Incident details
Operator, cause, commodity and consequences with raw source fields.
HL incident on 2011-02-18 — OK
Operator
Magellan Pipeline Company, Lp
Cause
Natural Force Damage
Commodity
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Program
HL
Damage and Injuries
0 fatalities
0 injuries
Property damage (nominal)
$1,000
Incident datetime
2011-02-18 03:07
Report number
Location
OK
Narrative
The location operator had opened a valve off of the main line that allows product to flow through a mostly buried 1/2" sample line to the change building at magellan's milford facility so he could check an upcoming product interface. As he came back out of the change building for the tank switch, he noticed product pooling on the ground in the vicinity of the sample line. He closed off the valve isolating the sample line from the main line and had operations control shut down the main line. An excavation crew was called in to dig up the sample line. Upon excavation, a buried 90-degree threaded elbow was found to be leaking. The entire line was removed and replaced. All released product was recovered and the impacted soil was remediated in accordance with applicable company and state procedures.
Detailed record list
Report Received Date
2011-03-15 00:00:00
Iyear
2011
Report Number
20110088
Supplemental Number
17448
Report Type
Supplemental Final
Operator Id
22610
Name
Magellan Pipeline Company, Lp
Operator Street Address
100 West 5th Street
Operator City Name
Tulsa
Operator State Abbreviation
OK
Operator Postal Code
74103
Local Datetime
2011-02-18 03:07:00
Location Latitude
43.29194
Location Longitude
-95.15111
Commodity Released Type
Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions
Commodity Subtype
Diesel, Fuel Oil, Kerosene, Jet Fuel
Unintentional Release Bbls
0.24
Intentional Release Bbls
0
Recovered Bbls
0.24
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Incident Identified Datetime
2011-02-18 03:07:00
System Part Involved
Onshore Terminal/tank Farm Equipment And Piping
On Off Shore
Onshore
On Site Datetime
2011-02-18 03:07:00
Ignite Ind
No
Explode Ind
No
Pipe Fac Name
Milford Terminal
Segment Name
Milford Terminal
Onshore State Abbreviation
Ia
Onshore Postal Code
51351
Onshore City Name
Milford
Onshore County Name
Dickinson
Designated Location
Milepost/valve Station
Designated Name
Mp 81
Federal
No
Location Type
Totally Contained On Operator-Controlled Property
Incident Area Type
Underground
Pipe Facility Type
Interstate
Item Involved
Other
Item Involved Details
Supply Line To Change Shack
Release Type
Leak
Leak Type
Crack
Water Contam Ind
No
Could Be Hca
No
Commodity Reached Hca
No
Est Cost Oper Paid
12000
Est Cost Gas Released
25
Est Cost Prop Damage
1000
Est Cost Emergency
0
Est Cost Environmental
15000
Est Cost Other
0
Prpty
28025
Pipeline Function
> 20% Smys Regulated Transmission
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Natural Force Damage
Cause Details
Temperature
Natural Force Type
Temperature
Nf Extreme Weather Ind
No
Preparer Name
K****** L* L*******
Preparer Title
Senior Complaince Coordinator
Preparer Email
K***********@m*********.com
Preparer Telephone
918-574-7315
Preparer Fax
918-574-7246
Prepared Date
2013-03-11 00:00:00
Authorizer Name
K****** L* L*******
Authorizer Telephone
918-574-7315
Authorizer Title
Senior Complaince Coordinator
Authorizer Email
K***********@m*********.com
Narrative
The location operator had opened a valve off of the main line that allows product to flow through a mostly buried 1/2" sample line to the change building at magellan's milford facility so he could check an upcoming product interface. As he came back out of the change building for the tank switch, he noticed product pooling on the ground in the vicinity of the sample line. He closed off the valve isolating the sample line from the main line and had operations control shut down the main line. An excavation crew was called in to dig up the sample line. Upon excavation, a buried 90-degree threaded elbow was found to be leaking. The entire line was removed and replaced. All released product was recovered and the impacted soil was remediated in accordance with applicable company and state procedures.
