HL incident on 2011-02-22 — TX

Operator
Rocky Mountain Pipeline System, Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$0
Incident datetime
2011-02-22 08:00
Report number
Location
TX
Narrative
Long term cycling of a station pump caused the bourbon tube of the pressure gauge on the pump to crack, due to fatigue failure.
Detailed record list
Report Received Date
2011-03-18 00:00:00
Iyear
2011
Report Number
20110095
Supplemental Number
17843
Report Type
Supplemental Final
Operator Id
Name
Rocky Mountain Pipeline System, Llc
Operator Street Address
333 Clay Street Suite 1600
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77210
Local Datetime
2011-02-22 08:00:00
Location Latitude
Location Longitude
Commodity Released Type
Crude Oil
Unintentional Release Bbls
3
Intentional Release Bbls
0
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-02-22 09:34:00
Restart Datetime
2011-02-22 10:44:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Four Mile Station
Onshore State Abbreviation
Mt
Onshore Postal Code
59270
Onshore City Name
Sidney
Onshore County Name
Richland
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Pressure Gauge
Release Type
Leak
Leak Type
Crack
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
300
Est Cost Prop Damage
0
Est Cost Emergency
2000
Est Cost Environmental
10000
Est Cost Other
0
Prpty
12300
Pipeline Function
> 20% Smys Regulated Gathering
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Preparer Name
S***** N*****
Preparer Title
Compliance Specialist
Preparer Email
S******@p****.com
Preparer Telephone
713.993.5673
Preparer Fax
713.646.4310
Prepared Date
2013-04-09 00:00:00
Authorizer Name
J***** R J****
Authorizer Telephone
713.993.5162
Authorizer Title
Director Environmental And Regulatory Compliance
Authorizer Email
J******@p****.com
Narrative
Long term cycling of a station pump caused the bourbon tube of the pressure gauge on the pump to crack, due to fatigue failure.
Report Received Date 2011-03-18 00:00:00
Iyear 2011
Report Number 20110095
Supplemental Number 17843
Report Type Supplemental Final
Operator Id 31666 PHMSA Enforcement
Name Rocky Mountain Pipeline System, Llc
Operator Street Address 333 Clay Street Suite 1600
Operator City Name Houston
Operator State Abbreviation TX
Operator Postal Code 77210
Local Datetime 2011-02-22 08:00:00
Location Latitude 47.92555 Google Maps OpenStreetMap
Location Longitude -104.13833 Google Maps OpenStreetMap
Commodity Released Type Crude Oil
Unintentional Release Bbls 3
Intentional Release Bbls 0
Recovered Bbls 3
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
System Part Involved Onshore Pump/meter Station Equipment And Piping
On Off Shore Onshore
Shutdown Due Accident Ind Yes
Shutdown Datetime 2011-02-22 09:34:00
Restart Datetime 2011-02-22 10:44:00
Ignite Ind No
Explode Ind No
Pipe Fac Name Four Mile Station
Onshore State Abbreviation Mt
Onshore Postal Code 59270
Onshore City Name Sidney
Onshore County Name Richland
Federal No
Location Type Totally Contained On Operator-Controlled Property
Incident Area Type Aboveground
Pipe Facility Type Interstate
Item Involved Other
Item Involved Details Pressure Gauge
Release Type Leak
Leak Type Crack
Water Contam Ind No
Could Be Hca No
Commodity Reached Hca No
Est Cost Oper Paid 0
Est Cost Gas Released 300
Est Cost Prop Damage 0
Est Cost Emergency 2000
Est Cost Environmental 10000
Est Cost Other 0
Prpty 12300
Pipeline Function > 20% Smys Regulated Gathering
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Equipment Failure
Cause Details Other Equipment Failure
Eq Failure Type Other Equipment Failure
Preparer Name S***** N*****
Preparer Title Compliance Specialist
Preparer Email S******@p****.com
Preparer Telephone 713.993.5673
Preparer Fax 713.646.4310
Prepared Date 2013-04-09 00:00:00
Authorizer Name J***** R J****
Authorizer Telephone 713.993.5162
Authorizer Title Director Environmental And Regulatory Compliance
Authorizer Email J******@p****.com
Narrative Long term cycling of a station pump caused the bourbon tube of the pressure gauge on the pump to crack, due to fatigue failure.

All rights reserved. Copyright © by ClearPHMSA