Incident details
Operator, cause, commodity and consequences with raw source fields.
GTG incident on 2011-04-25 — TX
Operator
Panhandle Eastern Pipeline Co
Cause
Natural Force Damage
Commodity
Natural Gas
Program
GTG
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$286,759
Incident datetime
2011-04-25 02:20
Report number
Location
TX
Narrative
The pleasant hill 200 line is 22-in. Od x 0.281-in. Wt, API 5l grade x42, seamless pipeline. The cause of the coupling separation at mp 31.5 was the combined effect of local loss of soil cover in conjunction with recent high rainfall. The month preceding the incident experienced historically high quantities of rainfall. The resulting water table was high enough to produce upward buoyant forces on the pipe, while the probable saturation of the soil cover reduced its breakout resistance. The combination of buoyant forces and upward thrust forces produced by an apparent small angular misalignment at the separated coupling exceeded the upthrust resistance of the soil. **this report is being submitted in response to PHMSA's request, (docket id PHMSA-2013-0028), for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents.** this supplemental report is to acknowledge that the two relevant sections in PHMSA's request have been reviewed and no further actions were needed.
Detailed record list
Report Received Date
2011-05-24 00:00:00
Iyear
2011
Report Number
20110151
Supplemental Number
16025
Report Type
Supplemental Final
Operator Id
15105
Name
Panhandle Eastern Pipeline Co
Operator Street Address
5051 Westheimer Road
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
770565306
Local Datetime
2011-04-25 02:07:00
Location Latitude
39.573555
Location Longitude
-90.3549
Nrc Rpt Num
973910
Nrc Rpt Datetime
2011-04-25 04:45:00
Commodity Released Type
Natural Gas
Unintentional Release
58700
Intentional Release
5155
Accompanying Liquid
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-04-25 03:20:00
Restart Datetime
2011-05-05 08:10:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
30
Incident Identified Datetime
2011-04-25 02:20:00
On Site Datetime
2011-04-25 03:26:00
On Off Shore
Onshore
Onshore State Abbreviation
Il
Onshore Postal Code
62633
Onshore City Name
Manchester
Onshore County Name
Scott
Designated Location
Survey Station No.
Designated Name
1666+17
Pipe Fac Name
Pleasant Hill 200
Segment Name
41-05-002-2000
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
10
Crossing
No
Pipe Facility Type
Interstate
System Part Involved
Onshore Pipeline, Including Valve Sites
Item Involved
Other
Item Involved Details
Coupling
Installation Year
1940
Material Involved
Carbon Steel
Release Type
Other
Release Type Details
Pipe Pulled Out Of The Coupling
Class Location Type
Class 1 Location
Could Be Hca
No
Pir Radius
429
Heat Damage Ind
No
Non Heat Damage Ind
No
Hca Fatalities Ind
No
Est Cost Oper Paid
2000
Est Cost Unintentional Release
232728
Est Cost Intentional Release
21865
Est Cost Prop Damage
286759
Est Cost Emergency
3000
Est Cost Other
20000
Est Cost Other Details
Other Cost Is Failure Analysis Estimate
Prpty
566352
Accident Psig
749
Mop Psig
800
Mop Cfr Section
Not On Omb-Approved Form When Submitted
Accident Pressure
Pressure Did Not Exceed Maop
Pressure Restriction Ind
No
Upstream Valve Type Ind
Manual
Downstream Valve Type Ind
Manual
Length Segment Isolated
73898
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
Transmission System
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
Yes
Accident Identifier
Notification From Public
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest Schedule Ind
Yes
Invest No Controller Ind
Yes
Invest Other Ind
Yes
Invest Other Ind Details
Lessons Learned Regarding Staffing, Alarm Management And Labeling.
Employee Drug Test Ind
Yes
Contractor Drug Test Ind
No
Num Employees Tested
1
Num Employees Failed
0
Cause
Natural Force Damage
Cause Details
Heavy Rains/floods
Natural Force Type
Heavy Rains/floods
Heavy Rains Subtype
Flotation
Nf Extreme Weather Ind
No
Preparer Name
N***** H******
Preparer Title
Director Interstate Regulatory Compliance
Preparer Email
N*************@e*************.com
Preparer Telephone
713-857-5479
Authorizer Name
N***** H******
Authorizer Title
Director Interstate Regulatory Compliance
Authorizer Telephone
713-857-5479
Authorizer Email
N*************@e*************.com
Narrative
The pleasant hill 200 line is 22-in. Od x 0.281-in. Wt, API 5l grade x42, seamless pipeline. The cause of the coupling separation at mp 31.5 was the combined effect of local loss of soil cover in conjunction with recent high rainfall. The month preceding the incident experienced historically high quantities of rainfall. The resulting water table was high enough to produce upward buoyant forces on the pipe, while the probable saturation of the soil cover reduced its breakout resistance. The combination of buoyant forces and upward thrust forces produced by an apparent small angular misalignment at the separated coupling exceeded the upthrust resistance of the soil. **this report is being submitted in response to PHMSA's request, (docket id PHMSA-2013-0028), for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents.** this supplemental report is to acknowledge that the two relevant sections in PHMSA's request have been reviewed and no further actions were needed.
