GD incident on 2011-03-02 — CA

Operator
Southwest Gas Corp
Cause
Pipe, Weld, Or Joint Failure
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 0 injuries
Property damage (nominal)
$1,800
Incident datetime
2011-03-02 12:41
Report number
Location
CA, NEVADA
Narrative
On wednesday, march 2, 2011, a homeowner in truckee, ca contacted southwest gas corporation due to no pressure at his heater and a natural gas odor outside. Southwest gas personnel responded to the site and discovered 97% gas over the service line. The service technician requested assistance from the construction department and asked that the fire department be notified. Ten homes were initially evacuated with the help of the fire department. A leak was repaired by replacing the service tap tee. The probable cause of the leak was a construction defect. The residences for six of the homes were allowed to return to their residences that evening once the hazard was eliminated and gas reads at the base of the structures were non-hazardous. Due to residual gas reads at the foundation of the structures of the remaining four homes, their evacuation lasted for 12 days until, march 14, 2011. The customers were allowed to return to their residences once the hazard was eliminated and gas reads at the base of the structures were non-hazardous. Aeration of residual gas away from the structures continued until march 25, 2011 when gas reads were eliminated. On thursday, march 21, 2011, southwest gas became aware of local media attention due to the extended evacuation and notified the california public utilities commission (cpuc) based on their reporting standards. On march 23, 2011, it was determined by southwest gas that the extended aeration and customer reimbursement costs would accumulate above the $50,000 reportable threshold. The incident was then reported to the national response center.
Detailed record list
Occurred At
2011-03-02 12:41:00
Year
2011
Report Received Date
2011-04-19 00:00:00
Iyear
2011.0
Report Number
20110062.0
Supplemental Number
15317.0
Report Type
Supplemental Final
Operator Id
Name
Southwest Gas Corp
Operator Street Address
400 Eagle Station Lane
Operator City Name
Carson City
Operator State Abbreviation
NV
Operator Postal Code
897018401
Local Datetime
2011-03-02 12:41:00
Location Street Address
10397 Royal Crest
Location City Name
Truckee
Location County Name
Nevada
Location State Abbreviation
CA
Location Postal Code
96161-1187
Location Latitude
Location Longitude
Nrc Rpt Datetime
2011-03-23 15:45:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
158.0
Fatality Ind
No
Fatal
0
Injury Ind
No
Injure
0
Ignite Ind
No
Explode Ind
No
Num Pub Evacuated
10.0
Incident Identified Datetime
2011-03-02 12:41:00
On Site Datetime
2011-03-02 13:25:00
Federal
No
Location Type
Public Property
Incident Area Type
Underground
Incident Area Subtype
Under Pavement
Depth Of Cover
36.0
Crossing
No
Pipe Facility Type
Privately Owned
System Part Involved
Service
Installation Year
1996.0
Pipe Diameter
0.5
Pipe Specification
Astm D2513
Pipe Manufacturer
Driscopipe
Material Involved
Plastic
Plastic Type
Polyethylene (Pe)
Wt Plastic
0.091
Material Pe Pipe Code
3408
Release Type
Leak
Leak Type
Connection Failure
Class Location Type
Class 3 Location
Est Cost Oper Paid
900.0
Est Cost Prop Damage
1800.0
Est Cost Emergency
67929.0
Est Cost Other
17972.0
Est Cost Other Details
Customer Reimbursement During Evacuation.
Est Cost Unintentional Release
1275.0
Prpty
89876.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
6.0
Accident Psig
60.0
Normal Psig
60.0
Mop Psig
60.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind
No
Contractor Drug Test Ind
No
Cause
Pipe, Weld, Or Joint Failure
Cause Details
Mechanical Joint Failure
Pwjf Failure Type
Mechanical Joint Failure
Mec Fitting Involved
Nut Follower
Mec Fitting Type
Service Or Main Tee
Mec Manufacturer
Continental
Mec Fitting Material
Other
Mec Fitting Material Detail
Materials Joined: 1st Plastic, 2nd Plastic
Additional Other Ind
Yes
Result Construction Ind
Yes
Result Construction Subtype
Procedure Not Followed
Hydrotest Conducted Ind
Yes
Hydrotest Conducted Year
1996
Hydrotest Pressure
90
Preparer Name
M****** H******
Preparer Title
Supervisor Engineering
Preparer Email
M**************@s****.com
Preparer Telephone
775-887-2871
Preparer Fax
775-884-3012
Authorizer Name
B**** E*****
Authorizer Title
Director District Opererations Northern Nevada
Authorizer Telephone
775-887-2744
Authorizer Email
B***********@s****.com
Narrative
On wednesday, march 2, 2011, a homeowner in truckee, ca contacted southwest gas corporation due to no pressure at his heater and a natural gas odor outside. Southwest gas personnel responded to the site and discovered 97% gas over the service line. The service technician requested assistance from the construction department and asked that the fire department be notified. Ten homes were initially evacuated with the help of the fire department. A leak was repaired by replacing the service tap tee. The probable cause of the leak was a construction defect. The residences for six of the homes were allowed to return to their residences that evening once the hazard was eliminated and gas reads at the base of the structures were non-hazardous. Due to residual gas reads at the foundation of the structures of the remaining four homes, their evacuation lasted for 12 days until, march 14, 2011. The customers were allowed to return to their residences once the hazard was eliminated and gas reads at the base of the structures were non-hazardous. Aeration of residual gas away from the structures continued until march 25, 2011 when gas reads were eliminated. On thursday, march 21, 2011, southwest gas became aware of local media attention due to the extended evacuation and notified the california public utilities commission (cpuc) based on their reporting standards. On march 23, 2011, it was determined by southwest gas that the extended aeration and customer reimbursement costs would accumulate above the $50,000 reportable threshold. The incident was then reported to the national response center.
