GD incident on 2010-11-02 — OH

Operator
Duke Energy Ohio
Cause
Incorrect Operation
Commodity
Natural Gas
Program
GD
Damage and Injuries
0 fatalities 7 injuries
Property damage (nominal)
$0
Incident datetime
2010-11-02 21:46
Report number
Location
OH, WARREN
Narrative
Refer to the attached ohio state fire marshal - fire and explosion investigation bureau incident report for the "initial report". Note: this report was initiallly filed as "other incident cause" based on the investigation by the ohio state fire marshal. It was determined after further investigation by the public utilities commision of ohio (puco), that a supplemental report be submitted under "incorrect operations". It should be noted that when this incident occurred on november 2, 2010, a courtesy call was made to the puco hotline to inform them of the incident. Based on the information known at the time, puco staff instructed duke energy that this occurred on non-jurisdictional pipeline and was not reportable. After an on-site investigation meeting with various duke energy representatives and puco investigators on december 2, 2010, the puco staff instructed duke energy to file an incident report (initial report), after their conversation with PHMSA (pipeline and hazardous materials safety administration) staff. Duke energy relied on the ohio state fire marshal's incident report and used that as the explanation to the incident. After puco followed up with additional investigation of this incident, puco recommended by letter dated february 17, 2011, that duke energy submit a supplemental report to indicate the incident was caused due to "incorrect operations".
Detailed record list
Occurred At
2010-11-02 21:46:00
Year
2010
Report Received Date
2011-01-07 00:00:00
Iyear
2010.0
Report Number
20110004.0
Supplemental Number
15264.0
Report Type
Supplemental Final
Operator Id
Name
Duke Energy Ohio
Operator Street Address
139 East Fourth Street Po Box 960 - Room 460-Annex
Operator City Name
Cincinnati
Operator State Abbreviation
OH
Operator Postal Code
45202
Local Datetime
2010-11-02 21:46:00
Location Street Address
800 Franklin Rd - Apt #33
Location City Name
Lebanon
Location County Name
Warren
Location State Abbreviation
OH
Location Postal Code
45036
Location Latitude
Location Longitude
Nrc Rpt Datetime
2010-12-08 08:25:00
Nrc Rpt Num
Commodity Released Type
Natural Gas
Unintentional Release
1500.0
Fatality Ind
No
Fatal
0
Injury Ind
Yes
Num Emp Injuries
0
Num Contr Injuries
0
Num Er Injuries
0
Num Worker Injuries
0
Num Gp Injuries
7
Injure
7
Ignite Ind
Yes
Explode Ind
Yes
Num Pub Evacuated
30.0
Incident Identified Datetime
2010-11-02 21:46:00
On Site Datetime
2010-11-02 22:30:00
Federal
No
Location Type
Private Property
Incident Area Type
Aboveground
Incident Area Subtype
Other
Incident Area Details
Houseline Piping
Crossing
No
Pipe Facility Type
Other
Pipe Type Other
Natural Gas Distribution, Publicly Owned
System Part Involved
Other
System Part Details
Houseline Piping
Installation Year
1973.0
Material Involved
Other
Material Details
1/2" Flexible Gas Line
Release Type
Other
Release Type Details
Unknown
Class Location Type
Class 4 Location
Est Cost Oper Paid
0.0
Est Cost Prop Damage
0.0
Est Cost Emergency
0.0
Est Cost Other
0.0
Est Cost Unintentional Release
0.0
Prpty
0.0
Commercial Affected
0.0
Industrial Affected
0.0
Residences Affected
30.0
Accident Psig
251.0
Normal Psig
251.0
Mop Psig
300.0
Accident Pressure
Pressure Did Not Exceed Maop
Scada In Place Ind
Yes
Scada Operating Ind
Yes
Scada Functional Ind
Yes
Scada Detection Ind
No
Scada Conf Ind
No
Accident Identifier
Notification From Public
Investigation Status
No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details
G*****************************************@ ***************************************************************************************************************************************************.
Employee Drug Test Ind
No
Contractor Drug Test Ind
Yes
Num Contractors Tested
2
Num Contractors Failed
0
Cause
Incorrect Operation
Cause Details
Other Incorrect Operation
Operation Type
Other Incorrect Operation
Operation Details
Contractor Performing Gas Meter Turn On Activity Did Not Follow Gas Procedure Properly.
Related Failure Follow Ind
Yes
Category Type
Routine Maintenance
Operator Qualification Ind
Yes
Qualified Individuals
Yes, They Were Qualified For The Task(S)
Preparer Name
J**** T C*******
Preparer Title
Lead Regulatory Compliance Specialist - Gas Ops
Preparer Email
J***********@d**********.com
Preparer Telephone
513-287-2824
Preparer Fax
513-651-5229
Authorizer Name
J**** E M******
Authorizer Title
Vice President Gas Operations
Authorizer Telephone
513-287-2535
Authorizer Email
J**********@d**********.com
Narrative
Refer to the attached ohio state fire marshal - fire and explosion investigation bureau incident report for the "initial report". Note: this report was initiallly filed as "other incident cause" based on the investigation by the ohio state fire marshal. It was determined after further investigation by the public utilities commision of ohio (puco), that a supplemental report be submitted under "incorrect operations". It should be noted that when this incident occurred on november 2, 2010, a courtesy call was made to the puco hotline to inform them of the incident. Based on the information known at the time, puco staff instructed duke energy that this occurred on non-jurisdictional pipeline and was not reportable. After an on-site investigation meeting with various duke energy representatives and puco investigators on december 2, 2010, the puco staff instructed duke energy to file an incident report (initial report), after their conversation with PHMSA (pipeline and hazardous materials safety administration) staff. Duke energy relied on the ohio state fire marshal's incident report and used that as the explanation to the incident. After puco followed up with additional investigation of this incident, puco recommended by letter dated february 17, 2011, that duke energy submit a supplemental report to indicate the incident was caused due to "incorrect operations".
