HL incident on 2011-03-30 — TX

Operator
Chevron Pipe Line Co
Cause
Corrosion Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$30,000
Incident datetime
2011-03-30 15:35
Report number
Location
TX
Narrative
03/30/2011 @ 15:19cdt, cpl control center in houston,tx, shutdown the no. 2 pipeline for a pressure stand-up test. All mainline valves were closed from burley sta to boise sta. At 15:45cdt field team mobilized for visual verification of product line (no.2). At 16:00cdt all pressure holding steady on the pipeline except between glenns ferry south b.V. Mp 259.4 and twin falls sta b.V. Mp 211.4. Field team notified and personnel are being dispatched to that section of gasline. Team leader procured helicopter to fly this segment of line. At 18:31cdt personnel has verified salmon falls b.V. Not completely closed and was manually closed b.V.. At 18:39cdt pressure between salmon falls mp 231 and twin falls mp 211.4 has stabilized. Pressure between salmon falls and south glenns ferry has continued to drop. Field personnel continue to walk the line between b.V. Salmon falls mp 231 and south glenns ferry. At 19;44cdt cpl contractor reports leak found on ground at mp 237.4, team leader notified field team. At 19:46cdt console supervisor notified of leak. At 19:47cdt team leader arrives at spill site. Corrosion pit was found in the 6 o'clock position. Damaged pipe was repaired & line restarted. Note; part a of this section will not allow with question 14a to enter an earlier time. We shutdown the pipeline at 14:30.
Detailed record list
Report Received Date
2011-04-26 00:00:00
Iyear
2011
Report Number
20110126
Supplemental Number
16795
Report Type
Supplemental Final
Operator Id
Name
Chevron Pipe Line Co
Operator Street Address
1400 Smith Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2011-03-30 15:35:00
Location Latitude
Location Longitude
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Gasoline (Non-Ethanol)
Unintentional Release Bbls
228
Intentional Release Bbls
0
Recovered Bbls
23
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Ground Patrol By Operator Or Its Contractor
Operator Type
Contractor Working For The Operator
Incident Identified Datetime
2011-03-30 15:35:00
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-03-30 15:35:00
Restart Datetime
2011-04-01 20:00:00
On Site Datetime
2011-03-30 15:35:00
Nrc Rpt Datetime
2011-03-31 12:05:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Upstream Valve Type Ind
Remotely Controlled
Downstream Valve Type Ind
Remotely Controlled
Pipe Fac Name
Salt Lake Products
Segment Name
#2 Gas Line/ Idl-0200 (Route Code)
Onshore State Abbreviation
Id
Onshore Postal Code
83332
Onshore City Name
Habberman
Onshore County Name
Twin Falls
Designated Location
Milepost/valve Station
Designated Name
237.4
Federal
No
Location Type
Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type
Underground
Incident Area Subtype
Under Soil
Depth Of Cover
42
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Pipe Diameter
8
Pipe Wall Thickness
0.29
Pipe Smys
42000
Pipe Seam Type
Erw � Unknown Frequency
Pipe Manufacturer
Consolidated
Pipe Coating Type
Other
Pipe Coating Details
Modified P-2
Installation Year
1952
Manufactured Year
1952
Material Involved
Carbon Steel
Release Type
Leak
Leak Type
Pinhole
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
Yes
Remediation Ind
Yes
Soil Remed Ind
Yes
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
33516
Est Cost Prop Damage
30000
Est Cost Emergency
65000
Est Cost Environmental
90000
Est Cost Other
0
Prpty
218516
Accident Psig
700
Mop Psig
1525
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Length Segment Isolated
149952
Internal Inspection Ind
Yes
Operation Complications Ind
No
Pipeline Function
< 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
Yes
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
Yes
Cpm Conf Ind
No
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
Investigation regaridng this accident is ongoing
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Corrosion Failure
Cause Details
External Corrosion
Internal External
External Corrosion
Visual Exam Results
Localized Pitting
Galvanic Corrosion Ind
Yes
Other Basis Ind
Yes
Corrosion Basis Details
Determined By Company Corrosion Specialist
Underground Location
Yes
Under Cathodic Protection Ind
Yes
Cathodic Pro Start Year
1984
Shielding Evident
No
Cathodic Survey Type
Yes
Cp Annual Survey Ind
Yes
Cp Annual Survey Year
2010
Prior Damage
No
Collected Data Ind
Yes
Geometry Recent Year
2009
Other Recent Year
2009
Has Hydrtst Conduc Before Ind
Yes
Hydrtst Most Rcnt Year
1973
Hydrtst Most Rcnt Pressure
2192
Direct Asmnt Conducted
No
Non Destructive Exam Ind
No
Preparer Name
G*** S****
Preparer Title
Team Leader
Preparer Email
G********@c******.com
Preparer Telephone
713 432-3332
Preparer Fax
713 432-3477
Prepared Date
2012-07-24 00:00:00
Authorizer Name
G*** S****
Authorizer Telephone
713 432-3332
Authorizer Title
Team Leader
Authorizer Email
G********@c******.com
Narrative
0**********@ 15:19cdt, cpl control center in houston,tx, shutdown the no. 2 pipeline for a pressure stand-up test. All mainline valves were closed from burley sta to boise sta. At 15:45cdt field team mobilized for visual verification of product line (no.2). At 16:00cdt all pressure holding steady on the pipeline except between glenns ferry south b.V. Mp 259.4 and twin falls sta b.V. Mp 211.4. Field team notified and personnel are being dispatched to that section of gasline. Team leader procured helicopter to fly this segment of line. At 18:31cdt personnel has verified salmon falls b.V. Not completely closed and was manually closed b.V.. At 18:39cdt pressure between salmon falls mp 231 and twin falls mp 211.4 has stabilized. Pressure between salmon falls and south glenns ferry has continued to drop. Field personnel continue to walk the line between b.V. Salmon falls mp 231 and south glenns ferry. At 19;44cdt cpl contractor reports leak found on ground at mp 237.4, team leader notified field team. At 19:46cdt console supervisor notified of leak. At 19:47cdt team leader arrives at spill site. Corrosion pit was found in the 6 o'clock position. Damaged pipe was repaired & line restarted. Note; part a of this section will not allow with question 14a to enter an earlier time. *********************************.