| Report Received Date | 2011-05-24 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110151 |
| Supplemental Number | 16025 |
| Report Type | Supplemental Final |
| Operator Id | 15105 PHMSA Enforcement |
| Name | Panhandle Eastern Pipeline Co |
| Operator Street Address | 5051 Westheimer Road |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 770565306 |
| Local Datetime | 2011-04-25 02:07:00 |
| Location Latitude | 39.573555 Google Maps OpenStreetMap |
| Location Longitude | -90.3549 Google Maps OpenStreetMap |
| Nrc Rpt Num | 973910 NRC Report How to search |
| Nrc Rpt Datetime | 2011-04-25 04:45:00 |
| Commodity Released Type | Natural Gas |
| Unintentional Release | 58700 |
| Intentional Release | 5155 |
| Accompanying Liquid | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2011-04-25 03:20:00 |
| Restart Datetime | 2011-05-05 08:10:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 30 |
| Incident Identified Datetime | 2011-04-25 02:20:00 |
| On Site Datetime | 2011-04-25 03:26:00 |
| On Off Shore | Onshore |
| Onshore State Abbreviation | Il |
| Onshore Postal Code | 62633 |
| Onshore City Name | Manchester |
| Onshore County Name | Scott |
| Designated Location | Survey Station No. |
| Designated Name | 1666+17 |
| Pipe Fac Name | Pleasant Hill 200 |
| Segment Name | 41-05-002-2000 |
| Federal | No |
| Location Type | Pipeline Right-Of-Way |
| Incident Area Type | Underground |
| Incident Area Subtype | Under Soil |
| Depth Of Cover | 10 |
| Crossing | No |
| Pipe Facility Type | Interstate |
| System Part Involved | Onshore Pipeline, Including Valve Sites |
| Item Involved | Other |
| Item Involved Details | Coupling |
| Installation Year | 1940 |
| Material Involved | Carbon Steel |
| Release Type | Other |
| Release Type Details | Pipe Pulled Out Of The Coupling |
| Class Location Type | Class 1 Location |
| Could Be Hca | No |
| Pir Radius | 429 |
| Heat Damage Ind | No |
| Non Heat Damage Ind | No |
| Hca Fatalities Ind | No |
| Est Cost Oper Paid | 2000 |
| Est Cost Unintentional Release | 232728 |
| Est Cost Intentional Release | 21865 |
| Est Cost Prop Damage | 286759 |
| Est Cost Emergency | 3000 |
| Est Cost Other | 20000 |
| Est Cost Other Details | Other Cost Is Failure Analysis Estimate |
| Prpty | 566352 |
| Accident Psig | 749 |
| Mop Psig | 800 |
| Mop Cfr Section | Not On Omb-Approved Form When Submitted View CFR 49 §192 |
| Accident Pressure | Pressure Did Not Exceed Maop |
| Pressure Restriction Ind | No |
| Upstream Valve Type Ind | Manual |
| Downstream Valve Type Ind | Manual |
| Length Segment Isolated | 73898 |
| Internal Inspection Ind | Yes |
| Operation Complications Ind | No |
| Pipeline Function | Transmission System |
| Scada In Place Ind | Yes |
| Scada Operating Ind | Yes |
| Scada Functional Ind | Yes |
| Scada Detection Ind | No |
| Scada Conf Ind | Yes |
| Accident Identifier | Notification From Public |
| Investigation Status | Yes, specify investigation result(s): (select all that apply) |
| Invest Schedule Ind | Yes |
| Invest No Controller Ind | Yes |
| Invest Other Ind | Yes |
| Invest Other Ind Details | Lessons Learned Regarding Staffing, Alarm Management And Labeling. |
| Employee Drug Test Ind | Yes |
| Contractor Drug Test Ind | No |
| Num Employees Tested | 1 |
| Num Employees Failed | 0 |
| Cause | Natural Force Damage |
| Cause Details | Heavy Rains/floods |
| Natural Force Type | Heavy Rains/floods |
| Heavy Rains Subtype | Flotation |
| Nf Extreme Weather Ind | No |
| Preparer Name | N***** H****** |
| Preparer Title | Director Interstate Regulatory Compliance |
| Preparer Email | N*************@e*************.com |
| Preparer Telephone | 713-857-5479 |
| Authorizer Name | N***** H****** |
| Authorizer Title | Director Interstate Regulatory Compliance |
| Authorizer Telephone | 713-857-5479 |
| Authorizer Email | N*************@e*************.com |
| Narrative | The pleasant hill 200 line is 22-in. Od x 0.281-in. Wt, API 5l grade x42, seamless pipeline. The cause of the coupling separation at mp 31.5 was the combined effect of local loss of soil cover in conjunction with recent high rainfall. The month preceding the incident experienced historically high quantities of rainfall. The resulting water table was high enough to produce upward buoyant forces on the pipe, while the probable saturation of the soil cover reduced its breakout resistance. The combination of buoyant forces and upward thrust forces produced by an apparent small angular misalignment at the separated coupling exceeded the upthrust resistance of the soil. **this report is being submitted in response to PHMSA's request, (docket id PHMSA-2013-0028), for supplemental reports from operators who submitted reports for incidents occurring after january 1, 2010, with any of the following: (1) ``pipe girth weld'' was selected as the ``item involved in incident'' in part c3 of the report. The revised report collects data about the pipe adjacent to the girth weld. (2) ``function of pipeline system'' is null in part e5f of the report. The revised report collects the function of the pipeline system for all incidents.** this supplemental report is to acknowledge that the two relevant sections in PHMSA's request have been reviewed and no further actions were needed. |