| Report Received Date | 2011-03-15 00:00:00 |
|---|---|
| Iyear | 2011 |
| Report Number | 20110088 |
| Supplemental Number | 17448 |
| Report Type | Supplemental Final |
| Operator Id | 22610 PHMSA Enforcement |
| Name | Magellan Pipeline Company, Lp |
| Operator Street Address | 100 West 5th Street |
| Operator City Name | Tulsa |
| Operator State Abbreviation | OK |
| Operator Postal Code | 74103 |
| Local Datetime | 2011-02-18 03:07:00 |
| Location Latitude | 43.29194 Google Maps OpenStreetMap |
| Location Longitude | -95.15111 Google Maps OpenStreetMap |
| Commodity Released Type | Refined And/or Petroleum Product (Non-Hvl) Which Is A Liquid At Ambient Conditions |
| Commodity Subtype | Diesel, Fuel Oil, Kerosene, Jet Fuel |
| Unintentional Release Bbls | 0.24 |
| Intentional Release Bbls | 0 |
| Recovered Bbls | 0.24 |
| Fatality Ind | No |
| Fatal | 0 |
| Injury Ind | No |
| Injure | 0 |
| Incident Identified Datetime | 2011-02-18 03:07:00 |
| System Part Involved | Onshore Terminal/tank Farm Equipment And Piping |
| On Off Shore | Onshore |
| On Site Datetime | 2011-02-18 03:07:00 |
| Ignite Ind | No |
| Explode Ind | No |
| Pipe Fac Name | Milford Terminal |
| Segment Name | Milford Terminal |
| Onshore State Abbreviation | Ia |
| Onshore Postal Code | 51351 |
| Onshore City Name | Milford |
| Onshore County Name | Dickinson |
| Designated Location | Milepost/valve Station |
| Designated Name | Mp 81 |
| Federal | No |
| Location Type | Totally Contained On Operator-Controlled Property |
| Incident Area Type | Underground |
| Pipe Facility Type | Interstate |
| Item Involved | Other |
| Item Involved Details | Supply Line To Change Shack |
| Release Type | Leak |
| Leak Type | Crack |
| Water Contam Ind | No |
| Could Be Hca | No |
| Commodity Reached Hca | No |
| Est Cost Oper Paid | 12000 |
| Est Cost Gas Released | 25 |
| Est Cost Prop Damage | 1000 |
| Est Cost Emergency | 0 |
| Est Cost Environmental | 15000 |
| Est Cost Other | 0 |
| Prpty | 28025 |
| Pipeline Function | > 20% Smys Regulated Transmission |
| Employee Drug Test Ind | No |
| Contractor Drug Test Ind | No |
| Cause | Natural Force Damage |
| Cause Details | Temperature |
| Natural Force Type | Temperature |
| Nf Extreme Weather Ind | No |
| Preparer Name | K****** L* L******* |
| Preparer Title | Senior Complaince Coordinator |
| Preparer Email | K***********@m*********.com |
| Preparer Telephone | 918-574-7315 |
| Preparer Fax | 918-574-7246 |
| Prepared Date | 2013-03-11 00:00:00 |
| Authorizer Name | K****** L* L******* |
| Authorizer Telephone | 918-574-7315 |
| Authorizer Title | Senior Complaince Coordinator |
| Authorizer Email | K***********@m*********.com |
| Narrative | The location operator had opened a valve off of the main line that allows product to flow through a mostly buried 1/2" sample line to the change building at magellan's milford facility so he could check an upcoming product interface. As he came back out of the change building for the tank switch, he noticed product pooling on the ground in the vicinity of the sample line. He closed off the valve isolating the sample line from the main line and had operations control shut down the main line. An excavation crew was called in to dig up the sample line. Upon excavation, a buried 90-degree threaded elbow was found to be leaking. The entire line was removed and replaced. All released product was recovered and the impacted soil was remediated in accordance with applicable company and state procedures. |
External Resources
PHMSA pipeline safety insights.
Product
Features
Company
All rights reserved. Copyright © by ClearPHMSA