HL incident on 2011-04-12 — PA

Operator
Buckeye Partners, Lp
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2011-04-12 14:39
Report number
Location
PA
Narrative
Local personnel were conducting a valve inspection on 4/12/2011 when the multi-gas monitor registered a high lel reading. All proper emergency response notifications were made and line shutdown was completed at 14:39 local time. After excavating the valve, it was discovered that the valve body drain plug was leaking. After isolation and draindown were completed, local personnel removed the old plug and installed a new one. Our investigation showed that the valve body drain plug was loosened over time by frost. As of 4/14/2011 all cleanup and remediation are complete.
Detailed record list
Report Received Date
2011-05-12 00:00:00
Iyear
2011
Report Number
20110137
Supplemental Number
18272
Report Type
Supplemental Final
Operator Id
Name
Buckeye Partners, Lp
Operator Street Address
The Buckeye Building 6161 Hamilton Boulevar
Operator City Name
Allentown
Operator State Abbreviation
PA
Operator Postal Code
18106
Local Datetime
2011-04-12 14:20:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.48
Intentional Release Bbls
0
Recovered Bbls
0.48
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-04-12 14:39:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-04-12 14:39:00
Restart Datetime
2011-04-13 10:25:00
On Site Datetime
2011-04-12 14:39:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Huntington To Jolietville
Segment Name
Xb403jj
Onshore State Abbreviation
In
Onshore Postal Code
46750
Onshore County Name
Huntington
Designated Location
Survey Station No.
Designated Name
481+30
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Mainline
Release Type
Leak
Leak Type
Connection Failure
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
0
Est Cost Prop Damage
0
Est Cost Emergency
5200
Est Cost Environmental
20675
Est Cost Other
0
Prpty
25875
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Defective Or Loose Tubing Or Fitting
Eq Failure Type
Defective Or Loose Tubing Or Fitting
Preparer Name
B*** Y**********
Preparer Title
Compliance Specialist
Preparer Email
B***********@b******.com
Preparer Telephone
610-904-4958
Preparer Fax
610-904-4545
Prepared Date
2013-07-05 00:00:00
Authorizer Name
J*** R*******
Authorizer Telephone
610-904-4185
Authorizer Title
Group Leader Regulatory Compliance
Authorizer Email
J********@b******.com
Narrative
Local personnel were conducting a valve inspection on 4/12/2011 when the multi-gas monitor registered a high lel reading. All proper emergency response notifications were made and line shutdown was completed at 14:39 local time. After excavating the valve, it was discovered that the valve body drain plug was leaking. After isolation and draindown were completed, local personnel removed the old plug and installed a new one. Our investigation showed that the valve body drain plug was loosened over time by frost. As of 4/14/2011 all cleanup and remediation are complete.
Report Received Date 2011-05-12 00:00:00
Iyear 2011
Report Number 20110137
Supplemental Number 18272
Report Type Supplemental Final
Operator Id 1845 PHMSA Enforcement
Name Buckeye Partners, Lp
Operator Street Address The Buckeye Building 6161 Hamilton Boulevar
Operator City Name Allentown
Operator State Abbreviation PA
Operator Postal Code 18106
Local Datetime 2011-04-12 14:20:00
Location Latitude 40.78155 Google Maps OpenStreetMap
Location Longitude -85.50785 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls 0.48
Intentional Release Bbls 0
Recovered Bbls 0.48
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Incident Identified Datetime 2011-04-12 14:39:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-04-12 14:39:00
Restart Datetime 2011-04-13 10:25:00
On Site Datetime 2011-04-12 14:39:00
Ignite Ind No
Explode Ind No
Pipe Fac Name Huntington To Jolietville
Segment Name Xb403jj
Onshore State Abbreviation In
Onshore Postal Code 46750
Onshore County Name Huntington
Designated Location Survey Station No.
Designated Name 481+30
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Pipe Facility Type Interstate
Item Involved Valve
Valve Type Mainline
Release Type Leak
Leak Type Connection Failure
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 0
Est Cost Prop Damage 0
Est Cost Emergency 5200
Est Cost Environmental 20675
Est Cost Other 0
Prpty 25875
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Defective Or Loose Tubing Or Fitting
Eq Failure Type Defective Or Loose Tubing Or Fitting
Preparer Name B*** Y**********
Preparer Title Compliance Specialist
Preparer Email B***********@b******.com
Preparer Telephone 610-904-4958
Preparer Fax 610-904-4545
Prepared Date 2013-07-05 00:00:00
Authorizer Name J*** R*******
Authorizer Telephone 610-904-4185
Authorizer Title Group Leader Regulatory Compliance
Authorizer Email J********@b******.com
Narrative Local personnel were conducting a valve inspection on 4/12/2011 when the multi-gas monitor registered a high lel reading. All proper emergency response notifications were made and line shutdown was completed at 14:39 local time. After excavating the valve, it was discovered that the valve body drain plug was leaking. After isolation and draindown were completed, local personnel removed the old plug and installed a new one. Our investigation showed that the valve body drain plug was loosened over time by frost. As of 4/14/2011 all cleanup and remediation are complete.

All rights reserved. Copyright © by ClearPHMSA