Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-02-23 — TX
Operator
Harbor Pipeline Co
Cause
Equipment Failure
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$397
Incident datetime
2011-02-23 13:25
Report number
Location
TX
Narrative
Investigation of the pressure switch was concluded. Ccs pressure switch failure due to dirt found in the o-ring, which caused the o-ring to not seal properly. Approximately 4 ccs switches with this configuration were replaced at the station. 1 for each of the main pumps. Report re-submitted on 3/19/2013 to include part e5f per PHMSA request.
Detailed record list
Report Received Date
2011-03-18 00:00:00
Iyear
2011
Report Number
20110098
Supplemental Number
17567
Report Type
Supplemental Final
Operator Id
7063
Name
Harbor Pipeline Co
Operator Street Address
1300 Main Street
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77002
Local Datetime
2011-02-23 13:25:00
Location Latitude
39.822925
Location Longitude
-75.175452
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.19
Intentional Release Bbls
0
Recovered Bbls
0.19
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-02-23 13:25:00
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
No
Shutdown Explain
Pipeline Was Shut Down Prior To Discovery
On Site Datetime
2011-02-23 13:25:00
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
0
Pipe Fac Name
Woodbury Pump Station
Onshore State Abbreviation
Nj
Onshore Postal Code
08086
Onshore City Name
Thorofare
Onshore County Name
Gloucester
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Instrumentation
Release Type
Leak
Leak Type
Seal Or Packing
Water Contam Ind
No
Could Be Hca
Yes
Commodity Reached Hca
Yes
High Pop Ind
Yes
High Pop Yes No
Yes
Usa Drinking Ind
Yes
Usa Drinking Yes No
Yes
Usa Ecological Ind
Yes
Usa Ecological Yes No
Yes
Est Cost Oper Paid
0
Est Cost Gas Released
28
Est Cost Prop Damage
397
Est Cost Emergency
1026
Est Cost Environmental
0
Est Cost Other
0
Prpty
1451
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material
Eq Failure Type
Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material
Preparer Name
A* K******
Preparer Title
Dot Compliance Specialist
Preparer Email
A********@s**************.com
Preparer Telephone
610-485-3030
Preparer Fax
866-741-1888
Prepared Date
2013-03-19 00:00:00
Authorizer Name
A* K******
Authorizer Telephone
610-485-3830
Authorizer Title
Dot Compliance Specialist
Authorizer Email
A********@s**************.com
Narrative
Investigation of the pressure switch was concluded. Ccs pressure switch failure due to dirt found in the o-ring, which caused the o-ring to not seal properly. Approximately 4 ccs switches with this configuration were replaced at the station. 1 for each of the main pumps. Report re-submitted on 3/19/2013 to include part e5f per PHMSA request.
| Report Received Date | 2011-03-18 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110098 |
| Supplemental Number | 17567 |
| Report Type | Supplemental Final |
| Operator Id | 7063 PHMSA Enforcement |
| Name | Harbor Pipeline Co |
| Operator Street Address | 1300 Main Street |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77002 |
| Local Datetime | 2011-02-23 13:25:00 |
| Location Latitude | 39.822925 Google Maps OpenStreetMap |
| Location Longitude | -75.175452 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 0.19 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0.19 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2011-02-23 13:25:00 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | No |
| Shutdown Explain | Pipeline Was Shut Down Prior To Discovery |
| On Site Datetime | 2011-02-23 13:25:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Num Pub Evacuated | 0 |
| Pipe Fac Name | Woodbury Pump Station |
| Onshore State Abbreviation | Nj |
| Onshore Postal Code | 08086 |
| Onshore City Name | Thorofare |
| Onshore County Name | Gloucester |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Pipe Facility Type | Interstate |
| Item Involved | Instrumentation |
| Release Type | Leak |
| Leak Type | Seal Or Packing |
| Water Contam Ind | No |
| Could Be Hca | Yes |
| Commodity Reached Hca | Yes |
| High Pop Ind | Yes |
| High Pop Yes No | Yes |
| Usa Drinking Ind | Yes |
| Usa Drinking Yes No | Yes |
| Usa Ecological Ind | Yes |
| Usa Ecological Yes No | Yes |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 28 |
| Est Cost Prop Damage | 397 |
| Est Cost Emergency | 1026 |
| Est Cost Environmental | 0 |
| Est Cost Other | 0 |
| Prpty | 1451 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material |
| Eq Failure Type | Failure Of Equipment Body (Except Pump), Tank Plate, Or Other Material |
| Preparer Name | A* K****** |
| Preparer Title | Dot Compliance Specialist |
| Preparer Email | A********@s**************.com |
| Preparer Telephone | 610-485-3030 |
| Preparer Fax | 866-741-1888 |
| Prepared Date | 2013-03-19 00:00:00 |
| Authorizer Name | A* K****** |
| Authorizer Telephone | 610-485-3830 |
| Authorizer Title | Dot Compliance Specialist |
| Authorizer Email | A********@s**************.com |
| Narrative | Investigation of the pressure switch was concluded. Ccs pressure switch failure due to dirt found in the o-ring, which caused the o-ring to not seal properly. Approximately 4 ccs switches with this configuration were replaced at the station. 1 for each of the main pumps. Report re-submitted on 3/19/2013 to include part e5f per PHMSA request. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA