Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-05-10 — TX
Operator
Holly Energy Partners - Operating, L.p.
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$500
Incident datetime
2011-05-10 07:00
Report number
Location
TX
Narrative
The cause of the release was equipment failure on the relief valve on the 12" el paso pipeline on unit #1. There was a release of approximately 1 barrel of gasoline into the sump and immediate surrounding area. A vacuum truck and cleanup crew removed the contaminated soil around the area and placed it on plastic on-site for aeration and on-site remediation. Relief valve has been replaced.
Detailed record list
Report Received Date
2011-05-10 00:00:00
Iyear
2011
Report Number
20110135
Supplemental Number
17339
Report Type
Supplemental
Operator Id
32011
Name
Holly Energy Partners - Operating, L.p.
Operator Street Address
2323 Victory Ave. Suite 1400
Operator City Name
Dallas
Operator State Abbreviation
TX
Operator Postal Code
75219
Local Datetime
2011-05-10 04:30:00
Location Latitude
31.49797
Location Longitude
-104.14246
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
1
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-05-10 07:00:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-05-10 06:10:00
Restart Datetime
2011-05-10 09:00:00
On Site Datetime
2011-05-10 07:00:00
Nrc Rpt Datetime
2011-05-10 10:30:00
Nrc Rpt Num
975843
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
12" El Paso Pipeline
Onshore State Abbreviation
Tx
Onshore Postal Code
79770
Onshore City Name
Orla
Onshore County Name
Culberson
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Valve
Valve Type
Relief Valve
Release Type
Other
Release Type Details
Equipment Failure
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
105
Est Cost Prop Damage
500
Est Cost Emergency
0
Est Cost Environmental
2000
Est Cost Other
0
Prpty
2605
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Malfunction Of Control/relief Equipment
Eq Failure Type
Malfunction Of Control/relief Equipment
Preparer Name
L*** C*******
Preparer Title
Manager - Regulatory And Ehs
Preparer Email
L************@h**********.com
Preparer Telephone
2142081260
Preparer Fax
5757484052
Prepared Date
2013-03-04 00:00:00
Authorizer Name
L*** C*******
Authorizer Telephone
2142081260
Authorizer Title
Manager - Regulatory And Ehs
Authorizer Email
L************@h**********.com
Narrative
The cause of the release was equipment failure on the relief valve on the 12" el paso pipeline on unit #1. There was a release of approximately 1 barrel of gasoline into the sump and immediate surrounding area. A vacuum truck and cleanup crew removed the contaminated soil around the area and placed it on plastic on-site for aeration and on-site remediation. Relief valve has been replaced.
| Report Received Date | 2011-05-10 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110135 |
| Supplemental Number | 17339 |
| Report Type | Supplemental |
| Operator Id | 32011 PHMSA Enforcement |
| Name | Holly Energy Partners - Operating, L.p. |
| Operator Street Address | 2323 Victory Ave. Suite 1400 |
| Operator City Name | Dallas |
| Operator State Abbreviation | TX |
| Operator Postal Code | 75219 |
| Local Datetime | 2011-05-10 04:30:00 |
| Location Latitude | 31.49797 Google Maps OpenStreetMap |
| Location Longitude | -104.14246 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Gasoline (Non-Ethanol) |
| Unintentional Release Bbls | 1 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2011-05-10 07:00:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2011-05-10 06:10:00 |
| Restart Datetime | 2011-05-10 09:00:00 |
| On Site Datetime | 2011-05-10 07:00:00 |
| Nrc Rpt Datetime | 2011-05-10 10:30:00 |
| Nrc Rpt Num | 975843 NRC Report How to search |
| Ignite Ind | No |
| Explode Ind | No |
| Pipe Fac Name | 12" El Paso Pipeline |
| Onshore State Abbreviation | Tx |
| Onshore Postal Code | 79770 |
| Onshore City Name | Orla |
| Onshore County Name | Culberson |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Pipe Facility Type | Interstate |
| Item Involved | Valve |
| Valve Type | Relief Valve |
| Release Type | Other |
| Release Type Details | Equipment Failure |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 105 |
| Est Cost Prop Damage | 500 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 2000 |
| Est Cost Other | 0 |
| Prpty | 2605 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Malfunction Of Control/relief Equipment |
| Eq Failure Type | Malfunction Of Control/relief Equipment |
| Preparer Name | L*** C******* |
| Preparer Title | Manager - Regulatory And Ehs |
| Preparer Email | L************@h**********.com |
| Preparer Telephone | 2142081260 |
| Preparer Fax | 5757484052 |
| Prepared Date | 2013-03-04 00:00:00 |
| Authorizer Name | L*** C******* |
| Authorizer Telephone | 2142081260 |
| Authorizer Title | Manager - Regulatory And Ehs |
| Authorizer Email | L************@h**********.com |
| Narrative | The cause of the release was equipment failure on the relief valve on the 12" el paso pipeline on unit #1. There was a release of approximately 1 barrel of gasoline into the sump and immediate surrounding area. A vacuum truck and cleanup crew removed the contaminated soil around the area and placed it on plastic on-site for aeration and on-site remediation. Relief valve has been replaced. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA