Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-02-22 — TX
Operator
Rocky Mountain Pipeline System, Llc
Cause
Equipment Failure
Commodity
Crude Oil
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$0
Incident datetime
2011-02-22 08:00
Report number
Location
TX
Narrative
Long term cycling of a station pump caused the bourbon tube of the pressure gauge on the pump to crack, due to fatigue failure.
Detailed record list
Report Received Date
2011-03-18 00:00:00
Iyear
2011
Report Number
20110095
Supplemental Number
17843
Report Type
Supplemental Final
Operator Id
31666
Name
Rocky Mountain Pipeline System, Llc
Operator Street Address
333 Clay Street Suite 1600
Operator City Name
Houston
Operator State Abbreviation
TX
Operator Postal Code
77210
Local Datetime
2011-02-22 08:00:00
Location Latitude
47.92555
Location Longitude
-104.13833
Commodity Released Type
Crude Oil
Unintentional Release Bbls
3
Intentional Release Bbls
0
Recovered Bbls
3
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
System Part Involved
Onshore Pump/meter Station Equipment And Piping
On Off Shore
Onshore
Shutdown Due Accident Ind
Yes
Shutdown Datetime
2011-02-22 09:34:00
Restart Datetime
2011-02-22 10:44:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Four Mile Station
Onshore State Abbreviation
Mt
Onshore Postal Code
59270
Onshore City Name
Sidney
Onshore County Name
Richland
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Aboveground
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Pressure Gauge
Release Type
Leak
Leak Type
Crack
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
0
Est Cost Gas Released
300
Est Cost Prop Damage
0
Est Cost Emergency
2000
Est Cost Environmental
10000
Est Cost Other
0
Prpty
12300
Pipeline Function
> 20% Smys Regulated Gathering
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Equipment Failure
Cause Details
Other Equipment Failure
Eq Failure Type
Other Equipment Failure
Preparer Name
S***** N*****
Preparer Title
Compliance Specialist
Preparer Email
S******@p****.com
Preparer Telephone
713.993.5673
Preparer Fax
713.646.4310
Prepared Date
2013-04-09 00:00:00
Authorizer Name
J***** R J****
Authorizer Telephone
713.993.5162
Authorizer Title
Director Environmental And Regulatory Compliance
Authorizer Email
J******@p****.com
Narrative
Long term cycling of a station pump caused the bourbon tube of the pressure gauge on the pump to crack, due to fatigue failure.
| Report Received Date | 2011-03-18 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110095 |
| Supplemental Number | 17843 |
| Report Type | Supplemental Final |
| Operator Id | 31666 PHMSA Enforcement |
| Name | Rocky Mountain Pipeline System, Llc |
| Operator Street Address | 333 Clay Street Suite 1600 |
| Operator City Name | Houston |
| Operator State Abbreviation | TX |
| Operator Postal Code | 77210 |
| Local Datetime | 2011-02-22 08:00:00 |
| Location Latitude | 47.92555 Google Maps OpenStreetMap |
| Location Longitude | -104.13833 Google Maps OpenStreetMap |
| Commodity Released Type | Crude Oil |
| Unintentional Release Bbls | 3 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 3 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| System Part Involved | Onshore Pump/meter Station Equipment And Piping |
| On Off Shore | Onshore |
| Shutdown Due Accident Ind | Yes |
| Shutdown Datetime | 2011-02-22 09:34:00 |
| Restart Datetime | 2011-02-22 10:44:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Pipe Fac Name | Four Mile Station |
| Onshore State Abbreviation | Mt |
| Onshore Postal Code | 59270 |
| Onshore City Name | Sidney |
| Onshore County Name | Richland |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Aboveground |
| Pipe Facility Type | Interstate |
| Item Involved | Other |
| Item Involved Details | Pressure Gauge |
| Release Type | Leak |
| Leak Type | Crack |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 0 |
| Est Cost Gas Released | 300 |
| Est Cost Prop Damage | 0 |
| Est Cost Emergency | 2000 |
| Est Cost Environmental | 10000 |
| Est Cost Other | 0 |
| Prpty | 12300 |
| Pipeline Function | > 20% Smys Regulated Gathering |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Equipment Failure |
| Cause Details | Other Equipment Failure |
| Eq Failure Type | Other Equipment Failure |
| Preparer Name | S***** N***** |
| Preparer Title | Compliance Specialist |
| Preparer Email | S******@p****.com |
| Preparer Telephone | 713.993.5673 |
| Preparer Fax | 713.646.4310 |
| Prepared Date | 2013-04-09 00:00:00 |
| Authorizer Name | J***** R J**** |
| Authorizer Telephone | 713.993.5162 |
| Authorizer Title | Director Environmental And Regulatory Compliance |
| Authorizer Email | J******@p****.com |
| Narrative | Long term cycling of a station pump caused the bourbon tube of the pressure gauge on the pump to crack, due to fatigue failure. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA