HL incident on 2011-03-15 — TX

Operator
Conocophillips
Cause
Material Failure Of Pipe Or Weld
Commodity
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$40,594
Incident datetime
2011-03-15 10:00
Report number
Location
TX
Narrative
Land owner reported a dead spot in wheat field. Crew was dispatched to sight, dug out the area and found a small pin hole leak on the chisholm 8" pipeline. Cppl received the "draft" metallurgical analysis report on 7-1-2011. According to keifner & associates, "the in-service leak on the kingfisher to medford segment of the cm-01 chisholm pipeline was caused by a cold weld defect in the logitudinal seam from original manufacture. More specifiaclly the defect was a through-wall lack-of-fusion (lof) measuring only 0.16-inch long at the external surface."
Detailed record list
Report Received Date
2011-04-06 00:00:00
Iyear
2011
Report Number
20110114
Supplemental Number
15920
Report Type
Supplemental Final
Operator Id
Name
Conocophillips
Operator Street Address
2331 Citywest Blvd
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77042
Local Datetime
2011-03-15 10:00:00
Location Latitude
Location Longitude
Commodity Released Type
Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype
Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls
1
Intentional Release Bbls
0
Recovered Bbls
0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
System Part Involved
Onshore Pipeline, Including Valve Sites
On Off Shore
Onshore
Ignite Ind
No
Explode Ind
No
Onshore State Abbreviation
Ok
Onshore Postal Code
73733
Federal
No
Location Type
Pipeline Right-Of-Way
Incident Area Type
Underground
Pipe Facility Type
Interstate
Item Involved
Pipe
Pipe Type
Pipe Body
Release Type
Leak
Leak Type
Pinhole
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
400
Est Cost Gas Released
45
Est Cost Prop Damage
40594
Est Cost Emergency
100
Est Cost Environmental
0
Est Cost Other
0
Prpty
41139
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Material Failure Of Pipe Or Weld
Cause Details
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Failure Type
Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Preparer Name
J*** B*********
Preparer Title
Dot Coordinator
Preparer Email
J**************@c*************.com
Preparer Telephone
9186610614
Preparer Fax
9186613381
Prepared Date
2011-07-08 00:00:00
Authorizer Name
T*** T*****
Authorizer Telephone
832-379-6255
Authorizer Title
Regulatory Compliance Manager
Authorizer Email
T************@c*************.com
Narrative
Land owner reported a dead spot in wheat field. Crew was dispatched to sight, dug out the area and found a small pin hole leak on the chisholm 8" pipeline. Cppl received the "draft" metallurgical analysis report on 7-1-2011. According to keifner & associates, "the in-service leak on the kingfisher to medford segment of the cm-01 chisholm pipeline was caused by a cold weld defect in the logitudinal seam from original manufacture. More specifiaclly the defect was a through-wall lack-of-fusion (lof) measuring only 0.16-inch long at the external surface."
Report Received Date 2011-04-06 00:00:00
Iyear 2011
Report Number 20110114
Supplemental Number 15920
Report Type Supplemental Final
Operator Id 31684 PHMSA Enforcement
Name Conocophillips
Operator Street Address 2331 Citywest Blvd
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77042
Local Datetime 2011-03-15 10:00:00
Location Latitude 36.221931 Google Maps OpenStreetMap
Location Longitude -97.747128 Google Maps OpenStreetMap
Commodity Released Type Hvl Or Other Flammable Or Toxic Fluid Which Is A Gas At Ambient Conditions
Commodity Subtype Lpg (Liquefied Petroleum Gas) / Ngl (Natural Gas Liquid)
Unintentional Release Bbls 1
Intentional Release Bbls 0
Recovered Bbls 0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
System Part Involved Onshore Pipeline, Including Valve Sites
On Off Shore Onshore
Ignite Ind No
Explode Ind No
Onshore State Abbreviation Ok
Onshore Postal Code 73733
Federal No
Location Type Pipeline Right-Of-Way
Incident Area Type Underground
Pipe Facility Type Interstate
Item Involved Pipe
Pipe Type Pipe Body
Release Type Leak
Leak Type Pinhole
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 400
Est Cost Gas Released 45
Est Cost Prop Damage 40594
Est Cost Emergency 100
Est Cost Environmental 0
Est Cost Other 0
Prpty 41139
Pipeline Function > 20% Smys Regulated Transmission
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Material Failure Of Pipe Or Weld
Cause Details Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Failure Type Original Manufacturing-Related (Not Girth Weld Or Other Welds Formed In The Field)
Preparer Name J*** B*********
Preparer Title Dot Coordinator
Preparer Email J**************@c*************.com
Preparer Telephone 9186610614
Preparer Fax 9186613381
Prepared Date 2011-07-08 00:00:00
Authorizer Name T*** T*****
Authorizer Telephone 832-379-6255
Authorizer Title Regulatory Compliance Manager
Authorizer Email T************@c*************.com
Narrative Land owner reported a dead spot in wheat field. Crew was dispatched to sight, dug out the area and found a small pin hole leak on the chisholm 8" pipeline. Cppl received the "draft" metallurgical analysis report on 7-1-2011. According to keifner & associates, "the in-service leak on the kingfisher to medford segment of the cm-01 chisholm pipeline was caused by a cold weld defect in the logitudinal seam from original manufacture. More specifiaclly the defect was a through-wall lack-of-fusion (lof) measuring only 0.16-inch long at the external surface."

All rights reserved. Copyright © by ClearPHMSA