 13:19:00
Nrc Rpt Num
936679
Ignite Ind
Yes
Explode Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Num Pub Evacuated
0
Pipe Fac Name
Bridger Lake
Segment Name
Mile Post 17
Onshore State Abbreviation
Wy
Onshore Postal Code
82994
Onshore City Name
Robertson
Onshore County Name
Uinta
Designated Location
Milepost/valve Station
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Crossing
No
Pipe Facility Type
Intrastate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
6.58
Pipe Wall Thickness
0.156
Pipe Smys
62500
Pipe Specification
Grade B Line Pipe
Pipe Seam Type
Erw � Unknown Frequency
Pipe Coating Type
Other
Pipe Coating Details
Polyken 909
Installation Year
1968
Manufactured Year
1968
Material Involved
Carbon Steel
Release Type
Rupture
Rupture Orient
Longitudinal
Rupture Width
3
Rupture Length
12
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Groundwater Remed Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
0
Est Cost Environmental
0
Est Cost Other
4000000
Est Cost Other Details
Amount To Date. Accouting Doesn't Differentiate Between Remd. And Emerg. Resp
Prpty
4000000
Accident Psig
1500
Mop Psig
800
Accident Pressure
Pressure Exceeded Mop, But Did Not Exceed 110% Of Mop
Pressure Restriction Ind
No
Length Segment Isolated
89760
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
No
Cpm In Place Ind
No
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the accident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Incorrect Operation
Cause Details
Pipeline Or Equipment Overpressured
Operation Type
Pipeline Or Equipment Overpressured
Related No Proc Ind
Yes
Category Type
Normal Operating Conditions
Operator Qualification Ind
No
Preparer Name
K**** C*******
Preparer Title
Administrator
Preparer Email
K****@b***********.com
Preparer Telephone
318-429-0271
Preparer Fax
318-429-7103
Prepared Date
2011-05-25 00:00:00
Authorizer Name
J**** E* R***
Authorizer Telephone
318-429-0271
Authorizer Title
President
Authorizer Email
J****@b***********.com
Narrative
A rupture of the crude oil pipeline operated by bridger lake, llc occurred while the pipeline was on a scheduled monthly one-day downtime period for storage tank measurements. The tank volume measurements are taken and used to compare with lease operators stated input quantities. The pipeline's main manual valve to the storage tank is closed during this period to prevent additional flow into the tank during measurement. The bridger lake employee indicated that a third-party began introducing additional crude oil into the pipeline during this time. In such a case, the extra input of oil led to an overpressurization of the pipeline that resulted in the failure at the weakest spot along the pipeline, in this case, a dent. The dent occurred at some point prior to rupture. The bridger lake employee became aware of the spill on monday morning, april 5, 2010 because the pipeline pressure was extremely low, a secondly, the line 'flyer reported a dark spot in the snow between mile post 16 and 17. As of 01/23/2012, the total cost of remediation of the spill is $4,416,317.60. The final costs of the remediation is projected to be approximately $4,900,000,00. This total includes final prepping of the site and two-year monitoring.