Occurred At 2010-11-02 21:46:00
Year 2010
Report Received Date 2011-01-07 00:00:00
Iyear 2010.0
Report Number 20110004.0
Supplemental Number 15264.0
Report Type Supplemental Final
Operator Id 2364 PHMSA Enforcement
Name Duke Energy Ohio
Operator Street Address 139 East Fourth Street Po Box 960 - Room 460-Annex
Operator City Name Cincinnati
Operator State Abbreviation OH
Operator Postal Code 45202
Local Datetime 2010-11-02 21:46:00
Location Street Address 800 Franklin Rd - Apt #33
Location City Name Lebanon
Location County Name Warren
Location State Abbreviation OH
Location Postal Code 45036
Location Latitude 39.44099 Google Maps OpenStreetMap
Location Longitude -84.2193 Google Maps OpenStreetMap
Nrc Rpt Datetime 2010-12-08 08:25:00
Nrc Rpt Num 961668 NRC Report How to search
Commodity Released Type Natural Gas
Unintentional Release 1500.0
Fatality Ind No
Fatal 0
Injury Ind Yes
Num Emp Injuries 0
Num Contr Injuries 0
Num Er Injuries 0
Num Worker Injuries 0
Num Gp Injuries 7
Injure 7
Ignite Ind Yes
Explode Ind Yes
Num Pub Evacuated 30.0
Incident Identified Datetime 2010-11-02 21:46:00
On Site Datetime 2010-11-02 22:30:00
Federal No
Location Type Private Property
Incident Area Type Aboveground
Incident Area Subtype Other
Incident Area Details Houseline Piping
Crossing No
Pipe Facility Type Other
Pipe Type Other Natural Gas Distribution, Publicly Owned
System Part Involved Other
System Part Details Houseline Piping
Installation Year 1973.0
Material Involved Other
Material Details 1/2" Flexible Gas Line
Release Type Other
Release Type Details Unknown
Class Location Type Class 4 Location
Est Cost Oper Paid 0.0
Est Cost Prop Damage 0.0
Est Cost Emergency 0.0
Est Cost Other 0.0
Est Cost Unintentional Release 0.0
Prpty 0.0
Commercial Affected 0.0
Industrial Affected 0.0
Residences Affected 30.0
Accident Psig 251.0
Normal Psig 251.0
Mop Psig 300.0
Accident Pressure Pressure Did Not Exceed Maop
Scada In Place Ind Yes
Scada Operating Ind Yes
Scada Functional Ind Yes
Scada Detection Ind No
Scada Conf Ind No
Accident Identifier Notification From Public
Investigation Status No, the operator did not find that an investigation of the controller(s) actions or control room issues was necessary due to: (provide an explanation for why the operator did not investigate)
Investigation Status Details G*****************************************@ ***************************************************************************************************************************************************.
Employee Drug Test Ind No
Contractor Drug Test Ind Yes
Num Contractors Tested 2
Num Contractors Failed 0
Cause Incorrect Operation
Cause Details Other Incorrect Operation
Operation Type Other Incorrect Operation
Operation Details Contractor Performing Gas Meter Turn On Activity Did Not Follow Gas Procedure Properly.
Related Failure Follow Ind Yes
Category Type Routine Maintenance
Operator Qualification Ind Yes
Qualified Individuals Yes, They Were Qualified For The Task(S)
Preparer Name J**** T C*******
Preparer Title Lead Regulatory Compliance Specialist - Gas Ops
Preparer Email J***********@d**********.com
Preparer Telephone 513-287-2824
Preparer Fax 513-651-5229
Authorizer Name J**** E M******
Authorizer Title Vice President Gas Operations
Authorizer Telephone 513-287-2535
Authorizer Email J**********@d**********.com
Narrative Refer to the attached ohio state fire marshal - fire and explosion investigation bureau incident report for the "initial report". Note: this report was initiallly filed as "other incident cause" based on the investigation by the ohio state fire marshal. It was determined after further investigation by the public utilities commision of ohio (puco), that a supplemental report be submitted under "incorrect operations". It should be noted that when this incident occurred on november 2, 2010, a courtesy call was made to the puco hotline to inform them of the incident. Based on the information known at the time, puco staff instructed duke energy that this occurred on non-jurisdictional pipeline and was not reportable. After an on-site investigation meeting with various duke energy representatives and puco investigators on december 2, 2010, the puco staff instructed duke energy to file an incident report (initial report), after their conversation with PHMSA (pipeline and hazardous materials safety administration) staff. Duke energy relied on the ohio state fire marshal's incident report and used that as the explanation to the incident. After puco followed up with additional investigation of this incident, puco recommended by letter dated february 17, 2011, that duke energy submit a supplemental report to indicate the incident was caused due to "incorrect operations".