Occurred At 2011-03-02 12:41:00
Year 2011
Report Received Date 2011-04-19 00:00:00
Iyear 2011.0
Report Number 20110062.0
Supplemental Number 15317.0
Report Type Supplemental Final
Operator Id 18536 PHMSA Enforcement
Name Southwest Gas Corp
Operator Street Address 400 Eagle Station Lane
Operator City Name Carson City
Operator State Abbreviation NV
Operator Postal Code 897018401
Local Datetime 2011-03-02 12:41:00
Location Street Address 10397 Royal Crest
Location City Name Truckee
Location County Name Nevada
Location State Abbreviation CA
Location Postal Code 96161-1187
Location Latitude 39.34868 Google Maps OpenStreetMap
Location Longitude -120.10775 Google Maps OpenStreetMap
Nrc Rpt Datetime 2011-03-23 15:45:00
Nrc Rpt Num 970970 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 158.0
Fatality Ind No
Fatal 0
Injury Ind No
Injure 0
Ignite Ind No
Explode Ind No
Num Pub Evacuated 10.0
Incident Identified Datetime 2011-03-02 12:41:00
On Site Datetime 2011-03-02 13:25:00
Federal No
Location Type Public Property
Incident Area Type Underground
Incident Area Subtype Under Pavement
Depth Of Cover 36.0
Crossing No
Pipe Facility Type Privately Owned
System Part Involved Service
Installation Year 1996.0
Pipe Diameter 0.5
Pipe Specification Astm D2513
Pipe Manufacturer Driscopipe
Material Involved Plastic
Plastic Type Polyethylene (Pe)
Wt Plastic 0.091
Material Pe Pipe Code 3408
Release Type Leak
Leak Type Connection Failure
Class Location Type Class 3 Location
Est Cost Oper Paid 900.0
Est Cost Prop Damage 1800.0
Est Cost Emergency 67929.0
Est Cost Other 17972.0
Est Cost Other Details Customer Reimbursement During Evacuation.
Est Cost Unintentional Release 1275.0
Prpty 89876.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 6.0
Accident Psig 60.0
Normal Psig 60.0
Mop Psig 60.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind No
Accident Identifier Notification From Public
Investigation Status No, the facility was not monitored by a controller(s) at the time of the incident
Employee Drug Test Ind No
Contractor Drug Test Ind No
Cause Pipe, Weld, Or Joint Failure
Cause Details Mechanical Joint Failure
Pwjf Failure Type Mechanical Joint Failure
Mec Fitting Involved Nut Follower
Mec Fitting Type Service Or Main Tee
Mec Manufacturer Continental
Mec Fitting Material Other
Mec Fitting Material Detail Materials Joined: 1st Plastic, 2nd Plastic
Additional Other Ind Yes
Result Construction Ind Yes
Result Construction Subtype Procedure Not Followed
Hydrotest Conducted Ind Yes
Hydrotest Conducted Year 1996
Hydrotest Pressure 90
Preparer Name M****** H******
Preparer Title Supervisor Engineering
Preparer Email M**************@s****.com
Preparer Telephone 775-887-2871
Preparer Fax 775-884-3012
Authorizer Name B**** E*****
Authorizer Title Director District Opererations Northern Nevada
Authorizer Telephone 775-887-2744
Authorizer Email B***********@s****.com
Narrative On wednesday, march 2, 2011, a homeowner in truckee, ca contacted southwest gas corporation due to no pressure at his heater and a natural gas odor outside. Southwest gas personnel responded to the site and discovered 97% gas over the service line. The service technician requested assistance from the construction department and asked that the fire department be notified. Ten homes were initially evacuated with the help of the fire department. A leak was repaired by replacing the service tap tee. The probable cause of the leak was a construction defect. The residences for six of the homes were allowed to return to their residences that evening once the hazard was eliminated and gas reads at the base of the structures were non-hazardous. Due to residual gas reads at the foundation of the structures of the remaining four homes, their evacuation lasted for 12 days until, march 14, 2011. The customers were allowed to return to their residences once the hazard was eliminated and gas reads at the base of the structures were non-hazardous. Aeration of residual gas away from the structures continued until march 25, 2011 when gas reads were eliminated. On thursday, march 21, 2011, southwest gas became aware of local media attention due to the extended evacuation and notified the california public utilities commission (cpuc) based on their reporting standards. On march 23, 2011, it was determined by southwest gas that the extended aeration and customer reimbursement costs would accumulate above the $50,000 reportable threshold. The incident was then reported to the national response center.

All rights reserved. Copyright © by ClearPHMSA