| Report Received Date | 2011-05-25 00:00:00 |
|---|---|
| Iyear | 2010 |
| Report Number | 20110155 |
| Supplemental Number | 17221 |
| Report Type | Supplemental Final |
| Operator Id | 32483 PHMSA Enforcement |
| Name | Bridger Lake, Llc |
| Operator Street Address | 1 Liberty Plaza |
| Operator City Name | Liberty |
| Operator State Abbreviation | MO |
| Operator Postal Code | 64068 |
| Local Datetime | 2010-04-05 09:10:00 |
| Location Latitude | 41.184974 Google Maps OpenStreetMap |
| Location Longitude | -110.410612 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 0 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Accident Identifier | Air Patrol |
| Operator Type | Contractor Working For The Operator |
| Incident Identified Datetime | 2010-04-05 09:10:00 |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2010-04-05 09:10:00 |
| Still Shutdown Ind | Yes |
| On Site Datetime | 2010-04-06 08:00:00 |
| Nrc Rpt Datetime | 2010-04-10 13:19:00 |
| Nrc Rpt Num | 936679 NRC Report How to search |
| Ignite Ind | Yes |
| Explode Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Bridger Lake |
| Segment Name | Mile Post 17 |
| Onshore State Abbreviation | Wy |
| Onshore Postal Code | 82994 |
| Onshore City Name | Robertson |
| Onshore County Name | Uinta |
| Designated Location | Milepost/valve Station |
| Federal | No |
| Location Type | Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Crossing | No |
| Pipe Facility Type | Intrastate |
| Item Involved | Pipe |
| Pipe Type | Pipe Body |
| Pipe Diameter | 6.58 |
| Pipe Wall Thickness | 0.156 |
| Pipe Smys | 62500 |
| Pipe Specification | Grade B Line Pipe |
| Pipe Seam Type | Erw � Unknown Frequency |
| Pipe Coating Type | Other |
| Pipe Coating Details | Polyken 909 |
| Installation Year | 1968 |
| Manufactured Year | 1968 |
| Material Involved | Carbon Steel |
| Release Type | Rupture |
| Rupture Orient | Longitudinal |
| Rupture Width | 3 |
| Rupture Length | 12 |
| Wildlife Impact Ind | No |
| Soil Contamination | Yes |
| Long Term Assessment | Yes |
| Remediation Ind | Yes |
| Groundwater Remed Ind | Yes |
| Soil Remed Ind | Yes |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 0 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 0 |
| Est Cost Other | 4000000 |
| Est Cost Other Details | Amount To Date. Accouting Doesn't Differentiate Between Remd. And Emerg. Resp |
| Prpty | 4000000 |
| Accident Psig | 1500 |
| Mop Psig | 800 |
| Accident Pressure | Pressure Exceeded Mop, But Did Not Exceed 110% Of Mop |
| Pressure Restriction Ind | No |
| Length Segment Isolated | 89760 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | < 20% Smys Regulated Transmission |
| Scada In Place Ind | No |
| Cpm In Place Ind | No |
| Investigation Status | No, the facility was not monitored by a controller(s) at the time of the accident |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Incorrect Operation |
| Cause Details | Pipeline Or Equipment Overpressured |
| Operation Type | Pipeline Or Equipment Overpressured |
| Related No Proc Ind | Yes |
| Category Type | Normal Operating Conditions |
| Operator Qualification Ind | No |
| Preparer Name | K**** C******* |
| Preparer Title | Administrator |
| Preparer Email | K****@b***********.com |
| Preparer Telephone | 318-429-0271 |
| Preparer Fax | 318-429-7103 |
| Prepared Date | 2011-05-25 00:00:00 |
| Authorizer Name | J**** E* R*** |
| Authorizer Telephone | 318-429-0271 |
| Authorizer Title | President |
| Authorizer Email | J****@b***********.com |
| Narrative | A rupture of the crude oil pipeline operated by bridger lake, llc occurred while the pipeline was on a scheduled monthly one-day downtime period for storage tank measurements. The tank volume measurements are taken and used to compare with lease operators stated input quantities. The pipeline's main manual valve to the storage tank is closed during this period to prevent additional flow into the tank during measurement. The bridger lake employee indicated that a third-party began introducing additional crude oil into the pipeline during this time. In such a case, the extra input of oil led to an overpressurization of the pipeline that resulted in the failure at the weakest spot along the pipeline, in this case, a dent. The dent occurred at some point prior to rupture. The bridger lake employee became aware of the spill on monday morning, april 5, 2010 because the pipeline pressure was extremely low, a secondly, the line 'flyer reported a dark spot in the snow between mile post 16 and 17. As of 01/23/2012, the total cost of remediation of the spill is $4,416,317.60. The final costs of the remediation is projected to be approximately $4,900,000,00. This total includes final prepping of the site and two-year monitoring. |