Report Received Date 2011-04-26 00:00:00
Iyear 2011
Report Number 20110126
Supplemental Number 16795
Report Type Supplemental Final
Operator Id 2731 PHMSA Enforcement
Name Chevron Pipe Line Co
Operator Street Address 1400 Smith Street
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77002
Local Datetime 2011-03-30 15:35:00
Location Latitude 42.73839 Google Maps OpenStreetMap
Location Longitude -114.948008 Google Maps OpenStreetMap
Commodity Released Type Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype Gasoline (Non-Ethanol)
Unintentional Release Bbls 228
Intentional Release Bbls 0
Recovered Bbls 23
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Ground Patrol By Operator Or Its Contractor
Operator Type Contractor Working For The Operator
Incident Identified Datetime 2011-03-30 15:35:00
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-03-30 15:35:00
Restart Datetime 2011-04-01 20:00:00
On Site Datetime 2011-03-30 15:35:00
Nrc Rpt Datetime 2011-03-31 12:05:00
Nrc Rpt Num 971623 NRC Report How to search
Ignite Ind No
Explode Ind No
Upstream Valve Type Ind Remotely Controlled
Downstream Valve Type Ind Remotely Controlled
Pipe Fac Name Salt Lake Products
Segment Name #2 Gas Line/ Idl-0200 (Route Code)
Onshore State Abbreviation Id
Onshore Postal Code 83332
Onshore City Name Habberman
Onshore County Name Twin Falls
Designated Location Milepost/valve Station
Designated Name 237.4
Federal No
Location Type Originated On Operator-Controlled Property, But Then Flowed Or Migrated Off The Property
Incident Area Type Underground
Incident Area Subtype Under Soil
Depth Of Cover 42
Crossing No
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Pipe Diameter 8
Pipe Wall Thickness 0.29
Pipe Smys 42000
Pipe Seam Type Erw � Unknown Frequency
Pipe Manufacturer Consolidated
Pipe Coating Type Other
Pipe Coating Details Modified P-2
Installation Year 1952
Manufactured Year 1952
Material Involved Carbon Steel
Release Type Leak
Leak Type Pinhole
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment Yes
Remediation Ind Yes
Soil Remed Ind Yes
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 33516
Est Cost Prop Damage 30000
Est Cost Emergency 65000
Est Cost Environmental 90000
Est Cost Other 0
Prpty 218516
Accident Psig 700
Mop Psig 1525
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Length Segment Isolated 149952
Internal Inspection Ind Yes
Operation Complications Ind No
Pipeline Function < 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind Yes
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind Yes
Cpm Conf Ind No
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details Investigation regaridng this accident is ongoing
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Corrosion Failure
Cause Details External Corrosion
Internal External External Corrosion
Visual Exam Results Localized Pitting
Galvanic Corrosion Ind Yes
Other Basis Ind Yes
Corrosion Basis Details Determined By Company Corrosion Specialist
Underground Location Yes
Under Cathodic Protection Ind Yes
Cathodic Pro Start Year 1984
Shielding Evident No
Cathodic Survey Type Yes
Cp Annual Survey Ind Yes
Cp Annual Survey Year 2010
Prior Damage No
Collected Data Ind Yes
Geometry Recent Year 2009
Other Recent Year 2009
Has Hydrtst Conduc Before Ind Yes
Hydrtst Most Rcnt Year 1973
Hydrtst Most Rcnt Pressure 2192
Direct Asmnt Conducted No
Non Destructive Exam Ind No
Preparer Name G*** S****
Preparer Title Team Leader
Preparer Email G********@c******.com
Preparer Telephone 713 432-3332
Preparer Fax 713 432-3477
Prepared Date 2012-07-24 00:00:00
Authorizer Name G*** S****
Authorizer Telephone 713 432-3332
Authorizer Title Team Leader
Authorizer Email G********@c******.com
Narrative 0**********@ 15:19cdt, cpl control center in houston,tx, shutdown the no. 2 pipeline for a pressure stand-up test. All mainline valves were closed from burley sta to boise sta. At 15:45cdt field team mobilized for visual verification of product line (no.2). At 16:00cdt all pressure holding steady on the pipeline except between glenns ferry south b.V. Mp 259.4 and twin falls sta b.V. Mp 211.4. Field team notified and personnel are being dispatched to that section of gasline. Team leader procured helicopter to fly this segment of line. At 18:31cdt personnel has verified salmon falls b.V. Not completely closed and was manually closed b.V.. At 18:39cdt pressure between salmon falls mp 231 and twin falls mp 211.4 has stabilized. Pressure between salmon falls and south glenns ferry has continued to drop. Field personnel continue to walk the line between b.V. Salmon falls mp 231 and south glenns ferry. At 19;44cdt cpl contractor reports leak found on ground at mp 237.4, team leader notified field team. At 19:46cdt console supervisor notified of leak. At 19:47cdt team leader arrives at spill site. Corrosion pit was found in the 6 o'clock position. Damaged pipe was repaired & line restarted. Note; part a of this section will not allow with question 14a to enter an earlier time. *********************************.