HL incident on 2011-03-07 — OH

Operator
Marathon Pipe Line Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2011-03-07 07:50
Report number
Location
OH
Narrative
Catastrophic failure of unit 5 packing. Cause of packing failure was determined to be component fatigue.
Detailed record list
Report Received Date
2011-03-31 00:00:00
Iyear
2011
Report Number
20110110
Supplemental Number
17965
Report Type
Supplemental Final
Operator Id
Name
Marathon Pipe Line Llc
Operator Street Address
539 South Main Street
Operator City Name
Findlay
Operator State Abbreviation
OH
Operator Postal Code
45840
Local Datetime
2011-03-07 07:50:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
80
Intentional Release Bbls
0
Recovered Bbls
80
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Accident Identifier
Other
Accident Details
Notification From A Production Company.
Incident Identified Datetime
2011-03-07 07:50:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-03-07 07:50:00
Restart Datetime
2011-03-07 17:45:00
On Site Datetime
2011-03-07 08:10:00
Nrc Rpt Datetime
2011-03-07 10:10:00
Nrc Rpt Num
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Byron - Silvertip 12"-10" Crude
Segment Name
Byron - Silvertip 12"-10" Crude
Onshore State Abbreviation
Wy
Onshore Postal Code
82412
Onshore City Name
Byron
Onshore County Name
Big Horn
Designated Location
Milepost/valve Station
Designated Name
Byron Stn
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Incident Area Subtype
Typical Aboveground Facility Piping Or Appurtenance
Crossing
No
Pipe Facility Type
Interstate
Item Involved
Pump
Installation Year
1999
Material Involved
Material Other Than Carbon Steel
Material Details
Unit Packing
Release Type
Leak
Leak Type
Seal Or Packing
Wildlife Impact Ind
No
Soil Contamination
Yes
Long Term Assessment
No
Remediation Ind
No
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
8000
Est Cost Prop Damage
0
Est Cost Emergency
22572
Est Cost Environmental
0
Est Cost Other
0
Prpty
30572
Accident Psig
860
Mop Psig
1000
Accident Pressure
Pressure Did Not Exceed Mop
Pressure Restriction Ind
No
Pipeline Function
> 20% Smys Regulated Transmission
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Cpm In Place Ind
Yes
Cpm Operating Ind
Yes
Cpm Functional Ind
Yes
Cpm Detection Ind
No
Cpm Conf Ind
No
Investigation Status
Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind
Yes
Invest No Controller Ind
Yes
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Pump Or Pump-Related Equipment
Eq Failure Type
Pump Or Pump-Related Equipment
Other Pump Ind
Seal/packing Failure
Eq Additional Other Ind
Yes
Eq Additional Other Details
Component Fatigue
Preparer Name
R**** S********
Preparer Title
Hes Professional
Preparer Email
R**********@m****************.com
Preparer Telephone
4194212121
Prepared Date
2013-04-29 00:00:00
Authorizer Name
R****** B*****
Authorizer Telephone
4194212121
Authorizer Title
Regulatory Compliance Supervisor
Authorizer Email
R*******@m****************.com
Narrative
Catastrophic failure of unit 5 packing. Cause of packing failure was determined to be component fatigue.
Report Received Date 2011-03-31 00:00:00
Iyear 2011
Report Number 20110110
Supplemental Number 17965
Report Type Supplemental Final
Operator Id 32147 PHMSA Enforcement
Name Marathon Pipe Line Llc
Operator Street Address 539 South Main Street
Operator City Name Findlay
Operator State Abbreviation OH
Operator Postal Code 45840
Local Datetime 2011-03-07 07:50:00
Location Latitude 44.815639 Google Maps OpenStreetMap
Location Longitude -108.498916 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 80
Intentional Release Bbls 0
Recovered Bbls 80
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Accident Identifier Other
Accident Details Notification From A Production Company.
Incident Identified Datetime 2011-03-07 07:50:00
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-03-07 07:50:00
Restart Datetime 2011-03-07 17:45:00
On Site Datetime 2011-03-07 08:10:00
Nrc Rpt Datetime 2011-03-07 10:10:00
Nrc Rpt Num 969377 NRC Report How to search
Ignite Ind No
Explode Ind No
Num Pub Evacuated 0
Pipe Fac Name Byron - Silvertip 12"-10" Crude
Segment Name Byron - Silvertip 12"-10" Crude
Onshore State Abbreviation Wy
Onshore Postal Code 82412
Onshore City Name Byron
Onshore County Name Big Horn
Designated Location Milepost/valve Station
Designated Name Byron Stn
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Incident Area Subtype Typical Aboveground Facility Piping Or Appurtenance
Crossing No
Pipe Facility Type Interstate
Item Involved Pump
Installation Year 1999
Material Involved Material Other Than Carbon Steel
Material Details Unit Packing
Release Type Leak
Leak Type Seal Or Packing
Wildlife Impact Ind No
Soil Contamination Yes
Long Term Assessment No
Remediation Ind No
Water Contam Ind No
Could Be Hca Yes
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 8000
Est Cost Prop Damage 0
Est Cost Emergency 22572
Est Cost Environmental 0
Est Cost Other 0
Prpty 30572
Accident Psig 860
Mop Psig 1000
Accident Pressure Pressure Did Not Exceed Mop
Pressure Restriction Ind No
Pipeline Function > 20% Smys Regulated Transmission
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Cpm In Place Ind Yes
Cpm Operating Ind Yes
Cpm Functional Ind Yes
Cpm Detection Ind No
Cpm Conf Ind No
Investigation Status Yes, specify investigation result(s): (select all that apply)
Invest No Control Room Ind Yes
Invest No Controller Ind Yes
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Pump Or Pump-Related Equipment
Eq Failure Type Pump Or Pump-Related Equipment
Other Pump Ind Seal/packing Failure
Eq Additional Other Ind Yes
Eq Additional Other Details Component Fatigue
Preparer Name R**** S********
Preparer Title Hes Professional
Preparer Email R**********@m****************.com
Preparer Telephone 4194212121
Prepared Date 2013-04-29 00:00:00
Authorizer Name R****** B*****
Authorizer Telephone 4194212121
Authorizer Title Regulatory Compliance Supervisor
Authorizer Email R*******@m****************.com
Narrative Catastrophic failure of unit 5 packing. Cause of packing failure was determined to be component fatigue.

All rights reserved. Copyright © by ClearPHMSA